Directional drilling is the work of steering a well along a planned path away from vertical, to reach rock that is not directly below the rig, and of measuring where the hole has actually gone.

5

Milestones achieved, from 1962 to 2011.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1962

    Slant wells steal oil

    In the East Texas field, some operators drilled from land outside the field and bent their holes underground into neighbors' leases (the patches of ground whose oil another company held the right to produce). The Handbook of Texas says inspectors found 380 deviated wells and shut them down, and that an estimated $100 million of oil was taken over several decades; the Texas State Library counts 93 wells and dates the case to 1961. On 2 November 1962 the Railroad Commission of Texas amended its Statewide Rule 54 to require inclination surveys (measurements of how far a hole leans from vertical) on all wells drilled and to set out how directional surveys are run and reported.

    Lessonwhere a well goes underground has to be measured and filed, because no one can see it from the surface.

    tshaonline.orgtsl.texas.govwebarchive.library.unt.edu

    Credit

    Railroad Commission of Texas

  2. 1997

    Ten kilometers sideways

    An extended-reach well travels far sideways from its rig, so rock under the sea or under protected land can be reached from one site. SLB's history records the completion, at Wytch Farm in southern England in 1997, of "the world's first extended-reach well with a departure of 10 km" (departure is the horizontal distance from the rig to the end of the well). BP Amoco's Wytch Farm team then drilled well M-16 to 11,278 m between August 1998 and August 1999, which its engineers called record breaking. ADNOC said in October 2022 that it had drilled a 50,000-ft (about 15.2 km) well from an artificial island at Upper Zakum, about 800 ft longer than a record set in 2017; that figure is ADNOC's own.

    slb.comdoi.orgdrillingcontractor.org

    Credit

    BP and BP Amoco's Wytch Farm team; SLB

  3. 1999

    Steering while the pipe turns

    With older methods, the drill pipe had to stop turning and slide along the hole while the driller pointed the bit, which is slow and hard to do in long wells because of friction. A rotary steerable system steers the bit while the whole pipe keeps rotating. Baker Hughes Inteq and Eni (Agip) introduced their AutoTrak system in 1997, and SLB introduced PowerDrive in 1998. Esso Norge began drilling the Jotun field in the North Sea in April 1999, which an Esso Norge engineer called the first field developed with rotary steering, and reported no hole problems in its 15-well campaign.

    offshore-mag.comogj.comslb.com

    Credit

    Baker Hughes Inteq and Eni; SLB; Esso Norge

  4. 2000

    A shared model of error

    Every survey of a well's path carries some error, so a well's true position is a zone around the drawn line, and two zones that overlap warn that wells could collide. The Industry Steering Committee on Wellbore Survey Accuracy (ISCWSA), formed in 1995 "to dispel the confusion and secrecy commonly associated with wellbore surveying," produced a common method to predict that uncertainty for MWD (measurement while drilling) surveys. H. S. Williamson of BP published it in SPE Drilling & Completion in December 2000 as a self-contained reference any company could program. The committee still maintains the framework; it agreed revision 5 in October 2019.

    doi.orgiscwsa.netiscwsa.net

    Credit

    H. S. Williamson (BP) and the ISCWSA's member companies

  5. 2011

    Sideways becomes the norm

    Horizontal drilling bends a well until it runs along a rock layer, so more of the hole sits in rock that holds oil or gas. The US Energy Information Administration (EIA) says hydraulically fractured horizontal wells became the main method of new US oil and gas development in October 2011, when their total drilled footage passed all other methods, and have been most of all new wells since late 2014. In 2016 they were 69% of US wells drilled and 83% of drilled footage, by EIA's figures.

    eia.gov

    Credit

    US operators and their directional drilling contractors; figures from the EIA

Watch for

  1. AI steers a Libyan lateral

    Libya's National Oil Corporation says the Sirte Oil Company drilled the 1,800-ft horizontal section of a well in the Al-Khair field with SLB's Neuro autonomous directional drilling and autonomous geosteering software, which kept the bit in the target layer with no manual steering. It says the rate of penetration (drilling speed) doubled and that the well tested at 1,060 barrels a day on an electric submersible pump, and calls it the first such operation in Libya and the second in the world. No comparison wells or measured data were published.

