Industries / Energy, water and waste / Power generation
Running and maintaining a plant
Every plant must be kept safe and ready to run: staffed and inspected, repaired in planned outages, and prepared for extreme weather.
4
Milestones achieved, from 1915 to 2021.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1915
A code for boilers
ASME published its Boiler Code in 1914 and 1915, which it calls "the first comprehensive standard for the design, construction, inspection, and testing of boilers and pressure vessels." It is still used in power plants, nuclear plants and many other industries, and has served as an international benchmark since 1972.
Credit
ASME
1979
Lessons after Three Mile Island
After the 1979 accident, the NRC revised operator training and staffing, improved control-room instruments, required at least two resident inspectors at each plant and set up a 24-hour operations center. The industry created the Institute of Nuclear Power Operations, which shares operating experience among plants.
Credit
US Nuclear Regulatory Commission; US nuclear industry
2018
Refueling outages get shorter
US nuclear plants shut down to refuel every 18 to 24 months. EIA reports that in 2018 these outages averaged about 25 days per reactor, and the fleet reached its highest capacity factor on record, 92.6%. Nearly all the recent cut in outage time came from faster refueling.
Credit
US nuclear plant operators; EIA (record)
2021
Texas plants freeze
Between 8 and 20 February 2021, extreme cold led 1,045 generating units in Texas and the south-central US to suffer 4,124 outages, cuts in output or failures to start. Three-quarters were caused by frozen equipment (44.2%) or fuel supply problems (31.4%). Grid operators cut 23,418 MW of customer demand, the largest controlled load shed in US history, and at least 210 people died. It was the fourth cold-weather event in ten years to threaten the grid.
Lessonplants in warm regions must be prepared for rare cold, because it keeps returning.
Credit
FERC and NERC staff report, November 2021
Watch for
Legged robots on rounds
ANYbotics says more than 50 customers in power, metals and materials run over 120,000 autonomous inspections a month with its four-legged ANYmal robots, and in October 2026 it began delivering ANYmal X, which it calls the world's first legged inspection robot for explosive atmospheres. It names no power plant customers and cites no independent results.
Achieved whena named plant operator publishes measured results from routine robot rounds, such as faults found, readings missed and cost.
Claimed by
ANYbotics, October 2026
Open
01
Why European plants break down
An open table that codes every unplanned outage reported by European power plants by cause, such as equipment failure, fuel, cooling water, weather or strikes, from the free-text reasons operators file.
The briefCredit · unclaimed02
Check promised return dates
A public measure of how often European plants come back from an unplanned outage later than their operators first said, and by how much, from the same outage notices.
The briefCredit · unclaimed
Open 01 · the brief
Why European plants break down
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open table that codes every unplanned outage reported by European power plants by cause, such as equipment failure, fuel, cooling water, weather or strikes, from the free-text reasons operators file.
Why it is still open
EU rules require a plant to publish any change of 100 MW or more in its availability within an hour, with the reason and an estimated end date. A 2022 study of these records found results "very variable" across countries, with "a number of challenges and ambiguities." A search found no labeled set of the reasons.
Built with what exists
ENTSO-E Transparency Platform outage data (free account); a language model that proposes a cause code for each reason and quotes the text behind it; a written cause scheme; two human coders; Python.
First step
Download one year of forced outages for one country and code 200 by hand.
Done looks like
Every forced outage from 2015 to 2025 coded, a random 2% coded blind by a second person with agreement reported as Cohen's kappa (a standard score for agreement beyond chance), and the table, scheme and code published.
Open 02 · the brief
Check promised return dates
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public measure of how often European plants come back from an unplanned outage later than their operators first said, and by how much, from the same outage notices.
Why it is still open
Britain's system operator, NESO, wrote in June 2026 that during hot weather the gap between the availability plants declared and what they delivered had been "more significant than NESO would expect," and asked operators to report more consistently. A search found no study measuring how accurate announced end dates are.
Built with what exists
ENTSO-E outage notices and their updates; Britain's REMIT outage messages; Python; a written analysis plan.
First step
Download a year of forced outages for one country and confirm that each outage's first announced end date can be recovered from its update history.
Done looks like
For every forced outage of thermal units from 2018 to 2025 in at least five countries, the share that ended later than first announced and the median delay in hours, with 100 cases checked by hand and the code published.