Inspection and testing finds damage in boilers, pressure vessels, piping and tanks, mostly without cutting into them, and decides when each must be checked again.

5

Milestones achieved, from 1866 to 2012.

3

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

In depth

The same ground is charted in more depth, as an industry of its own.

The road

AchievedWatch forOpen

Achieved

  1. 1866

    Inspectors paid by owners

    On 6 January 1866 boiler owners in Mannheim, Germany, founded a society to inspect and insure steam boilers, after a brewery boiler there exploded in 1865, killing one man and injuring four; it was the first TÜV association. On 30 June 1866 the Hartford Steam Boiler Inspection and Insurance Company was founded in Connecticut, on the idea that insurance would give owners a reason to pay for good inspections.

    deutschland.demunichre.com

    Credit

    the Mannheim boiler owners; the founders of Hartford Steam Boiler, from Hartford's Polytechnic Club

  2. 1915

    A code for boilers

    On 10 March 1905 a boiler explosion at the Grover Shoe Factory in Brockton, Massachusetts, killed 58 people and injured 117. ASME, the American Society of Mechanical Engineers, began a boiler code in 1911, and its 1914 edition, published in 1915, ran to 114 pages. ASME says all Canadian provinces and 49 of the 50 US states have since adopted sections of the code into law.

    asme.org

    Credit

    ASME

  3. 1940

    Sound finds hidden flaws

    Floyd A. Firestone of Ann Arbor, Michigan, applied on 27 May 1940 for a patent on a device that sends high-frequency vibrations into a solid part and times their echoes, to find hidden cracks and holes and to measure thickness when the far side cannot be reached. The patent, US 2,280,226, was granted on 21 April 1942.

    patents.google.com

    Credit

    Floyd A. Firestone

  4. 2002

    Inspect where risk is

    In May 2002, after six years of preparation, the American Petroleum Institute published the first edition of API 580, Risk-based Inspection. Risk-based inspection ranks equipment by how likely it is to fail and how bad a failure would be, and sets what to inspect, and how often, from that ranking.

    inspectioneering.com

    Credit

    American Petroleum Institute

  5. 2012

    The inspection never done

    In 2009 Chevron's own metallurgists recommended inspecting every component of high-temperature carbon steel piping exposed to sulfidation, a form of corrosion by sulfur compounds that thins pipe evenly until it bursts. The program was never carried out at the Richmond refinery, and a thin, low-silicon pipe component stayed in service until it failed on 6 August 2012. The fire endangered 19 workers and sent more than 15,000 residents to hospitals for medical attention.

    LessonWhere one component can corrode faster than the next, checking a sample of points is not enough.

    csb.govcsb.gov

    Credit

    investigated by the CSB

Watch for

  1. Tanks inspected while full

    Tristar Group's Guam fuel operation used Gecko Robotics' wall-climbing robots to take ultrasonic readings on tank walls and Square Robot's submersible robots on tank floors while the tanks stayed full and in service. The report says this avoided about 180 days of downtime and cut turnaround downtime by 66%, where each inspection cycle could take a tank out of service for up to six months.

    Achieved whenan inspector outside the three companies compares the robots' data with an inspection of the same tank emptied, and publishes the comparison.

    robotics247.com

    Claimed by

    Tristar Group, Gecko Robotics and Square Robot, August 2026

  2. A faster climbing robot

    Gecko Robotics says its new Raptor robot collects inspection data three to five times faster than its earlier robots and up to 20 times faster than other automated inspection tools, with ADNOC in the United Arab Emirates as its first customer.

    Achieved whenADNOC or another operator publishes measured inspection rates and coverage from routine use.

    roboticsandautomationnews.com

    Claimed by

    Gecko Robotics, November 2026

  3. Legged robots for explosive areas

    ANYbotics says it is shipping ANYmal X, which it calls the world's first legged robot built to work where a spark could cause an explosion, to customers including Equinor and DSM-Firmenich.

    Achieved whena customer reports months of routine, unattended inspection rounds in such an area, with the share of rounds completed.

    siliconangle.com

    Claimed by

    ANYbotics, October 2026

Open

  1. 01

    Name the mechanism first

    A public test that gives a person or an AI model the plant conditions described in a CSB report, stopping before the failure, and asks which damage mechanism, such as sulfidation, hydrogen attack or corrosion under insulation, will cause it. The answer is the mechanism the CSB later found.

    The brief
    Credit · unclaimed
  2. 02

    Grade rust to the standard

    A public set of at least 2,000 photos of painted steel in plants, each graded by two certified coating inspectors on the rust scale of ISO 4628-3, the standard for grading rust on painted surfaces, and a model trained to give the same grade.

    The brief
    Credit · unclaimed

Open 01 · the brief

Name the mechanism first

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public test that gives a person or an AI model the plant conditions described in a CSB report, stopping before the failure, and asks which damage mechanism, such as sulfidation, hydrogen attack or corrosion under insulation, will cause it. The answer is the mechanism the CSB later found.

Why it is still open

The CSB found that before the 2012 Richmond fire Chevron "did not effectively identify a likely piping damage mechanism". A search found no public test that scores people or models on naming damage mechanisms before the fact.

csb.gov

Built with what exists

The CSB's public investigation reports; the list of damage mechanisms in API RP 571; a model that answers fixed-choice questions, such as Google's Gemini Decision 1 (Notes: "A thousand questions, one pass").

  1. First step

    Read ten CSB reports on equipment failures and write each as a one-page case that ends before the failure.

  2. Done looks like

    Every CSB report on an equipment failure from corrosion or cracking written up as a case; scores published for each model tested and for two corrosion engineers who answer the same cases without seeing the reports.

Open 02 · the brief

Grade rust to the standard

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of at least 2,000 photos of painted steel in plants, each graded by two certified coating inspectors on the rust scale of ISO 4628-3, the standard for grading rust on painted surfaces, and a model trained to give the same grade.

Why it is still open

Public corrosion image sets are small and use other scales. One 2020 study trained its models on 116 images from cameras, drones and phones, labeled with categories from ISO 8501-1, a standard for grading bare steel, and a search found no set graded to ISO 4628-3.

arxiv.org

Built with what exists

Phone and drone cameras; an open image segmentation model such as Meta's Segment Anything; the reference pictures in ISO 4628-3.

  1. First step

    With the owner's permission, photograph 200 painted surfaces at one site and have two inspectors grade them separately, to measure how often they agree.

  2. Done looks like

    2,000 graded photos released, and a model that agrees with the inspectors on held-out photos at least as often as the two inspectors agree with each other.