Industries / Mining and materials / Pulp and paper
Chemical recovery
Chemical recovery burns black liquor, the spent cooking liquor of a kraft mill, to recover its sodium and sulfur for reuse and to raise steam and power.
5
Milestones achieved, from 1929 to 2023.
1
To watch for: announced, not yet confirmed outside.
1
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1929
The recovery boiler arrives
A recovery boiler burns concentrated black liquor, collects the cooking chemicals as a molten salt called smelt, and uses the heat to raise steam. Babcock & Wilcox says it developed the first kraft recovery boiler with G.H. Tomlinson in 1929. The 2018 Forest Products Laboratory review names Tomlinson's recovery boiler, with Dahl's recovery cycle, as the reason kraft became the dominant process.
Credit
G.H. Tomlinson; Babcock & Wilcox
1961
The industry pools its incidents
When water meets molten smelt it can explode. Alarmed by the number of damaging smelt-water incidents, several groups of professionals formed the Black Liquor Recovery Boiler Advisory Committee (BLRBAC) late in 1961, and it issued shared practices such as an emergency shutdown procedure. By BLRBAC's figures, reported in 2007, the running average of damaging smelt-water incidents fell from 6 per 100 operating years in 1973 to 4 in 1983, 2.3 in 1993 and 0.3 after 2003.
LessonSharing incident reports across rival companies cut explosions for the whole industry.
Credit
BLRBAC
2010
Diesel from tall oil
Crude tall oil is an oily by-product of chemical pulp mills. SunPine's plant at Piteå, Sweden, opened in 2010 and turns it into crude tall diesel, which Preem refines into a renewable diesel at Gothenburg; the fuel went on sale on 9 April 2011. IEA Bioenergy's 2023 assessment calls the plant the first facility of its kind in the world.
Credit
SunPine and its founder Lars Stigsson; Preem
2013
Lignin taken from black liquor
Domtar's mill in Plymouth, North Carolina, started the first full-scale LignoBoost plant, which separates lignin out of black liquor; it made its first washed lignin cake on 15 February 2013. Taking lignin out eased the load on the recovery boiler, which had limited the mill, and by Valmet's account raised pulp capacity by 5%.
Credit
Domtar; Valmet, the supplier
2023
Gasification proven, never built
Chemrec's pressurized, oxygen-blown gasifier at Piteå turned black liquor into gas instead of burning it, and ran more than 28,000 hours, over 12,000 of them making methanol and bio-DME (a diesel substitute); trucks ran 100,000 km each on the fuel. A planned EUR 350 million commercial plant at Domsjö never got a go-ahead, and the pilot is idle. IEA Bioenergy's 2023 assessment calls the project a technical success.
LessonThe assessment says a working process still needed at least 15 years of stable policy to be financed at full scale.
Credit
Chemrec; LTU Green Fuels; assessment by IEA Bioenergy
Watch for
Capturing recovery boiler CO2
CO280 says a test unit from SLB Capturi, rated at 3 tonnes a day, ran more than 4,000 hours on the stack gas of a recovery boiler at an unnamed US Gulf Coast pulp mill and captured a steady 95% of the CO2. Because that carbon came from trees, storing it underground counts as removing CO2 from the air, and buyers in the Frontier coalition have contracted 224,500 tonnes of removal from CO280 for US$48.0 million, for delivery in 2028 to 2030.
Achieved whena full-scale unit injects CO2 into a permitted storage well and an outside verifier confirms the tonnes removed.
Claimed by
CO280, November 2025
Open
01
A public recovery boiler incident set
A public, structured dataset of recovery boiler incidents drawn from reports that regulators already publish. Each incident is coded for the part of the boiler involved, the cause (for example a tube leak or a smelt-water reaction), whether an emergency shutdown was used, and the outcome, with a short guide to the coding.
The briefCredit · unclaimed
Open 01 · the brief
A public recovery boiler incident set
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public, structured dataset of recovery boiler incidents drawn from reports that regulators already publish. Each incident is coded for the part of the boiler involved, the cause (for example a tube leak or a smelt-water reaction), whether an emergency shutdown was used, and the outcome, with a short guide to the coding.
Why it is still open
The industry's best-known figures are BLRBAC's running averages. Regulator reports, such as Technical Safety BC's investigation of a leak in the lower furnace of a recovery boiler in Prince George in 2020, sit as separate web pages and PDFs. A search found no combined, coded public set.
Built with what exists
A language model that reads PDF reports and fills a fixed form, such as Claude (Note: "Seven more flagged" covers a similar document-review job); a spreadsheet or SQLite database; two people who check a sample by hand.
First step
Download every recovery boiler investigation from the Technical Safety BC and WorkSafeBC sites and code ten by hand to settle the form.
Done looks like
At least 100 public incident reports coded. Two people each code a random 20% on their own, and the model's coding agrees with theirs on at least 90% of fields. The dataset and coding guide are published under an open licence.