    Achieved whendrilling speed and position-in-layer data are published against comparison wells and checked by someone outside SLB and Sirte, or the system is reported in routine use on later wells.

    noc.lycompleteaitraining.com

    Claimed by

    National Oil Corporation of Libya and Sirte Oil Company, March 2026

Open

  1. 01

    Read old directional surveys

    A tool that reads directional survey reports (tables of measured depth, inclination and azimuth, the compass direction of the hole) from scanned or PDF well files, rebuilds the well's path with the standard minimum-curvature method (which joins survey points with smooth arcs), and flags pages where the numbers do not fit together.

    The brief
    Credit · unclaimed
  2. 02

    Check the autonomy claims

    A public, dated register of every announced autonomous or closed-loop directional drilling run, recording section length, the share drilled without human steering, comparison wells, who measured the result, and whether anyone outside the service company confirmed it, with each field linked to the sentence that supports it.

    The brief
    Credit · unclaimed

Open 01 · the brief

Read old directional surveys

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A tool that reads directional survey reports (tables of measured depth, inclination and azimuth, the compass direction of the hole) from scanned or PDF well files, rebuilds the well's path with the standard minimum-curvature method (which joins survey points with smooth arcs), and flags pages where the numbers do not fit together.

Why it is still open

Reading surveys is still described as manual work. A 2024 EAGE conference paper by O. A. Gune, P. Pillai and R. Gupta says extraction from multipage PDF and TIFF well reports "has predominantly been a manual effort" and proposes an AI-assisted workflow, but its abstract gives no accuracy figures and no public test set. Data firms such as Novi Labs sell "clean, digitized surveys" and publish no error rate. The closest public measurement, a 2024 study using open Llama 2 models on 160 historical well records, extracted only location and depth, and its accuracy fell from 100% on clean PDF reports to 70% on image-based records.

doi.orgnovilabs.comarxiv.org

Built with what exists

Vision-language models that read scanned tables; open-weight models that can run on your own hardware (see the Note "A trillion open parameters"); welleng, an open-source Python library (Apache 2.0) with minimum-curvature paths and the ISCWSA error model; the US offshore regulator BSEE's data center, which offers both scanned directional survey documents and a digital file of all releasable survey points for wells in US federal waters; Utah FORGE well 16A(78)-32, whose public files include both a survey report PDF and the same survey as a spreadsheet.

github.comdata.bsee.govgdr.openei.org

  1. First step

    Run a vision-language model on the FORGE 16A(78)-32 survey report PDF, rebuild the path with welleng, and compare every survey station with the spreadsheet; then download 20 scanned BSEE surveys and their digital points and repeat.

  2. Done looks like

    On at least 200 BSEE wells, the stations read from the scanned survey match BSEE's digital survey points, and the rebuilt end-of-well position lies within 3 m (10 ft) of the position computed from the digital file for at least 95% of wells, with the tool, well list and errors published.

Open 02 · the brief

Check the autonomy claims

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public, dated register of every announced autonomous or closed-loop directional drilling run, recording section length, the share drilled without human steering, comparison wells, who measured the result, and whether anyone outside the service company confirmed it, with each field linked to the sentence that supports it.

Why it is still open

The claims arrive with few numbers and no outside check. Libya's National Oil Corporation reports a doubled drilling speed with no comparison data, and AVEVA's September 2026 survey of autonomous drilling projects lists seven, several with no figures given, as narrative rather than a checkable table.

noc.lyaveva.com

Built with what exists

An AI agent that searches trade press, SPE papers and company filings and cites the sentence behind every field it fills (see the Note "Findings that cite notes"); two human checkers; a shared spreadsheet; the ISCWSA's published survey terms for consistent definitions.

  1. First step

    Code the projects named in the AVEVA survey and the Libyan release by hand, to fix the columns and the rule for "confirmed by an outside party."

  2. Done looks like

    At least 40 claims from 2019 to 2026 coded, every field linked to its source sentence, agreement between the two checkers reported as Cohen's kappa (a standard score of how often two raters agree beyond chance), and the register published under an open license and updated each quarter.