On-site supply is making gas at or next to the customer's plant, either in a large plant that pipes oxygen or nitrogen straight to a steel mill or refinery, or in a small generator that feeds a factory or a hospital's pipes.
7
Milestones achieved, from 1941 to 2021.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1941
Gas made at the customer
Leonard Parker Pool founded Air Products in Detroit in 1940 on the idea of building oxygen plants at the customer's site and selling the gas they made, and in 1941 the company leased its first oxygen generator to a small Detroit steel company. The model now carries the industry's largest volumes. Linde's annual report for 2025 says it builds on-site plants on or next to customers' sites and pipes the product to them, under contracts that typically run 10 to 20 years, and up to 30, with minimum purchase requirements. Linde put the value of those future minimum purchases, together with plant sales, at about $62 billion at the end of 2025.
Credit
Leonard Parker Pool and Air Products
1950s
Extra liquid from on-site plants
In the 1950s Air Products began what it calls "piggy-backing": building extra liquefaction capacity into on-site plants, so that a plant built for one pipeline customer also makes liquid gas to sell to others. Linde's 2025 annual report says many cryogenic on-site plants still produce liquid for the merchant market, so plants are typically not dedicated to a single customer.
Credit
Air Products
1960
Pressure swing adsorption patented
A patent filed in 1958 and published on 12 July 1960 described passing air through paired beds of an adsorbent, a solid that holds some gases on its surface, at high pressure and cleaning the beds at low pressure. The patent describes making oxygen-enriched air, a nitrogen-rich product and dry air this way. Small oxygen and nitrogen generators still run on this cycle, called pressure swing adsorption (PSA), and Linde lists vacuum PSA among the ways it makes gaseous oxygen and nitrogen on-site.
Credit
Charles W. Skarstrom; Google Patents lists Exxon Research and Engineering Co. as the original assignee
1980
Membranes enter gas separation
A membrane separates gases by letting some pass through a thin wall faster than others. A 2025 review of hollow-fiber membranes says Monsanto commercialized the first gas separation membrane, Prism, in 1980, to recover hydrogen. Dow Chemical's Generon system then used bundles of hollow fibers, with no moving parts, to make a stream of up to 99% nitrogen from compressed air. Linde's 2025 annual report lists membranes among the ways it makes nitrogen and oxygen at customers' sites.
Credit
Monsanto (Prism); Dow Chemical (Generon)
2017
Ceramic membranes meet wear
Air Products and the US Department of Energy spent years developing ion transport membranes (ITM), ceramics that let oxygen ions through at high temperature, to make oxygen without cryogenic distillation. A prototype designed for 5 tons of oxygen a day ran in more than 40 campaigns, a test unit sized for about 100 tons a day ran at Convent, Louisiana, and the aim was a 2,000 ton-a-day development plant by 2020. Air Products' final report to the Department of Energy, in May 2017, found wear in modules taken out of the pilot units and said that, of all factors studied, module life had the biggest effect on plant cost. No public source found says the 2,000 ton-a-day plant was built.
LessonA ceramic separator that works in pilot units still has to last for years at full size, and its service life sets the cost.
Credit
Air Products, with Ceramatec, Penn State and WorleyParsons, under DOE award DE-FE0012065
2017
Plants run from afar
Air Liquide opened a remote operation center at Saint-Priest, near Lyon, to run 22 of its production units in France, which the company called a first for the gases industry. The trade journal CHEManager reported that the center cost €20 million, can stop or restart a site remotely, adjusts each unit's output to customer demand in real time, and watches for the signals that come before a breakdown.
Credit
Air Liquide
2021
PSA plants for hospitals
During the COVID-19 pandemic, governments and donors bought PSA plants so that hospitals could make their own oxygen. On 28 April 2021 India's Prime Minister's Office announced 500 more plants paid for by the PM CARES Fund, on top of 713 already approved, built with technology from India's defense research agency DRDO and its science council CSIR. India's OxyCare system fitted the plants with sensors that report flow, purity, pressure and running hours to a dashboard for officials.
LessonThe Lancet Global Health Commission on medical oxygen security reported in 2025 that one of the most common stories of the pandemic was of new PSA plants never turned on, breaking quickly, or switched off because no one had planned how to pay to run them. It found that running costs can exceed $100,000 a year and make up 80% of a plant's cost over 20 years, so a plant needs a budget for power and repairs as well as for purchase.
