BRENNEN

Industries / Mining and materials / Chemicals and petrochemicals / Refining

Planned shutdowns

A planned shutdown, called a turnaround, stops a refinery unit for weeks so that equipment that cannot be reached while it runs can be inspected, cleaned, repaired and given fresh catalyst.

6

Milestones achieved, from 1997 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1997

    Japan ends yearly shutdowns

    Japanese refineries had to stop their units every year for a safety inspection under the country's high-pressure gas law. In 1997 the law was renamed the High Pressure Gas Safety Act, and operators certified as having a high level of safety could inspect themselves and run for up to four years between these shutdowns. ENEOS writes that each shutdown takes about a month, and that 86 sites held this certification in April 2019.

    eneos.co.jp

    Credit

    the Japanese government; ENEOS (then JXTG) describes the change

  2. 2015

    A valve past its life

    On 18 February 2015 an electrostatic precipitator exploded at ExxonMobil's Torrance refinery in California. The precipitator removes catalyst dust with charged plates that spark in normal use. The fluid catalytic cracking (FCC) unit, which breaks heavy oil into gasoline with a hot catalyst powder, was idling in a standby mode while workers prepared a repair. A safety-critical slide valve, expected to last a run of four to five years between turnarounds, had been in service since January 2009, because the next turnaround was set for June 2015; it had eroded and let hydrocarbons flow back to the precipitator. ExxonMobil had not assessed the risk of the longer run. Debris landed on scaffolding around tanks holding HF in the alkylation unit, and the refinery made about 20% of southern California's gasoline.

    LessonStretching the time between turnarounds also stretches the life asked of every part that is only serviced during one.

    csb.govcsb.gov

    Credit

    CSB investigation, report May 2017

  3. 2015

    No exemption for startups

    The US EPA's December 2015 rule for the 142 refineries under its hazardous air pollutant standards removed the exemption that had excused emissions during startup, shutdown and malfunction, so that the standards apply at all times. It added work practices for flares, the tall stacks that burn off gas during upsets and shutdowns, including a flare management plan and a root cause analysis after large flaring events. It set the first standards for venting while decoking a delayed coker, the step that cuts solid coke out of the drums, and required benzene monitors around each refinery's fence line within two years, reported every quarter.

    govinfo.gov

    Credit

    US EPA, following the 2008 court ruling in Sierra Club v. EPA

  4. 2017

    Eight years between shutdowns

    On 1 April 2017 Japan's Ministry of Economy, Trade and Industry (METI) began a "super certification" for operators that use advanced risk assessment, new technology and outside reviews. Such operators may set their own run of up to eight years between shutdown inspections, against four years under ordinary certification. JXTG's Kawasaki refinery received the first on 20 December 2017 and its Sakai refinery the second on 23 February 2018.

    LessonLonger runs mean operators see fewer turnarounds, so the Kawasaki and Sakai refineries train operators on an idle plant that imitates turnaround work.

    meti.go.jpeneos.co.jp

    Credit

    METI; JXTG Nippon Oil & Energy, now ENEOS

  5. 2018

    Explosion during a shutdown

    On 26 April 2018 Husky Energy's refinery in Superior, Wisconsin, was shutting down its FCC unit for a five-week turnaround, with 800 to 900 people on site. Air passed an eroded slide valve into equipment that held hydrocarbons, and two vessels exploded, throwing more than 100 metal fragments up to 1,200 feet (370 m). Debris punctured an asphalt tank, and about 17,000 barrels of hot asphalt burned. The CSB counts 36 workers who sought medical attention and about US$550 million in property damage. The city evacuated 2,507 residents, partly because the refinery's HF storage tank stood closer to the explosion than the asphalt tank that was hit. The refinery's shutdown procedure kept pressures the opposite way from what the unit's licensor had advised since 1960.

    LessonA shutdown is its own mode of operation, with hazards that normal running does not have.

    csb.govcsb.gov

    Credit

    CSB investigation, report December 2022

  6. 2024

    Turnarounds reported to the state

    In May 2024 the California Energy Commission (CEC) adopted emergency rules requiring more reporting of refinery maintenance, and published guidelines for reporting each planned and unplanned outage, with a second edition in August 2025. A law signed in October 2024, AB X2-1, lets the commission require refiners to plan for resupply during planned maintenance and to hold minimum fuel stocks, to avoid shortages that raise gasoline prices.

    energy.ca.gov

    Credit

    the CEC and the California Legislature

Watch for

  1. California's resupply rule

    The CEC says it may require refiners to plan replacement supply for each planned maintenance outage. It held a resupply rulemaking workshop on 9 November 2026 and expects to adopt an assessment of the effects of refinery maintenance and turnarounds in December 2026. No rule has been adopted.

