Testing and inspection is the work of proving an installation is safe: measuring its insulation and fault paths with test instruments, having an inspector check and sign it off, and re-checking older wiring at set intervals.
5
Milestones achieved, from 1894 to 2020.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1894
A lab for electrical hazards
Fire insurers were paying for fires started by new electric wiring and appliances. William Henry Merrill had worked as an electrical inspector for the Boston Board of Fire Underwriters and at the Chicago World's Fair. In 1894 he founded the Underwriters' Electrical Bureau to test electrical products for insurers, the start of Underwriters Laboratories (UL), by the account of the International Association of Electrical Inspectors (IAEI).
Credit
William Henry Merrill; US fire insurers
1903
A tester called Megger
An insulation tester puts a high voltage across the insulation of a cable and reads its resistance in megohms (millions of ohms). A low reading warns of damaged or damp insulation before the power is turned on. Sydney Evershed of London received a US patent in December 1899 for a portable hand-cranked dynamo "well adapted for all kinds of testing work", and his firm, Evershed & Vignoles, registered Megger as a trademark for its tester in 1903. Insulation resistance is still a column in the schedule of test results on the model inspection report in BS 7671, the UK wiring regulations.
Credit
Sydney Evershed; Evershed & Vignoles
1964
Line companies survey homes
Japan's Electricity Business Act, Act No. 170 of 1964, as in force today, puts the check of wiring in homes and small shops, which it calls "electric facilities for general use", on the company whose lines supply them. Under Article 57 that company must investigate whether the wiring meets the technical standards set by the Ministry of Economy, Trade and Industry (METI) and tell the owner what must be fixed; it may entrust the surveys to registered bodies, and it is excused where the owner will not let it in.
Credit
Japan's National Diet; METI
2010
Insulation deaths force inspections
Australia's Home Insulation Program, a federal stimulus scheme, paid crews to lay insulation in roof spaces. Four young installers died. Three of them, in Queensland, were electrocuted in roof spaces between October 2009 and February 2010, two while laying metal-based foil sheeting. The government set up programs to remove foil or fit safety switches (residual current devices, which cut power when current leaks) in about 50,000 foil-insulated homes and to inspect at least 150,000 others; by 15 June 2010, 24,624 foil and 36,930 non-foil homes had been inspected, by a Senate committee's report. In 2014 Royal Commissioner Ian Hanger found that each death "would, and should, not have occurred" had the program been properly designed and implemented, and that the program "enabled very large numbers of inexperienced workers" to do potentially dangerous work.
LessonRushing untrained crews into roof spaces beside old wiring cost four lives and a national inspection program afterward.
Credit
Queensland State Coroner; Australian Senate committee; Royal Commission into the Home Insulation Program
2020
Landlords must test wiring
England's Electrical Safety Standards in the Private Rented Sector Regulations 2020 require private landlords to have the wiring of each rented home inspected and tested by a qualified person at least every 5 years, to the standards of BS 7671, and to give tenants the report within 28 days. The rules applied to new tenancies from 1 July 2020 and to existing ones from 1 April 2021. The landlord must also give the local council a copy within 7 days of a written request and have any repairs the report calls for done within 28 days. The usual report is an Electrical Installation Condition Report (EICR). A 2025 amendment extended the duty to social landlords.
Credit
UK Parliament; the UK housing ministry
Watch for
Final inspections by photo
SolarAPP+, a US permitting service for home solar, is piloting a virtual final inspection for rooftop solar and battery jobs. The crew photographs and films each item on a guided checklist, with GPS position and time locked in at capture, and the city's inspector reviews the package remotely: pass, a list of revisions, or a normal site visit. The checklist for the City of Carson, California, has 37 items for solar with storage. Rough-in, trenching and fire inspections still happen in person.
Achieved whenA participating city or an outside reviewer publishes pass and revision rates and re-inspects a sample in person to show what the photos missed.
Claimed by
SolarAPP+, August to October 2026
Open
01
Audit published inspection reports
A program that reads finished EICRs as PDF files and checks each one for errors on the page, with no site visit. Examples: an overall verdict of "satisfactory" when a C1 (danger present) or C2 (potentially dangerous) code is recorded; a measured earth fault loop impedance above the maximum for the breaker listed (this impedance is the resistance of the path a fault current takes, and if it is too high the breaker trips too slowly); blank residual current device trip times; missing test instrument serial numbers; dates that do not agree. Inspectors' names are removed before anything is published.
The briefCredit · unclaimed02
Score inspectors' fault codes
A public set of written defect descriptions, each with a photo of an unpowered mock-up where one helps, coded independently by several qualified inspectors with the codes an EICR uses: C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended) or FI (further investigation). Publish how often the inspectors agree, then score AI models against the majority code.
The briefCredit · unclaimed
Open 01 · the brief
Audit published inspection reports
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A program that reads finished EICRs as PDF files and checks each one for errors on the page, with no site visit. Examples: an overall verdict of "satisfactory" when a C1 (danger present) or C2 (potentially dangerous) code is recorded; a measured earth fault loop impedance above the maximum for the breaker listed (this impedance is the resistance of the path a fault current takes, and if it is too high the breaker trips too slowly); blank residual current device trip times; missing test instrument serial numbers; dates that do not agree. Inspectors' names are removed before anything is published.
Why it is still open
England now requires a report on every rented home at least every 5 years, but a report is only as good as its author. Property118, a landlord news site, reported in 2023 that firms offered inspections for as little as £80 against up to £500 for a proper one, and that one- or two-week courses were sold as qualification to do them. This research found no tool or study that audits finished EICRs; reports are read by people, if at all.
Built with what exists
EICRs that owners have published, such as the 41-page report Barking and Dagenham council posted for one of its blocks of flats; pdftotext; a language model to lift the schedule of test results into a table (see the Note "Seven more flagged"); breaker makers' published maximum impedance values.
First step
Download ten published EICRs and copy their schedules of test results into a spreadsheet by hand, to settle the fields and the checks.
Done looks like
200 published EICRs parsed and every inconsistency listed, then a qualified inspector reviews 50 flagged and 50 unflagged reports, and the share of correct flags and missed errors is published.
Open 02 · the brief
Score inspectors' fault codes
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of written defect descriptions, each with a photo of an unpowered mock-up where one helps, coded independently by several qualified inspectors with the codes an EICR uses: C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended) or FI (further investigation). Publish how often the inspectors agree, then score AI models against the majority code.
Why it is still open
The UK contractors' association, the ECA, tells its members that "EICR codes can vary depending on the situation", that "the inspector is key", and that "it is almost impossible to offer concise guidance on what code would be applicable". It points to Electrical Safety First's Best Practice Guide 4 for examples, but says that guide "cannot cover every potential defect". This research found no study that measures how often inspectors give the same code to the same defect, and no test of AI tools on coding.
Built with what exists
Electrical Safety First's Best Practice Guide 4 as a starting list of defects; an online form; volunteer qualified inspectors; Python to compute Fleiss' kappa, a standard measure of how far several raters agree beyond chance; AI models through their public interfaces, each run several times, since a model can give a different code on each run (see the Note "All twenty times").
First step
Write 30 defect descriptions with one inspector, send them to five others, and compute how often they agree.
Done looks like
300 defects, each coded by at least five inspectors, published under an open license with the agreement for each code; at least three AI models scored against the majority code, with the share of C1 and C2 defects each model rated C3 or lower.