BRENNEN

Industries / Industrial equipment and services / Industrial services

Planned maintenance

Planned maintenance is the routine care of pumps, motors, valves and other equipment, on a schedule or according to its condition, so that it does not fail in service.

4

Milestones achieved, from 1971 to 2014.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1971

    Operators take part in maintenance

    Nippondenso, the Toyota parts supplier now called DENSO, had introduced planned maintenance in 1961 and received a PM Prize from the Japan Institute of Plant Maintenance (JIPM) in 1971. JIPM began using the name total productive maintenance (TPM) around that time, meaning maintenance in which all employees, including machine operators, take part. MONOist reports that more than 3,100 sites have since received the award.

    monoist.itmedia.co.jp

    Credit

    Nippondenso and the Japan Institute of Plant Maintenance

  2. 1978

    Maintenance chosen by consequence

    F. Stanley Nowlan and Howard F. Heap wrote "Reliability-Centered Maintenance" for the US Department of Defense. It set out a decision diagram that chooses, for each important item, whether to inspect it for signs of coming failure, rework or discard it at a set age, or check it for hidden failures, with the aim of keeping the reliability built into the equipment at the lowest cost. The method is known as RCM.

    everyspec.com

    Credit

    F. Stanley Nowlan and Howard F. Heap

  3. 2005

    A padlock never fitted

    At the Buncefield oil depot in England, a tank level gauge stuck and the independent high-level switch, meant to stop filling automatically, did not work. Petrol overflowed, and the vapor cloud exploded on 11 December 2005, injuring more than 40 people. The switch needed a padlock to hold its test lever in the working position, but the supplier had not told the installer, the maintenance contractor or the site operator, so the padlock was never fitted. The gauge had stuck on and off since the tank was serviced in August 2005.

    LessonA safety device is only as good as the testing and maintenance that leave it working.

    icheme.org

    Credit

    investigated by the UK's Control of Major Accident Hazards Competent Authority, report published 2011

  4. 2014

    A standard for asset management

    BS ISO 55000, dated 31 January 2014 by the British Standards Institution, is the first part of an international series of standards on managing physical assets over their whole life. BSI says the series grew out of PAS 55, an earlier British specification.

    knowledge.bsigroup.com

    Credit

    ISO, building on PAS 55

Watch for

  1. Robots read the gauges

    Boston Dynamics says its four-legged Spot robot, running Google DeepMind's Gemini Robotics-ER 1.6 model inside its Orbit inspection software, can now read complex gauges and sight glasses on facility rounds, using visual reasoning combined with code.

    Achieved whena plant operator publishes months of readings taken by the robot on routine rounds, compared with readings taken by people, with the error rate.

    automationworld.com

    Claimed by

    Boston Dynamics with Google Cloud and Google DeepMind, April 2026

Open

  1. 01

    Swap a gauge by robot

    A robot arm that removes a pressure gauge from a test manifold, wraps the thread of a new gauge with sealing tape, screws it in while holding the fitting steady, and leaves a joint that does not leak.

    The brief
    Credit · unclaimed
  2. 02

    Test the maintenance assistants

    An outside test of the AI assistants sold to plants for maintenance: 300 questions written by technicians about real machines, each with an answer and page number from the maker's public manual, put to every assistant, with each answer scored.

    The brief
    Credit · unclaimed

Open 01 · the brief

Swap a gauge by robot

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A robot arm that removes a pressure gauge from a test manifold, wraps the thread of a new gauge with sealing tape, screws it in while holding the fitting steady, and leaves a joint that does not leak.

Why it is still open

Robots that read gauges were announced in 2026, but a search found no robot that changes one.

automationworld.com

Built with what exists

A collaborative robot arm with a wrist camera and torque sensing, such as a Universal Robots UR5e; open robot models that learn a task from a few demonstrations, such as NVIDIA's GR00T 2 (Notes: "Five demonstrations per task") or Runway's Praxis-1 (Notes: "Open robot model weights"); Hugging Face's LeRobot software to record demonstrations and train (Notes: "No download").

  1. First step

    Build a bench manifold from standard quarter-inch threaded gauge fittings and record twenty demonstrations of the swap through the robot's remote control.

  2. Done looks like

    Twenty filmed attempts on a bench manifold, each new gauge holding 6 bar of water for 10 minutes without a drip, and a published tally of successes, failures and their causes.

Open 02 · the brief

Test the maintenance assistants

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An outside test of the AI assistants sold to plants for maintenance: 300 questions written by technicians about real machines, each with an answer and page number from the maker's public manual, put to every assistant, with each answer scored.

Why it is still open

Published benchmarks test AI models and agent set-ups on public data, not the products plants buy. PHMForge, released in 2026, tests AI agents on 99 scenarios written by subject experts using public datasets. Sellers report their own trials: Ultimo reported no missed safety actions in a trial but did not say how many companies took part, for how long, or how many recommendations were checked.

arxiv.orgitbrief.co.uk

Built with what exists

Public manuals for common pumps, compressors and valves; trial accounts of the assistants under test; a reviewing agent that cites the page behind each finding, such as one built with Cursor's Agent SDK (Notes: "Findings that cite notes").

  1. First step

    Collect the manuals for ten common machines and ask two technicians to write 30 questions each.

  2. Done looks like

    300 questions answered by each assistant; two technicians who do not know which assistant wrote which answer mark each one right or wrong; all questions, answers and scores published.