Industries / Energy, water and waste / Electric transmission and distribution
Transmission lines
Transmission is building and running the high-voltage lines, on towers or as buried and undersea cables, that carry power long distances from power plants to cities.
6
Milestones achieved, from 1891 to 2019.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1891
Three-phase AC goes far
For an electrical exhibition in Frankfurt, a line carried three-phase alternating current 175 km from Lauffen am Neckar at 15 kV. IEEE gives the power as 300 horsepower and the efficiency as over 75%, calls it the first long-distance, high-voltage transmission of three-phase AC, and says it helped make three-phase AC the world's main way to move power.
Credit
Oskar von Miller; Michael Dolivo-Dobrowolsky (AEG); Charles E. L. Brown (Maschinenfabrik Oerlikon)
1952
Sweden's 400 kV line
Vattenfall connected a line of about 1,000 km from the Harsprånget hydro plant in northern Sweden to Hallsberg, designed for 380 kV and run at 400 kV. Vattenfall, the line's owner, calls it the world's first 400 kV line and says it chose AC because demand grew faster than forecast, leaving no time to develop direct current.
Credit
Vattenfall
1954
Direct current under the sea
The Gotland link carried 20 MW at 100 kV through a 96 km undersea cable to the Swedish island of Gotland. IEEE calls it the world's first commercial HVDC (high-voltage direct current) link. Its key part was the mercury-arc valve, which converts AC to DC and back, and IEEE says the link became the testbed for later links such as the one under the English Channel.
Credit
an ASEA and Vattenfall team led by Uno Lamm
1965
Hydro-Québec's 735 kV line
On 29 November 1965 Hydro-Québec opened the first 735 kV line, part of about 600 km of line from the Manicouagan-Outardes dams to Montreal. IEEE says it was the first system in the world designed, built and run at an AC voltage above 700 kV.
Credit
Hydro-Québec; engineer Jean-Jacques Archambault
1972
Solid-state switches for HVDC
A converter station turns AC into DC, or back again, at each end of a DC line. The 320 MW Eel River station in New Brunswick, Canada, used thyristors (solid-state switches) instead of mercury-arc valves, and IEEE calls it the world's first commercial solid-state HVDC converter station.
Credit
Canadian General Electric and NB Power
2019
A 1,100 kV DC line
State Grid Corporation of China put into service a ±1,100 kV DC line about 3,300 km long, from Xinjiang in the west to Anhui in the east, which State Grid says can carry up to 12 GW. (± means one conductor at plus 1,100 kV and one at minus 1,100 kV.) IEEE Spectrum reported that it set world records for voltage, distance and power.
Credit
State Grid Corporation of China
Watch for
Flexible DC at 800 kV
State Grid is building a ±800 kV line about 2,370 km long from Gansu to Zhejiang, with voltage-source converters, a newer kind of converter, at both ends. Hitachi Energy, a supplier, calls it the world's first ultra-high-voltage flexible DC line. The 8,000 MW receiving station's AC side joined Zhejiang's grid on 27 May 2026, and China Daily gives April 2027 for full operation.
Achieved whenthe whole line runs at rated power and someone outside the builders reports it.
Claimed by
Hitachi Energy, June 2025; status reported by China Daily, May 2026
Superconducting cable for Munich
A superconducting cable is chilled until its conductor has almost no electrical resistance, so a slim cable can carry a large amount of power. The SuperLink team ran a 150 m demonstration cable rated 110 kV and 500 MVA for six months in Munich and reports low losses and little heat leaking into the cooled pipe.
Achieved whena full-length cable carries city load in regular service and an outside party reports how it performs.
Claimed by
the SuperLink team (D. Willén and co-authors), IEEE Transactions on Applied Superconductivity, April 2026
Open
01
An open cable failure record
A public table of failures on high-voltage underground and undersea cables, one row per event, with the date, the cable, the cause where one was reported, the days out of service, and links to the notices and reports it came from.
The briefCredit · unclaimed02
A public US line map
An open map of US high-voltage transmission lines that stays current: the last federal public map, checked line by line against OpenStreetMap, with lines built since mid-2025 added and each change linked to its source.
The briefCredit · unclaimed
Open 01 · the brief
An open cable failure record
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of failures on high-voltage underground and undersea cables, one row per event, with the date, the cable, the cause where one was reported, the days out of service, and links to the notices and reports it came from.
Why it is still open
CIGRE, the international council of grid engineers, runs the main survey of cable failures under confidentiality rules, never names cable owners, and publishes only aggregate rates. A 31-company research project led by DNV, Deltares and TNO analyzed 135 undersea cable failures, and its conference paper reports them as percentages, not as a list of events.
Built with what exists
Outage notices that EU grid operators must publish within an hour, with the reason, when an outage cuts cross-border capacity by 100 MW or more, or an offshore grid outage cuts wind output by 100 MW or more; operators' press releases and regulators' reports; a language model that drafts each row and cites the sentence it came from (see the Note "Findings that cite notes"); two human checkers.
First step
List Europe's HVDC interconnectors and collect one year of their forced-outage notices.
Done looks like
Every forced outage longer than seven days on a European HVDC interconnector since 2015, each with a cause or "not reported," a repair time and a source link, with a second checker agreeing on at least 90% of cause codes, published under an open license.
Open 02 · the brief
A public US line map
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open map of US high-voltage transmission lines that stays current: the last federal public map, checked line by line against OpenStreetMap, with lines built since mid-2025 added and each change linked to its source.
Why it is still open
The US Department of Homeland Security stopped updating its public HIFLD Open portal, which included a map of transmission lines, on 26 June 2025 and discontinued it on 26 August 2025; much of its data moved to a site open only to vetted partners. Volunteers saved the lines layer, covering lines from 69 kV to 765 kV, as a copy made on the day the portal closed.
projectgeospatial.squarespace.comportal.datarescueproject.org
Built with what exists
The archived layer; OpenStreetMap's power line data; GeoPandas for matching shapes; grid operators' and utilities' public project lists for new lines; satellite images for spot checks.
First step
Download the archived layer and match its 500 kV lines in one state against OpenStreetMap.
Done looks like
Every archived line at 345 kV and above matched to an OpenStreetMap line or flagged as missing, with the match rate published, and every 345 kV or larger line energized since June 2025 added with a source link, updated monthly for six months.