BRENNEN

Industries / Transport and vehicles / Rail

Yards and scheduling

Freight cars travel in groups called blocks, which are sorted in classification yards, often by pushing cars over a small hill, the hump, so that each rolls into its own track; scheduling decides which cars ride which trains and when.

4

Milestones achieved, from 1925 to 2022.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1925

    Retarders replace car riders

    At a hump yard, men once rode each rolling car and braked it by hand. The Indiana Harbor Belt Railroad's yard at Gibson, Indiana, installed car retarders, powered brakes beside the rail worked from a tower, which the trade journal Railway Signaling called in July 1925 "the first practical and successful application" of the idea. It said the night car rider's job had been "the most hazardous", and that accidents of that kind were "practically eliminated".

    jonroma.net

    Credit

    the Indiana Harbor Belt Railroad, under patents held by George Hannauer and E. M. Wilcox

  2. 1967

    Bar codes on cars fail

    In the late 1960s the AAR required owners to fit KarTrak, colored labels that trackside scanners read optically, to every freight car. The industry spent $150 million on it between 1967 and 1977, by the St. Louis Post-Dispatch's count, but dirt and aging labels cut accuracy and the system was abandoned in the late 1970s.

    LessonA label read outdoors must survive dirt and weather, or the whole system fails.

    vice.comaeitag.com

    Credit

    David J. Collins and Sylvania; the AAR

  3. 1991

    Radio tags on every car

    In 1988 Burlington Northern tested radio tags on 1,500 iron ore cars and reported accuracy above 99.99% over six months. The AAR made its automatic equipment identification (AEI) standard mandatory in 1991, and reported that over 95% of the North American car fleet was tagged by 31 December 1994.

    aeitag.com

    Credit

    Burlington Northern; Amtech, the tag maker; the AAR

  4. 2022

    Thin crews, slow freight

    Precision scheduled railroading (PSR) runs cars to a fixed plan with fewer trains, locomotives and staff. The Surface Transportation Board (STB), the US freight rail regulator, held hearings on 26 and 27 April 2022 after complaints of "inconsistent and unreliable" service, and its chairman said the large railroads had cut their workforce by 29%, about 45,000 people, in six years. The board ordered recovery plans on 6 May 2022; BNSF blamed a volume surge it could not quickly match with crews and locomotives.

    LessonEquipment and staff cut to the minimum left no room to absorb a surge in traffic.

    progressiverailroading.comprogressiverailroading.com

    Credit

    the STB

Watch for

  1. Digital couplers in Europe

    European freight wagons are still joined by hand with screw couplers, which means climbing between wagons. A digital automatic coupler (DAC) joins the wagons, their brake air lines and a data line in one move. ÖBB, Austria's railway, demonstrated it under operating conditions at Vienna's Floridsdorf yard on 11 September 2026, ahead of commercial "pioneer" trains planned for 2027 and 2028.

    Achieved whenDAC-fitted wagons run in commercial service and an outside body, such as Europe's Rail Joint Undertaking or a national regulator, publishes measured results.

    railway.supplyglobalrailwayreview.com

    Claimed by

    ÖBB Rail Cargo Group, September 2026

  2. Self-driving container cars

    Parallel Systems builds battery-electric rail cars that each carry one container and drive themselves alone or in groups of up to 50, at up to 25 mph. The FRA granted 22 waivers with 23 conditions for a seven-phase test on two Genesee & Wyoming short lines in Georgia; the first phase, on 2 miles of track cut off from the rest of the railroad, ended in 2025, and the second, on 30 miles, began that September.

    Achieved whenThe FRA approves operation beyond the test phases and an outside party reports performance.

    freightwaves.comprogressiverailroading.com

    Claimed by

    Parallel Systems and Genesee & Wyoming, September 2025

Open

  1. 01

    Robot joins two air hoses

    Each freight car carries a brake hose ending in a glad hand, a metal coupling that locks to the next car's glad hand so air can reach every brake. Build a bench rig with two real glad hands on hoses hung as they hang between cars, and have a robot arm pick up both ends and lock them together. Leak-test at low air pressure only.

    The brief
    Credit · unclaimed
  2. 02

    Warning before service breaks

    An open model that reads the STB's weekly service reports for each large railroad (train speed, terminal dwell, which is the hours a car spends in a yard, cars online and trains held) and warns weeks ahead when service is heading for a breakdown like that of 2022. Back-test it on the full weekly record and publish the results.

    The brief
    Credit · unclaimed

Open 01 · the brief

Robot joins two air hoses

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

Each freight car carries a brake hose ending in a glad hand, a metal coupling that locks to the next car's glad hand so air can reach every brake. Build a bench rig with two real glad hands on hoses hung as they hang between cars, and have a robot arm pick up both ends and lock them together. Leak-test at low air pressure only.

Why it is still open

A 2023 patent filing by Trackmobile, which makes machines that move rail cars, says air hose coupling is "performed manually" by an operator who must "work between the rail car and the railcar mover". Its patents cover a device on its own machines; this research found no robot that joins the hoses of two cars. Europe's alternative, the DAC, is still in trials.

patents.google.com

Built with what exists

Two glad hands with hoses from a rail parts supplier; a shop compressor regulated well below working brake pressure, and a pressure gauge; a collaborative arm such as a Universal Robots UR5e, or for a first try an SO-101 arm with LeRobot on a lighter 3D-printed copy (see the Note "No download"); a robot model that learns from a few demonstrations (see the Notes "Five demonstrations per task" and "Open robot model weights").

  1. First step

    Buy two glad hands and hoses, hang them from a frame at car height, and film a person coupling them five times.

  2. Done looks like

    Twenty filmed, uncut attempts from three different starting hose positions, with a public table recording whether the glad hands locked (pull test), whether the seal held (pressure drop under a set limit over five minutes), the seconds taken and any human touches, plus a person doing the job five times.

Open 02 · the brief

Warning before service breaks

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open model that reads the STB's weekly service reports for each large railroad (train speed, terminal dwell, which is the hours a car spends in a yard, cars online and trains held) and warns weeks ahead when service is heading for a breakdown like that of 2022. Back-test it on the full weekly record and publish the results.

Why it is still open

The STB publishes these weekly reports, with a combined spreadsheet, but in 2022 the board learned of the breakdown largely from users: it said it had "heard informally from a range of stakeholders about inconsistent and unreliable rail service" over the past year. This research found no published forecasting model built on the weekly data.

stb.govprogressiverailroading.com

Built with what exists

The STB's combined weekly spreadsheet; Python with simple forecasting methods as a baseline; a web agent to gather the individual railroad filings (see the Note "Deleting 80% to start over"); optionally a model that gives probabilities for fixed-answer questions (see the Note "A thousand questions, one pass").

  1. First step

    Download the combined spreadsheet, write the breakdown definition, and plot terminal dwell for each railroad through 2021 and 2022.

  2. Done looks like

    A definition of breakdown written before testing (for example, system dwell 20% above its prior-year average for four weeks running), and a public back-test across all large railroads giving, for each breakdown, the weeks of warning and the false alarms per year, with code public.