Efficiency after repair is the work of making sure a rewound motor uses no more electricity than it did before it failed, and proving it with tests.

6

Milestones achieved, from 1996 to 2020.

1

To watch for: announced, not yet confirmed outside.

3

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1996

    Repairs judged to waste energy

    A national study of the US motor repair trade, paid for by the US Department of Energy (DOE), the Bonneville Power Administration and the Electric Power Research Institute (EPRI), drew on a literature review, site visits and a survey of repair shops. It said careless repair and rewinding could cut a motor's efficiency by up to 5%, put the average loss after repair at 0.5 to 2.5%, and said these losses were unnecessary because motors can be rewound without any loss.

    Lessonearly loss figures came largely from tests on small motors, and later controlled tests on larger ones found that a careful rewind need not cost efficiency.

    osti.goviecex.com

    Credit

    V. Schueler, P. Leistner and J. Douglass, EPRI report TR-105731

  2. 2000

    Repair practice made a standard

    EASA had issued repair standards since 1945, when it published "Electric Motor and Generator Rebuilding Standards". In 2000 the American National Standards Institute (ANSI) approved its recommended practice for repairing rotating machines as an American National Standard, ANSI/EASA AR100-1998, which sets out good practice for each step from incoming tests to rewinding and final tests; it was revised in 2001, 2006, 2010, 2015, 2020 and 2025.

    easa.comeasa.com

    Credit

    EASA

  3. 2003

    Rewinding tested under control

    EASA and the UK's Association of Electrical and Mechanical Trades (AEMT) had 22 new motors of 50 to 300 hp (37.5 to 225 kW) and two of 7.5 hp tested at the University of Nottingham on a dynamometer, a machine that loads a motor and measures its output, before and after the Dowding and Mills shop in Birmingham rewound them. Ten motors rewound once under set controls lost 0.1 percentage points of efficiency on average (range +0.2 to -0.7), inside the test method's accuracy of plus or minus 0.2 points, while six rewound without specific controls lost 0.4 to 0.6 points on average.

    Lessonthe losses came from steps a shop can control: the temperature of the oven that burns off old insulation, the length of each coil turn, and too much bearing grease.

    iecex.comaceee.org

    Credit

    EASA, AEMT and the University of Nottingham

  4. 2007

    Utilities pay for good rewinds

    The Green Motors Practices Group, a non-profit run by repair-shop managers since 2006, began offering utility rebates in 2007 for rewinds done to its audited practices, through utilities in British Columbia and eight western US states, among them BC Hydro, Idaho Power and Avista. A 2014 report for the Asia-Pacific Economic Cooperation (APEC) forum lists it among North American repair quality programs, and DOE's 2021 motor market study asked plants whether they used its shops. The group stopped new audits on 1 August 2024, and US rebates through it ended on 30 August 2024.

    greenmotors.orggreenmotors.orgcleanenergyministerial.org

    Credit

    Green Motors Practices Group and its member utilities

  5. 2019

    A world standard for repair

    The International Electrotechnical Commission (IEC) published IEC 60034-23:2019 on 24 January 2019, a full international standard for the repair, overhaul and reclamation of rotating electrical machines that replaced a 2003 technical specification. The new edition added principles on machine efficiency, the environment, end-of-life recycling and the circular economy, and rules for repairing high-voltage and DC machines and for handing a repaired machine back with a report.

    webstore.iec.ch

    Credit

    IEC

  6. 2020

    Premium motors keep efficiency

    EASA and the AEMT repeated the test in 2019 on 10 new premium-efficiency motors of 40 to 100 hp (30 to 75 kW), the class called IE3 in the international scale that runs from IE1 (standard) upward. An independent lab, Advanced Energy in Raleigh, North Carolina, tested them before and after an accredited shop in North Charleston, South Carolina, rewound them with the burnout oven held to 370 °C. Efficiency changed by +0.3 to -0.5 points, a fall of 0.1 points on average, within the test's accuracy; EASA published the results in December 2020.

    iecex.comansi.org

    Credit

    EASA, AEMT and Advanced Energy

Watch for

  1. An AI for repair questions

    EASA launched Eddy, an AI assistant that it says is trained on its own material, including the AR100 repair standard, the 2019 rewind study and its good practice guide to maintaining motor efficiency, and that answers in many languages. EASA tells users to treat its answers as non-authoritative and discourages relying on it for winding redesigns.

    Achieved whenan outside party tests Eddy's answers against AR100 and the rewind studies on a published set of questions and reports a score.

    ecmweb.comeasa.com

    Claimed by

    EASA, June 2025

Open

  1. 01

    Rewind test for IE4 motors

    A before-and-after efficiency test of new IE4 ("super premium") induction motors rewound to the good practice of ANSI/EASA AR100, following the protocol of the 2003 and 2019 rewind studies, with all test tables published.

    The brief
    Credit · unclaimed
  2. 02

    Ten shops, one motor

    A blind test of everyday repair practice today. Ten identical new IE3 motors are tested at one lab, each is sent to a different ordinary repair shop as a paid full stator rewind, and each is tested again at the same lab, so that the spread of results shows what typical shops do now.

