Substations

Substations are fenced yards or buildings where transformers raise or lower the voltage and switchgear (breakers and switches) connects lines, protects them from faults and cuts them off for repair.

7

Milestones achieved, from 1885 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

In depth

The same ground is charted in more depth, as an industry of its own.

The road

AchievedWatch forOpen

Achieved

  1. 1885

    The closed-core transformer

    A transformer changes AC power from one voltage to another. Between January and March 1885, three engineers at the Ganz Works in Budapest filed patents on transformers with a closed iron core, connected in parallel, with freely chosen voltage ratios. Péter Asztalos's 1986 history in Periodica Polytechnica says they were also the first to use the word "transformer".

    pp.bme.hu

    Credit

    K. Zipernowsky, M. Déri and O. T. Bláthy (Ganz Works)

  2. 1965

    Switchgear sealed in gas

    Gas-insulated switchgear (GIS) puts breakers and conductors inside sealed metal tubes filled with sulfur hexafluoride (SF6), a gas that insulates far better than air, so the equipment takes much less space. ABB says its parent company BBC introduced the first high-voltage GIS in 1965, and that substations underground in cities, inside dams or in shipping containers depend on it.

    library.e.abb.com

    Credit

    BBC, one of ABB's parent companies, per ABB

  3. 1975

    Surge arresters without gaps

    A surge arrester shields equipment from voltage spikes caused by lightning and switching. Meidensha built an arrester from zinc-oxide parts, with no spark gaps, under Panasonic's patent, and first supplied it to the 66 kV Hayato substation in Kyushu, Japan. IEEE says it became the standard design and made compact arresters for GIS possible.

    ethw.org

    Credit

    Meidensha Corporation; Panasonic. _for_electric_power_systems,1975)

  4. 2003

    A shared network language

    The IEC (International Electrotechnical Commission) published the first parts of IEC 61850, "Communication networks and systems in substations," in April 2003, and added part 9-2, which sends measurements over Ethernet, in April 2004. The standard lets relays, meters and controls from different makers exchange data over one network, which an ABB publication calls "the big breakthrough for digital substations."

    webstore.iec.chwebstore.iec.chlibrary.e.abb.com

    Credit

    the IEC

  5. 2013

    Rifle attack at Metcalf

    In 2013 an unknown attacker with a rifle disabled a critical 500 kV substation at Metcalf, California; the Congressional Research Service calls it a turning point for the US power sector. On 20 November 2014 FERC, the US federal energy regulator, approved standard CIP-014-1, which requires owners to identify their most critical substations, have the list checked by a third party, and carry out a security plan.

    Lessonuntil then, FERC said, US reliability rules did not specifically require protection against physical attack.

    congress.govferc.gov

    Credit

    FERC; NERC, the body that writes North American grid reliability rules

  6. 2022

    Moore County shows a gap

    On 3 December 2022 attacks damaged neighboring substations in Moore County, North Carolina, and customers lost power. NERC's April 2023 review for FERC found the CIP-014 rule would not have covered them, because it protects only sites whose loss could destabilize the wider grid. NERC also reported, from its security information center's data, that physical attacks causing outages rose 71% from 2021 to 2022.

    Lessona rule written to prevent grid-wide collapse can leave local blackouts unprotected.

    nerc.com

    Credit

    NERC (review); FERC (order)

  7. 2025

    A warning in the oil

    On 20 March 2025 a transformer bushing (the insulated passage that carries a conductor through the tank) failed and caught fire at National Grid's 275 kV North Hyde substation in west London. 71,655 customers lost power and Heathrow Airport closed for most of the next day. The system operator NESO's review found that oil samples taken in July 2018 had shown high moisture, and that action matching the severity of that reading was never taken.

    Lessona test result that no one acts on protects nothing.

    neso.energy

    Credit

    National Energy System Operator (review)

Watch for

  1. SF6-free switchgear at top voltages

    SF6 traps heat 24,300 times more strongly than CO2, by Hitachi Energy's figure, so makers are replacing it. Hitachi Energy says its 550 kV GIS, filled with a mix of CO2, oxygen and a fluorinated gas, was connected to the grid at the Yuxian substation in Wuhan, China, on 29 May 2026. In June 2026 it and TenneT finished on-site tests in Germany of what they call the world's first SF6-free 420 kV GIS.

    Achieved whenoperators or an independent party publish years of service records showing the gear performs as well as SF6 equipment.

    hitachienergy.comhitachienergy.com

    Claimed by

    Hitachi Energy, with TenneT Germany, June and July 2026

Open

  1. 01

    AI-written substation configurations

    A tool that writes the configuration file for a digital substation's control system from a plain description of the substation, and a public test of the files it writes. The file, in IEC 61850's System Configuration Language (SCL), tells each relay and controller what data to send and receive; engineers now build it by hand in vendor tools.

    The brief
    Credit · unclaimed
  2. 02

    A public transformer supply record

    A monthly public record of large power transformer supply: US imports by month, country and number of units from government trade data, plus delivery times and prices quoted in public utility filings, each with its source.

    The brief
    Credit · unclaimed

Open 01 · the brief

AI-written substation configurations

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A tool that writes the configuration file for a digital substation's control system from a plain description of the substation, and a public test of the files it writes. The file, in IEC 61850's System Configuration Language (SCL), tells each relay and controller what data to send and receive; engineers now build it by hand in vendor tools.

Why it is still open

A 2026 CIGRE paper by Alexander Apostolov of OMICRON assesses AI code-generation models for creating and checking SCL files but reports no tests of them.

e-cigre.org

Built with what exists

Current language models; OpenSCD, an open-source SCL editor now maintained by LF Energy's CoMPAS project; the open-source Auto-SGCR toolchain, whose example substation models include SCL files and which turns them into a working test network; one protection engineer to review results.

github.comarxiv.org

  1. First step

    Take one Auto-SGCR example model, write a plain description of it, and compare what a language model produces with the original file.

  2. Done looks like

    For 20 substation descriptions with hand-built reference files, the tool's files open in OpenSCD without errors and match the reference on at least 95% of the data links between devices, with descriptions, files and scores published.

Open 02 · the brief

A public transformer supply record

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A monthly public record of large power transformer supply: US imports by month, country and number of units from government trade data, plus delivery times and prices quoted in public utility filings, each with its source.

Why it is still open

The most quoted figures, a 30% US shortfall of power transformers in 2025 with 80% of supply imported, are Wood Mackenzie's estimates from its own report, and its press release does not publish the data behind them.

woodmac.com

Built with what exists

The Census Bureau's international trade API, which gives monthly imports by trade code and needs an API key; the US tariff code for oil-filled transformers above 10,000 kVA (HTS 8504.23), whose subheadings record the number of units; a language model that finds delivery times in utility rate filings and cites the page (see the Note "Findings that cite notes").

census.govhts.usitc.gov

  1. First step

    Pull 2019 to 2025 imports for HTS 8504.23 and set the trend beside Wood Mackenzie's published figures.

  2. Done looks like

    Monthly import counts and values since 2015 for each HTS 8504.23 subheading, and at least 100 delivery-time quotes from public filings since 2022, each linked, updated monthly for six months.