BRENNEN

Industries / Construction and property / Commercial and residential construction / Electrical contracting

Panels and switchgear

This work installs and maintains the panels, breakers, fuses and switchboards that split incoming power into circuits and cut it off when something goes wrong.

6

Milestones achieved, from 1924 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1924

    A breaker you can reset

    A fuse melts when too much current flows and must then be replaced. A German patent application of 8 November 1924 covered a miniature circuit breaker, which trips on overload and can simply be switched back on. It was the work of Hugo Stotz, who had sold his company Stotz-Kontakt to Brown, Boveri & Cie (BBC) in 1918, and his chief engineer Heinrich Schachtner; the US patent, no. 1,629,640, issued in Schachtner's name on 24 May 1927, and serial production began in 1928, by Electrical Review's account. In US homes, Westinghouse sold a "No-Fuze" load center in the 1930s, and by 1960 breakers had almost completely replaced fuses in new houses, by UL engineer David Dini's account.

    patents.google.comelectricalreview.co.ukinspectapedia.com

    Credit

    Hugo Stotz; Heinrich Schachtner; Stotz-Kontakt and BBC, now part of ABB

  2. 1941

    Fuses that stop pennies

    Plug fuses screwed into the same base as a light bulb, so a 30 ampere fuse fit a 15 ampere circuit, and people bridged blown fuses with a penny. The 1940 NEC required that, from 1 November 1941, new installations accept only "Type S" fuses, made in sizes that will not fit a holder meant for a smaller circuit and shaped so that a coin cannot bridge them. NFPA's 1940 committee report names the S for Fred Squires of the International Association of Electrical Inspectors (IAEI), who pressed for the rule, by Dini's account.

    LessonIf protection can be defeated with a coin, some people will defeat it, so the design has to prevent it.

    inspectapedia.com

    Credit

    Fred Squires (IAEI); NFPA's Electrical Committee

  3. 1982

    Arc flash is measured

    An arc flash is the burst of heat and light when current jumps through the air between conductors, for example when a tool slips inside live switchgear. Ralph H. Lee's paper "The Other Electrical Hazard: Electric Arc Blast Burns" (IEEE Transactions on Industry Applications, May 1982) estimated the heat an arc gives off and the level that causes a "just curable burn". Many consider it the start of modern arc flash practice, writes the electrical safety engineer Jim Phillips. NFPA 70E, a work-safety standard written at the request of the US Occupational Safety and Health Administration (OSHA) and first published in 1979, first mentioned arc flash in 1995; IEEE 1584, a guide to calculating arc energy, appeared in 2002, and the 2002 NEC first required arc flash warning labels on equipment.

    LessonShock was not the only danger; burns from arcs needed their own measure and their own protective clothing.

    doi.orgcdn.brainfiller.com

    Credit

    Ralph H. Lee; NFPA; IEEE

  4. 1983

    Breaker inquiry closes without recall

    From June 1980 CPSC investigated Federal Pacific Electric's Stab-Lok home breakers, mainly two-pole breakers made before Reliance Electric bought the company in 1979. CPSC's testing confirmed that these breakers fail certain UL calibration tests, the checks that a breaker trips at the right current. On 3 March 1983 CPSC closed the investigation without a recall, saying its data did not establish a serious risk of injury and that gathering enough data would cost several million dollars; it made no finding that the breakers were safe.

    LessonA breaker that fails its lab tests can stay in homes for decades when no one pays to find out how often it fails in service.

    cpsc.gov

    Credit

    US Consumer Product Safety Commission

  5. 2002

    Arc-fault breakers for bedrooms

    An arc-fault circuit interrupter (AFCI) watches a circuit for the electrical pattern of dangerous arcing, such as at a damaged cord or a loose splice, and switches the circuit off. CPSC research found that by the late 1990s more than 40,000 fires a year were attributed to home electrical systems, most often in branch-circuit wiring. The 1999 NEC required AFCIs on bedroom circuits in new homes, effective in 2002. Later editions spread the rule beyond bedrooms; the 2023 NEC requires them in living rooms, dining rooms and similar rooms, as the AFCI task force of NEMA, the US electrical manufacturers' association, describes.

    iaeimagazine.org

    Credit

    CPSC; NFPA's code panels; breaker makers

  6. 2025

    Smart panels pass lab tests

    A smart panel measures each circuit and can switch loads off so that a house never draws more than its service allows. The 2023 NEC let the set point of such an energy management system count in load calculations, up to 80% of the panel's rating, by the account of Brennan Less of Lawrence Berkeley National Laboratory (LBNL). In 2024–2025 UC Davis tested three kinds in its laboratory, a full smart panel, a smart subpanel and retrofit smart breakers: all prevented sustained overloads, but the subpanel's fixed one-minute restart timer cycled loads on and off, and the smart breakers relied on settings the owner had to choose. The report concludes that smart panels "can technically defer service upgrades today", and names the barriers: little installer experience, uneven familiarity among inspectors, and high cost.