    The brief
    Credit · unclaimed
  3. 03

    Before and after, from meters

    An analysis of motors rewound in service, using data that water utilities and plants already log. For pumps with metered power, flow and pressure, compare the energy used per cubic meter pumped at the same head in the months before the motor failed and after the rewound motor returned.

    The brief
    Credit · unclaimed

Open 01 · the brief

Rewind test for IE4 motors

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A before-and-after efficiency test of new IE4 ("super premium") induction motors rewound to the good practice of ANSI/EASA AR100, following the protocol of the 2003 and 2019 rewind studies, with all test tables published.

Why it is still open

EASA's two studies tested energy-efficient (IE2) motors in 2003 and premium-efficiency (IE3) motors in 2019; neither tested IE4. Europe has required IE4 for most three-phase motors of 75 to 200 kW since 1 July 2023, and the US requires it for motors of 100 to 250 hp from 1 June 2027, a level DOE says has about 20% lower losses than IE3. These are the sizes most often repaired: DOE's 2023 rule assumes motors above 100 hp are repaired at least once. EASA told DOE that higher-efficiency designs may need more copper and more labor to rewind because their slots are packed fuller. Searches in November 2026 for rewind tests of IE4 or IE5 motors found none.

iecex.compublications.europa.eugovinfo.gov

Built with what exists

An accredited motor test lab with a dynamometer, testing to IEEE 112 Method B or IEC 60034-2-1; an EASA-accredited service center (EASA lists 164); a commercial core loss tester for the stator steel before and after stripping; the 2019 study's protocol and tables as the template.

  1. First step

    Ask EASA and the AEMT whether an IE4 study is planned, and ask two accredited labs to quote a before-and-after test of one 90 kW motor.

  2. Done looks like

    At least six new IE4 motors of 75 to 185 kW from at least three makers, tested at 25%, 50%, 75% and 100% load before and after one rewind; losses broken down by type; the mean and range of efficiency change published against the test's stated accuracy.

Open 02 · the brief

Ten shops, one motor

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A blind test of everyday repair practice today. Ten identical new IE3 motors are tested at one lab, each is sent to a different ordinary repair shop as a paid full stator rewind, and each is tested again at the same lab, so that the spread of results shows what typical shops do now.

Why it is still open

The test has been done once, with older motors. A DOE bibliography on motor repair summarizes a 1997 Pulp & Paper Canada article by A. Charette and P. Angers on 23 motors of 50 hp sent to 23 repair shops, which found that the drop in efficiency followed work practices, mainly in the stator and in bearing lubrication. The other controlled tests EASA and ACEEE cite, by Ontario Hydro on nine identical standard-efficiency motors and by BC Hydro on ten identical 20 hp premium motors in the early 1990s, and EASA's own 2003 and 2019 studies, each used one shop or set controls. A 2014 survey of 45 shops in China, Japan, New Zealand, the US and Vietnam for APEC found poor practices such as stripping windings cold with hand tools, but tested no motors. No multi-shop test of IE3 motors was found.

energy.govaceee.orgcleanenergyministerial.org

Built with what exists

Ten identical new IE3 motors of about 11 to 15 kW; one accredited test lab testing to IEC 60034-2-1 or IEEE 112 Method B; shops drawn at random from a public directory; winding resistance and no-load readings recorded at each step.

  1. First step

    Choose the motor model and the lab, get a quote for 20 efficiency tests, and draw a random list of 30 shops from a public directory to approach.

  2. Done looks like

    Ten motors rewound by ten shops and tested before and after at one lab; each motor's efficiency change and loss breakdown published with shops anonymized; the mean and range of change reported beside the 1997 Canadian results, and the test repeated in a second country.

Open 03 · the brief

Before and after, from meters

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An analysis of motors rewound in service, using data that water utilities and plants already log. For pumps with metered power, flow and pressure, compare the energy used per cubic meter pumped at the same head in the months before the motor failed and after the rewound motor returned.

Why it is still open

Lab studies test motors on a dynamometer, but most repair shops can only run a repaired motor with no load and report nothing on efficiency change (Kaddari and co-authors, 2020). In-place methods are weakest on these motors: in 1996 tests for the Bonneville Power Administration and Pacific Gas and Electric, most methods understated an old rewound 100 hp motor's low-load efficiency by 2 to 5%, and the authors called for validation on rewound and damaged motors. Searches in November 2026 for published before-and-after comparisons of rewound motors in service found none.

beei.orgaceee.org

Built with what exists

Pump-station records of power, flow and pressure exported from a utility's control system; motor repair work orders; Python with pandas and statsmodels; a model that answers fixed questions about each work order, such as Gemini Decision 1 (see the Note "A thousand questions, one pass").

  1. First step

    File a public records request with one city water utility for pump-station history and motor repair work orders since 2015.

  2. Done looks like

    At least 20 rewound pump motors, each with at least three months of data before failure and three months after return; the change in kilowatt-hours per cubic meter at matched head, with a 95% confidence interval; a second analyst repeats five cases; code and anonymized data published.