BRENNEN

Industries / Energy, water and waste / Oil and gas extraction

Offshore platforms

Offshore work is building and running the structures and vessels that drill for and produce oil and gas under the sea, from piers off a beach to machines on a seabed 300 m down.

6

Milestones achieved, from 1897 to 2015.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

In depth

The same ground is charted in more depth, as an industry of its own.

The road

AchievedWatch forOpen

Achieved

  1. 1897

    Wells off a pier

    At Summerland, California, Henry L. Williams and his associates built a pier 300 feet into the Pacific in 1896, and by 1897 the first offshore well there was producing oil, according to the American Oil & Gas Historical Society.

    aoghs.org

    Credit

    Henry L. Williams

  2. 1947

    Out of sight of land

    Kerr-McGee's Kermac No. 16, 43 miles southwest of Morgan City, Louisiana, began drilling on 10 September 1947 and produced 40 barrels of oil an hour from 14 November. It was the first offshore rig in the Gulf of Mexico out of sight of land. In 1954 Mr. Charlie became the first mobile offshore drilling unit, a rig that could be floated to a new site.

    aoghs.org

    Credit

    Kerr-McGee

  3. 1980

    A rig capsizes

    On 27 March 1980 the semi-submersible platform Alexander L. Kielland broke down in a North Sea storm and 123 people died. One lower brace had failed by fatigue (cracking that grows under repeated loads), starting from a fillet weld joining a 0.325 m tube to the brace, according to a 1984 metallurgical investigation.

    Lessonone small weld on a load-bearing member can bring down a whole structure, so fatigue must be designed for and inspected.

    osti.gov

    Credit

    investigators A. Almar-Naess, P. J. Haagensen, B. Lian, T. Moan and T. Simonsen

  4. 1988

    Piper Alpha burns

    On 6 July 1988 gas leaking from a condensate pump ignited on the Piper Alpha platform in the UK North Sea, and 167 men died. Lord Cullen's inquiry found the leak followed maintenance on a pump and its safety valve carried out at the same time, and made 106 recommendations. UK safety case regulations, which require each operator to show the regulator how it controls major hazards, followed in 1992.

    Lessonwork on linked equipment must be tracked as one job.

    offshore-technology.com

    Credit

    Lord Cullen's public inquiry

  5. 1995

    Brent Spar not dumped

    Shell planned, with UK government approval, to sink its disused Brent Spar oil storage buoy in the deep Atlantic. After Greenpeace occupied the buoy, other European governments objected and drivers boycotted Shell stations in Germany and the Netherlands, Shell cancelled the plan on 20 June 1995 and sought onshore disposal, according to Oil & Gas Journal.

    Lessona regulator's approval is not enough for a disposal plan the public rejects.

    ogj.com

    Credit

    Shell; Greenpeace

  6. 2015

    Compressors on the seabed

    As a gas field ages, its pressure falls and the gas stops flowing well. On 17 September 2015 Statoil (now Equinor) started what it called the first subsea gas compression plant in the world, at the Åsgard field in the Norwegian Sea in 300 m of water, expecting about 306 million extra barrels of oil equivalent.

    equinor.com

    Credit

    Statoil and its Åsgard partners

Watch for

  1. Robot on an unmanned platform

    Aker BP is trialling a Taurob robot for inspections and data collection on its new unmanned Fenris platform in the Norwegian North Sea, before production starts in the third quarter of 2027. It will judge reliability, availability, safety and cost; no results are published yet.

    Achieved whentrial results are published and the robot moves into normal operations.

    offshore-mag.com

    Claimed by

    Aker BP, May 2026

  2. Inspection drone flown from shore

    Aker Solutions says it completed the "first offshore beyond-visual-line-of-sight (BVLOS) drone operation," flying an inspection drone at Aker BP's Edvard Grieg platform from a control room in Stavanger. No flight numbers were given.

    Achieved whenroutine remote inspection flights are reported with figures and confirmed by Aker BP or an aviation regulator.

    marinetechnologynews.com

    Claimed by

    Aker Solutions, June 2025

Open

  1. 01

    Label offshore inspection images

    An open set of real underwater images of offshore structures, labelled pixel by pixel for marine growth, corrosion, anodes and damage, with a baseline model.

    The brief
    Credit · unclaimed
  2. 02

    Code every offshore investigation

    An open table that codes each US offshore incident investigation report by what happened, what failed and why, with each code linked to the page that supports it.

    The brief
    Credit · unclaimed

Open 01 · the brief

Label offshore inspection images

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open set of real underwater images of offshore structures, labelled pixel by pixel for marine growth, corrosion, anodes and damage, with a baseline model.

Why it is still open

Aalborg University researchers say labelled underwater survey data is hard and costly to get, so they trained on rendered images instead, and their synthetic image set "is commercial."

frontiersin.org

Built with what exists

Inspection video from structures already removed, released by operators or decommissioning contractors; image segmentation models; 3D rendering software for extra training images; two human labellers.

  1. First step

    Ask three operators or decommissioning contractors to release old inspection video from removed structures, and label 100 frames to test the label scheme.

  2. Done looks like

    At least 2,000 real images from at least five structures, labelled by two people with agreement reported, released under an open licence with a baseline score.

Open 02 · the brief

Code every offshore investigation

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table that codes each US offshore incident investigation report by what happened, what failed and why, with each code linked to the page that supports it.

Why it is still open

The US regulator BSEE posts panel investigation reports from 1992 and district reports from 2005, but its listing gives date, lease, block and incident type, not causes.

data.bsee.gov

Built with what exists

BSEE reports and raw-data export; a language model that proposes codes and cites the supporting text (Note: "Findings that cite notes"); a written cause scheme; two human coders.

  1. First step

    Download 20 panel reports, draft a cause scheme, and have two people code them independently.

  2. Done looks like

    Every BSEE panel report since 1992 coded, a random 10% coded blind by a second person with agreement reported, and the table, scheme and code published.