Building a pipeline

Building a pipeline means choosing a route, laying and joining steel pipe in a trench or under rivers and roads, testing it, and keeping a record of what went into the ground.

6

Milestones achieved, from 1865 to 2010.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1865

    Pipe beats the wagon

    Van Syckel's line used two-inch wrought iron pipe in 15-foot lengths and three steam pumps, and moved 81 barrels an hour. He charged $1.00 a barrel to Miller Farm; teamsters had charged about $4 or more for long hauls. Teamsters attacked the line, and he hired guards until the damage stopped.

    petroleumhistory.org

    Credit

    Samuel Van Syckel

  2. 1925

    An all-welded line

    The US Department of Energy's National Energy Technology Laboratory dates the first all-welded pipeline to 1925: more than 200 miles from Louisiana to Texas. It says the welded line was stronger, needed less maintenance and resisted leaks better.

    netl.doe.gov

    Credit

    the laboratory's account does not name the builder (see Checks)

  3. 1943

    The Big Inch

    German submarines attacked 74 ships along the US East Coast, in the Caribbean and in the Gulf of Mexico between 11 January and 28 February 1942, and all but one were sunk or damaged. In response, War Emergency Pipelines, Inc. built the 24-inch Big Inch from East Texas toward Philadelphia and New York, with the final weld in July 1943, 350 days after work began. The 20-inch Little Big Inch followed for refined fuels. In 1947 Texas Eastern Transmission bought both for $143,127,000 and converted them to carry natural gas.

    Lessona line built for oil can be reused for gas.

    aoghs.org

    Credit

    War Emergency Pipelines, Inc.; Burt E. Hull of the Texas Company directed Big Inch construction

  4. 1971

    Under the river

    Martin Cherrington's Titan Contractors drilled under the Pajaro River near Watsonville, California, for Pacific Gas and Electric and pulled about 500 feet of four-inch gas pipe through, using tools from a junk pile of utility drilling gear. This is horizontal directional drilling: a rig bores a steerable pilot hole at a shallow angle, widens it, and pulls the pipe back through, so the river bed is never dug up.

    thedriller.comfhwa.dot.gov

    Credit

    Martin Cherrington, Titan Contractors

  5. 1977

    Built for permafrost

    The 800-mile Trans-Alaska Pipeline, opened in 1977, runs from Prudhoe Bay to Valdez across ground that is mostly permafrost (soil that stays frozen all year). Engineers raised 420 miles of it on about 78,000 supports, some fitted with ammonia-filled tubes that draw heat out of the soil, and refrigerated 4 buried miles. In 2021 thawing ground on one slope tilted and bent several supports, which Alaska officials could not match to any earlier case.

    Lessondesigns that rely on frozen ground need watching as the climate warms.

    pbs.orginsideclimatenews.org

    Credit

    Alyeska Pipeline Service Company

  6. 2010

    The records were wrong

    On 9 September 2010 a 30-inch PG&E gas line ruptured in San Bruno, California, killing eight people and destroying 38 homes. The US National Transportation Safety Board (NTSB) found a badly welded short pipe section installed in 1956. PG&E's records listed the segment as pipe made without a welded seam, which the NTSB said was not, and still is not, made in diameters above 26 inches. Since 1 July 2020 US gas operators must reconfirm the safe pressure of lines whose records are not "traceable, verifiable, and complete."

    Lessonrecords must be checked against the pipe they describe.

    ntsb.govgovinfo.gov

    Credit

    PG&E (operator); NTSB (investigation); Pipeline and Hazardous Materials Safety Administration (PHMSA, the US regulator; rule)

Watch for

  1. Gas lines converted to hydrogen

    Gascade says it converted about 400 km of existing natural gas pipelines, 1.4 meters across, to carry hydrogen, filled the first sections, and made the line available to the market as part of Germany's hydrogen core network.

    Achieved whenhydrogen is delivered to paying customers at stated volumes, as reported by an outside party such as Germany's Federal Network Agency.

    fnb-gas.de

    Claimed by

    Gascade Gastransport, December 2025

Open

  1. 01

    Map where drilling fluid escapes

    A public table of every inadvertent return on one large project. An inadvertent return is when the drilling mud used in horizontal drilling breaks out to the surface or into a stream. Record its place, the depth of the bore, the rock type and what followed, then test whether a few simple factors predict where returns happen.

    The brief
    Credit · unclaimed
  2. 02

    Catch impossible pipe records

    An open rulebook of pipe-record entries that cannot be true or are very unlikely, such as 30-inch pipe without a welded seam from the 1950s, each rule with a public source, and a checker that flags them in a records file.

    The brief
    Credit · unclaimed

Open 01 · the brief

Map where drilling fluid escapes

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of every inadvertent return on one large project. An inadvertent return is when the drilling mud used in horizontal drilling breaks out to the surface or into a stream. Record its place, the depth of the bore, the rock type and what followed, then test whether a few simple factors predict where returns happen.

Why it is still open

Pennsylvania's environment department posts the Mariner East 2 records one crossing at a time, as reevaluation reports required by a 2017 Environmental Hearing Board order. The report for one crossing ties two returns to fractured, weathered rock. No count or analysis across the whole project was found.

files.dep.state.pa.us

Built with what exists

AI models that read long documents and pull out facts (Note: "Seven more flagged"; Note: "A trillion open parameters"); Pennsylvania's public geologic maps; Python and QGIS.

  1. First step

    Download the reevaluation reports from the department's pipeline portal and list each crossing with the returns it describes.

  2. Done looks like

    Every return named in the department's Mariner East 2 records in one table, each row linked to the page it came from; a second person checks 50 rows and agrees on at least 95%; and a simple model's ranking of crossings by risk, scored on crossings held out from training.

Open 02 · the brief

Catch impossible pipe records

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open rulebook of pipe-record entries that cannot be true or are very unlikely, such as 30-inch pipe without a welded seam from the 1950s, each rule with a public source, and a checker that flags them in a records file.

Why it is still open

At San Bruno, the record for the failed pipe described a kind of pipe that is not made at that size. Operators still have to find and fix records that are not traceable, verifiable and complete under the 2019 US rule. Vendors sell record-checking software, but no published rule set with sources was found.

ntsb.govgovinfo.gov

Built with what exists

Public NTSB reports and PHMSA-funded studies of older pipe; a language model to draft rules from them, with a person approving each; Python.

  1. First step

    Write the first ten rules from the San Bruno report and build the seeded test file.

  2. Done looks like

    At least 50 rules, each citing a public source; on a synthetic 10,000-row records file seeded with 200 known errors, the checker flags at least 190 and wrongly flags fewer than 1% of correct rows; the rules, the checker and the test file published.