Credit
Government of India, DRDO and CSIR
Watch for
AI tied to Linde gains
Linde's chief executive, Sanjiv Lamba, said on the company's first-quarter 2025 earnings call that Linde completed more than 4,000 efficiency projects in the quarter and that about 32% of the improvements were tied to AI and digital tools. In October 2025 he said the company had more than 300 uses for AI. One of them is AI plant control, built with appliedAI, which uses reinforcement learning, a method in which software learns by trial which settings work best, to tune valves and compressor stages, and it was tried on a working Linde air separation unit.
Achieved whenan outside party, such as an auditor or a published study, reports the change in energy use or output on named plants against a baseline.
Claimed by
Linde, May 2025 and October 2025
Open
01
Count idle oxygen plants
A public, plant-by-plant table of the PSA oxygen plants installed in one Indian state's public hospitals during COVID-19, giving the site, size, installation date, whether the plant is producing oxygen today, and the reason if it is idle, with the evidence behind each entry, updated each year.
The briefCredit · unclaimed02
Early warning for PSA plants
A model that reads a small PSA oxygen plant's pressure, flow and purity records and warns ahead of the faults that take such plants out of service, such as wet or worn zeolite (the mineral in the beds that holds back nitrogen), leaking valves and a weakening compressor.
The briefCredit · unclaimed
Open 01 · the brief
Count idle oxygen plants
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public, plant-by-plant table of the PSA oxygen plants installed in one Indian state's public hospitals during COVID-19, giving the site, size, installation date, whether the plant is producing oxygen today, and the reason if it is idle, with the evidence behind each entry, updated each year.
Why it is still open
Counts exist only as totals. India's national audit office, the Comptroller and Auditor General (CAG), found that only 32 of 75 PSA plants supplied to West Bengal through the PM CARES Fund and company donations were working in December 2023. In 2024 a health ministry official, speaking without being named, told IndiaSpend that the states' last drills returned data for 3,005 of India's 4,135 pandemic plants, and that 53% of them worked. OxyCare collects live readings from plant sensors but shows them only to officials. A search found no public list that names each plant and its status.
Built with what exists
Requests under India's Right to Information Act (open to Indian citizens, so an outside team needs a partner) for OxyCare running-hour records from state health departments; government handover notices and tender records; phone calls to hospitals; a language model to pull fields from scanned replies, with a person checking each row (see the Note "Seven more flagged"); a spreadsheet; Zenodo to publish the table with a DOI.
First step
Pick one state, list its plants from government handover notices, and file information requests for OxyCare running hours over the past 12 months.
Done looks like
The status of at least 90% of the plants in the chosen state confirmed, each with a dated source, the share producing oxygen compared with the CAG's or the ministry's total for that state, and the method published.
Open 02 · the brief
Early warning for PSA plants
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A model that reads a small PSA oxygen plant's pressure, flow and purity records and warns ahead of the faults that take such plants out of service, such as wet or worn zeolite (the mineral in the beds that holds back nitrogen), leaking valves and a weakening compressor.
Why it is still open
The Lancet Commission names too few engineers to run and maintain plants as one reason PSA plants fell idle. OxyCare already sends warnings and alert emails when readings cross set limits. In 2023 Seongmin Son trained a deep-learning model to judge how far a PSA plant's adsorbent had degraded, but trained and tested it on data from a simulator, and a 2025 study built a computer model of a PSA oxygen plant that matched a pilot plant, for design rather than fault warning. Searches of Crossref, arXiv and GitHub found no early warning tested on records from working plants.
Built with what exists
The open PSA simulators toPSAil and PSASimulator.jl on GitHub to generate records of plants with faults added; Python with scikit-learn or PyTorch for the model; logged records from at least one working plant, shared by a hospital or a plant maker.
First step
Set up a two-bed oxygen cycle in toPSAil, add a slow loss of zeolite capacity, and record how many cycles pass before purity falls below 90%.
Done looks like
On held-out records from a real plant, the model flags each logged fault before purity falls below 90%, the low end of what PSA plants deliver by the Commission's figures, with the share flagged at least 24 hours ahead and the false alarms per month published along with the code.