    LessonWhat protects the service is the panel's software, so installers and inspectors have to be able to read what it does.

    etcc-ca.comhomes.lbl.gov

    Credit

    UC Davis, for California's Emerging Technologies Coordinating Council (ETCC)

Watch for

  1. Meter devices instead of upgrades

    PG&E, Northern California's largest utility, said it will supply SPAN Edge, a device fitted at the electric meter that limits a home's total load, through a program called PanelBoost, starting with thousands of customers in summer 2026. PG&E estimates that more than 600,000 homes in its area are likely to need some service upgrade within a decade. The joint release puts a service upgrade at $6,000 to $40,000 and an electrician's installation of the device at $500 to $2,000.

    Achieved whenPG&E or the California Public Utilities Commission publishes how many homes enrolled, how many avoided a service upgrade, and how often the devices had to cut load.

    span.io

    Claimed by

    PG&E and SPAN, February 2026

Open

  1. 01

    Name the panel from photos

    An open, labeled set of photos of closed home panels and their door labels, sorted by maker and product line (for example Federal Pacific Stab-Lok, Zinsco, Challenger, Pushmatic, and current Square D, Siemens, Eaton and GE lines), and a model that names the maker and line from a photo and flags lines with a known history of problems. Photos are taken with the cover on, or of salvaged panels at recyclers and training schools; no cover comes off a live panel.

    The brief
    Credit · unclaimed
  2. 02

    Load calculations with answer keys

    A public set of 100 worked dwelling load calculations, the arithmetic that decides whether a home's service and panel are big enough, covering new homes, existing homes adding a heat pump or EV charger, and homes using an energy management system. Each answer is worked independently by two licensed electricians or engineers and reconciled. Then free online calculators and AI models are scored against the set.

    The brief
    Credit · unclaimed

Open 01 · the brief

Name the panel from photos

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open, labeled set of photos of closed home panels and their door labels, sorted by maker and product line (for example Federal Pacific Stab-Lok, Zinsco, Challenger, Pushmatic, and current Square D, Siemens, Eaton and GE lines), and a model that names the maker and line from a photo and flags lines with a known history of problems. Photos are taken with the cover on, or of salvaged panels at recyclers and training schools; no cover comes off a live panel.

Why it is still open

CPSC's own tests found Stab-Lok breakers failing UL calibration requirements, yet nothing was recalled, so the panels are still found in homes and are identified by reading labels. A Georgia electrician offers a free "AI Panel Check" from homeowner photos, but calls it a starting point and publishes no accuracy figures. The one panel image set this research found on Hugging Face (sriom1, March 2026) labels industrial component types such as breakers, contactors and controllers, not makers, and its image folders were empty when checked.

cpsc.govtron-elc.pages.devhuggingface.co

Built with what exists

Phone photos gathered with permission from home inspectors and from salvaged panels; an open object detector such as YOLO; an open vision-language model to read label text.

  1. First step

    Photograph 100 salvaged panels at a scrap yard or trade school, label each from its door label, and test an off-the-shelf vision-language model on them.

  2. Done looks like

    At least 1,500 photos across at least 10 maker-and-line classes, released under an open license; and on 200 photos from houses not used in training, the model names the maker correctly at least 95% of the time and misses no more than 2% of the problem lines, with the full confusion table published.

Open 02 · the brief

Load calculations with answer keys

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of 100 worked dwelling load calculations, the arithmetic that decides whether a home's service and panel are big enough, covering new homes, existing homes adding a heat pump or EV charger, and homes using an energy management system. Each answer is worked independently by two licensed electricians or engineers and reconciled. Then free online calculators and AI models are scored against the set.

Why it is still open

The NEC gives several methods for the same home, and they changed in 2023 with new rules for EV chargers, energy management systems and metered data; LBNL proposed further changes for the 2026 edition. The closest AI benchmark this research found, AECBench (Tongji University, September 2025), tests models on Chinese building codes, not NEC load calculations, and searches of arXiv, GitHub and Hugging Face found no NEC load-calculation set with answer keys.

homes.lbl.govarxiv.org

Built with what exists

Public house plans and appliance lists; a spreadsheet that shows every step of each worked answer; a scoring script run against free online calculators and several AI models through their public interfaces.

  1. First step

    Write 10 cases from public floor plans and appliance lists, have two people solve each one independently, and record where and why they disagree.

  2. Done looks like

    The 100 cases and keys released under an open license; at least five calculators and three AI models scored on the share of cases where the calculated load is within 1 ampere of the key and the service-size verdict is right; results published with every wrong answer listed.