Installing is the work of turning a robot bought from a maker into a working cell in a customer's plant: choosing the robot, designing the grippers, fixtures and guarding around it, programming it, and starting it up on the line, usually done by a firm called a system integrator.
5
Milestones achieved, from 2012 to 2026.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2012
Integrators get audited
The Robotic Industries Association (RIA), the North American robot trade group now part of the Association for Advancing Automation (A3), named its first four Certified Robot Integrators in May 2012: JR Automation, Motion Controls Robotics, Tennessee Rand and Wolf Robotics. To qualify, an integrator passes an on-site audit by a third party, safety training and hands-on tests of key staff, scored on 25 criteria that include risk assessments and the number of past installations, and must be recertified every two years. RIA's president, Jeff Burnstein, added that "RIA cannot guarantee the work of any integrator."
Credit
Robotic Industries Association
2016
A cell costs several robots
A report for the US National Institute of Standards and Technology (NIST), written by RTI International from interviews with 84 industry experts, found that the total cost of a robot system, the robot plus its integration, "tends to be 3 to 4 times the initial costs of each robot," a ratio it said was changing. One expert told the authors that "integrators consider every project as a new project" and that there is "no standardized approach to integration."
LessonThe robot arm is the smaller part of the bill; the custom work around it is what makes robots expensive for a first-time buyer.
Credit
Albert Link, Zachary Oliver and Alan O'Connor (RTI International), for NIST
2020
Few firms use robots
The US Census Bureau's 2018 Annual Business Survey asked more than 850,000 firms which advanced technologies they used. Only 1.3% of firms used robots and 0.3% were testing them, and use was concentrated in large manufacturers, so the share of workers at firms with robots was about eight times the share of firms.
LessonRobots reached big plants first; for most small firms installing one is still a first.
Credit
Nikolas Zolas, Erik Brynjolfsson, Kristina McElheran and co-authors (US Census Bureau and others)
2022
Robots rented by the hour
Formic, a US company, buys standard robot arms and leases them with its own software, charging for the hours the robot works. In January 2022 Wired reported that the production manager at Polar, a Formic customer, said its leased arm loading a metal press cost the equivalent of $8 an hour, against a $15 minimum wage, and that not paying $100,000 upfront to buy and program a robot was crucial. This model is called robots as a service.
Credit
Formic Technologies (Saman Farid, chief executive); customer report via Wired
2026
China's robot density recounted
Robot density is the number of working industrial robots per 10,000 manufacturing employees. In November 2024 the International Federation of Robotics (IFR), the industry's international association, which publishes its yearly statistics, put China third in the world at 470 for 2023, ahead of Germany and Japan. In November 2026, using employee counts from China's National Economic Census, it put China at 193 for 2025, 19th in the world, and the global average at 152 against 162 two years earlier.
LessonA density figure depends as much on the count of workers as on the count of robots.
Credit
International Federation of Robotics
Watch for
655,000 robots in 2026
The IFR forecasts that installations of industrial robots worldwide will rise 9% to 655,000 units in 2026 and reach 806,000 in 2029, and says easier programming and system integration are lowering deployment costs.
Achieved whenThe IFR's World Robotics 2027 report counts 2026 installations at or above 655,000.
Claimed by
International Federation of Robotics, September 2026
Rented robots at 99.3% uptime
Formic's website shows a live count of 99.30% uptime over the last 12 months across its customers' robots and 893 worker injuries prevented this year, with no method given; its press page lists a $50 million funding round in October 2026.
Achieved whenA customer or an outside auditor publishes uptime for a stated set of Formic cells, with how downtime was counted.
Claimed by
Formic Technologies, November 2026
Open
01
Real prices for robot cells
An open table of what public buyers have paid for robot cells, built from European Union contract award notices, which state the contract value and often list what was bought. Each row gives the country, year, buyer type (factory, university, hospital, training centre), number of robots, what came with them (grippers, guarding, vision, training) and, where the documents allow, the robot's price separately from the rest.
The briefCredit · unclaimed02
Payback, measured not claimed
A public collection of finished robot installations whose before-and-after figures were published by someone other than the seller, such as government manufacturing programs and universities, with each payback recalculated by one written method: installed cost divided by net yearly saving, with every cost and saving counted once.
The briefCredit · unclaimed
Open 01 · the brief
Real prices for robot cells
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open table of what public buyers have paid for robot cells, built from European Union contract award notices, which state the contract value and often list what was bought. Each row gives the country, year, buyer type (factory, university, hospital, training centre), number of robots, what came with them (grippers, guarding, vision, training) and, where the documents allow, the robot's price separately from the rest.
Why it is still open
The best-known figure, NIST's three to four times the robot price, comes from interviews in 2016, and a November 2026 review of cost and payback sources by the trade site ReliaMag found published breakdowns only from consultants, vendors and case studies, not from measured data.
Built with what exists
The TED search API of the EU's public procurement journal, which on 18 November 2026 returned 2,747 notices under the product code 42997300, "Industrial robots"; an AI model that reads tender documents, such as Claude Fable 5.2 (see the Note "Three working devices"), with a second model that flags doubtful readings for a person to check (see the Note "Seven more flagged"); Python and a spreadsheet.
First step
Download the 2,747 notices' metadata through the API, keep the contract award notices that state a value, and hand-code the first 30.
Done looks like
300 award notices coded, each row linked to its notice, with published figures for the median and spread of total contract value per robot by buyer type and application, and the ratio of total value to robot price wherever the robot is priced separately.
Open 02 · the brief
Payback, measured not claimed
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public collection of finished robot installations whose before-and-after figures were published by someone other than the seller, such as government manufacturing programs and universities, with each payback recalculated by one written method: installed cost divided by net yearly saving, with every cost and saving counted once.
Why it is still open
ReliaMag's November 2026 review found no measured, representative payback period from any government agency, statistics office or robotics association. Universal Robots has published averages of "six to eight months" and "195 days" without a sample or method, and a widely repeated fall from 5.3 years to 1.3 years credited to McKinsey could not be traced to McKinsey.
Built with what exists
Public case-study libraries from programs such as the US Manufacturing Extension Partnership and the UK's Made Smarter; the US Bureau of Labor Statistics' employer cost per hour worked for labour rates; a spreadsheet; an AI model to extract figures from case-study PDFs, checked by a person.
First step
Write the one-page payback method and apply it to the first 10 case studies found.
Done looks like
50 installations with installed cost, hours of labour avoided, running cost and recalculated payback, published with the median, the spread, and the share that falls inside the sellers' advertised averages.