BRENNEN

Industries / Transport and vehicles / Rail

Passenger service

This is the work of carrying people: timetables, high-speed and city lines, and the information passengers get when things go wrong.

5

Milestones achieved, from 1830 to 2018.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1830

    Steam-only intercity trains

    The Liverpool and Manchester Railway opened on 15 September 1830. The University of Manchester Library calls it "the first exclusively steam-powered railway in the world", "the first inter-city railway" and "the first railway to be fully timetabled". On opening day William Huskisson, the member of Parliament for Liverpool, fell onto the track and was struck by Stephenson's Rocket, and died that evening.

    LessonThe first day of intercity passenger service showed the danger of standing on a line in use.

    rylandscollections.com

    Credit

    George Stephenson; the Liverpool and Manchester Railway

  2. 1863

    Trains under a city

    The Metropolitan Railway in London opened its first section, 6 km between Paddington and Farringdon Street, on 9 January 1863, and carried its first passengers the next day. Guinness World Records lists it as the first underground railway.

    guinnessworldrecords.com

    Credit

    the Metropolitan Railway

  3. 1964

    A line built for speed

    The Tokaido Shinkansen between Tokyo and Osaka opened in 1964, just before the Tokyo Olympics, and its trains were the first in the world to reach 200 km/h. From Central Japan Railway's (JR Central's) 2017 annual report, Nippon.com gives an average delay of 24 seconds per train in fiscal 2016, counting earthquakes and storms, an average of 365 trains a day, and no fatal accidents since the line opened.

    nippon.com

    Credit

    Japanese National Railways; now JR Central

  4. 2008

    China builds the largest network

    The Beijing–Tianjin intercity line, opened in 2008, was China's first high-speed line designed for 350 km/h, and it had carried 340 million passengers by August 2023. China's high-speed network passed 50,000 km on 26 December 2025 with the opening of the 299 km Xi'an–Yan'an line, by China Daily's count.

    globaltimes.cninvestinchina.chinadaily.com.cn

    Credit

    China's railway ministry, now China State Railway Group

  5. 2018

    A timetable change collapses

    A new British timetable on 20 May 2018 failed: about 270 trains a day of the operator GTR did not run at all, and Northern failed to run 125 of its 2,510 planned services, by the count of the Office of Rail and Road (ORR). The ORR's inquiry, chaired by Stephen Glaister, found that Network Rail, GTR, Northern, the Department for Transport and the ORR itself all made mistakes.

    LessonThe inquiry found "an apparent gap in industry responsibility and accountability for managing systemic risks".

    orr.gov.uk

    Credit

    the ORR inquiry

Watch for

  1. 400 km/h in service

    China's CR450 trains are designed to carry passengers at 400 km/h, 50 km/h faster than its current fastest trains. China State Railway Group said in March 2026 that both prototypes had passed all type tests and completed 300,000 km of trial running, and China Daily reports that one reached 453 km/h in trials; China's October 2026 railway technology plan gives no date for 400 km/h service.

    Achieved whenCR450 trains carry paying passengers at 400 km/h and an outside party reports their running times.

    chinadailyhk.com

    Claimed by

    China State Railway Group, March 2026; China's National Railway Administration, October 2026

Open

  1. 01

    One clock for punctuality

    A public dataset and code that measure punctuality in several European countries by the same rules, for example the share of trains that reach their final stop under 1, 3, 5 and 15 minutes late, with canceled trains counted, computed from each country's open train-running data. As a check, apply each country's own rule and reproduce its published figure.

    The brief
    Credit · unclaimed
  2. 02

    Link delays to causes

    In Britain every delay of three minutes or more is investigated and, where possible, traced to a cause and to the incident that started it. A reactionary delay is one caused by another late train. Build a tool that links each delayed train to its incident using only open data, the train-movement records in Network Rail's open data feeds and the timetable, and score it against the incident numbers that Network Rail publishes in its files of past delays.

    The brief
    Credit · unclaimed

Open 01 · the brief

One clock for punctuality

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public dataset and code that measure punctuality in several European countries by the same rules, for example the share of trains that reach their final stop under 1, 3, 5 and 15 minutes late, with canceled trains counted, computed from each country's open train-running data. As a check, apply each country's own rule and reproduce its published figure.

Why it is still open

The 14th market monitoring report of IRG-Rail, the group of European rail regulators, shows that countries use different limits: three minutes in Switzerland, 5 minutes 29 seconds in Austria and Finland, 5 minutes 59 seconds in Belgium, Poland and Sweden, and 20 minutes in Romania. A study for the Swedish Parliament found detailed comparison "difficult" because definitions differ, including whether canceled trains are counted.

croatiaweek.comepf.eu

Built with what exists

Open train-running data, such as Finland's Digitraffic and Switzerland's open transport data portal; Python; a web agent to find and document each country's data and rules (see the Note "Deleting 80% to start over").

digitraffic.fiopentransportdata.swiss

  1. First step

    Take one month of Finnish and Swiss data, compute punctuality under each country's own rule, and compare it with the published figure.

  2. Done looks like

    At least six countries and twelve months of data, each country's own figure reproduced within one percentage point, and a public table of all countries under the common rules, with code public.

Open 02 · the brief

Link delays to causes

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

In Britain every delay of three minutes or more is investigated and, where possible, traced to a cause and to the incident that started it. A reactionary delay is one caused by another late train. Build a tool that links each delayed train to its incident using only open data, the train-movement records in Network Rail's open data feeds and the timetable, and score it against the incident numbers that Network Rail publishes in its files of past delays.

Why it is still open

A University of Southampton review for RSSB calls the attribution process "time- and resource-consuming, and prone to error, inconsistency and dispute"; it helped the firm CACI develop an algorithm for reactionary delays whose causes are "causally self-evident", and this research found no public test of it. In Sweden, a 2024 study found that machine-learning classifiers did worse than people at assigning delay codes.

southampton.ac.uknetworkrail.co.ukarxiv.org

Built with what exists

Network Rail's open data feeds; its published files of attributed delays; Python; a model that assigns probabilities across a fixed list of answers, here the cause codes (see the Note "A thousand questions, one pass").

publicdatafeeds.networkrail.co.uk

  1. First step

    Register for Network Rail's open data feeds, record a week of train movements on one route, and download the matching delay file once it is published.

  2. Done looks like

    For one full railway period on at least one route, a published table of the share of delayed trains linked to the same incident as Network Rail's final attribution, reported separately for reactionary and other delays, with code public.