    Achieved whenthe CEC adopts a resupply rule and a later turnaround season shows, in published price and supply data, smaller price rises during planned outages.

    energy.ca.gov

    Claimed by

    California Energy Commission, November 2026

  2. Thermal satellites watch units

    Meduza analyzed images from Constellr's thermal satellites, which see the ground in 30 m squares, to judge which units at two Russian refineries were running or shut after drone strikes. It says such images can show this for any refinery, but can mislead without other sources.

    Achieved whensomeone other than the data seller scores the method against shutdown dates that refiners or regulators reported, and publishes the hit rate.

    meduza.io

    Claimed by

    Meduza, with Constellr data, August 2026

Open

  1. 01

    An open FCC shutdown model

    A free, open dynamic model of an FCC unit's reactor, regenerator and gas recovery section that runs through shutdown, standby and startup and shows when air and hydrocarbons can meet. It would replay the sequences the CSB published for Torrance in 2015 and Superior in 2018, for training and study, not to run a plant.

    The brief
    Credit · unclaimed
  2. 02

    Score satellite outage spotting

    An open method that uses free satellite images to tell when a refinery unit is shut down, and a public score of how often it is right, checked against shutdowns that refineries reported.

    The brief
    Credit · unclaimed

Open 01 · the brief

An open FCC shutdown model

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A free, open dynamic model of an FCC unit's reactor, regenerator and gas recovery section that runs through shutdown, standby and startup and shows when air and hydrocarbons can meet. It would replay the sequences the CSB published for Torrance in 2015 and Superior in 2018, for training and study, not to run a plant.

Why it is still open

The CSB found that most safeguards in an FCC shutdown depend on operators following procedures, and that simulators and drills are crucial for such work. A February 2024 article in PTQ notes that FCC models are usually held by the licensor or catalyst vendor, and that the FCC model in the commercial HYSYS simulator is steady-state, while a dynamic model is needed to find how much time a shutdown allows. An open dynamic model of an FCC unit and its main fractionator was published in 2022 by Santander, Kuppuraj, Harrison and Baldea, and a 2026 dataset built on it covers normal running and five faults, not shutdown or standby.

csb.govdigitalrefining.comgithub.comgithub.com

Built with what exists

The 2022 open model (MATLAB, MIT license) as a base, extended in MATLAB or ported to Python with SciPy; the timelines, pressures and valve positions in the CSB's Torrance and Superior reports; published FCC reaction models; a coding agent that tests its own work (see the Note "Checked without being asked").

  1. First step

    Turn every time, pressure, flow and valve position in the Superior report into one timeline table.

  2. Done looks like

    The model reproduces the CSB's finding that if about 0.2% of the air entering the Superior regenerator reached the gas recovery section over four hours, the vessels there could become explosive, and replays the Torrance sequence in the same order of events. It is published under an open license, with a list of errors found by two FCC engineers.

Open 02 · the brief

Score satellite outage spotting

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open method that uses free satellite images to tell when a refinery unit is shut down, and a public score of how often it is right, checked against shutdowns that refineries reported.

Why it is still open

Kayrros and other firms sell refinery outage detection, and Meduza used commercial thermal images in 2026. Meduza notes that NASA's free FIRMS fire data uses pixels of about 400 m, too coarse to see single units. None of these publishes an accuracy figure against reported outages.

kayrros.commeduza.io

Built with what exists

Free Landsat 8 and 9 thermal images and Sentinel-2 short-wave infrared images, through Google Earth Engine or Microsoft Planetary Computer; the before-and-after comparison Meduza describes; shutdown dates from Texas emission event reports, CSB reports and company statements.

  1. First step

    Take one refinery whose turnaround date is on record, such as Superior in April 2018, and look for a cooling signal in Landsat thermal images before and after.

  2. Done looks like

    For 20 refineries over two years, every detected shutdown matched against reported ones, with the share of reported shutdowns found and the share of detections that were real both published, along with the code.