Engines and drivetrains

Making the engines, electric motors, batteries, transmissions and tracks or wheels that give a machine its pulling and driving power.

6

Milestones achieved, from 1904 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1904

    Tracks instead of wheels

    On 24 November 1904, in a peat field on Roberts Island near Stockton, California, Benjamin Holt's company gave the first practical demonstration of its track-type tractor, by the account of the American Society of Mechanical Engineers (ASME). A track-type tractor runs on a continuous belt of linked plates instead of wheels. The design was patented and in production by December 1907, and Holt 75 tractors pulled artillery early in World War I. ASME lists the Holt caterpillar tractor as a landmark and says such machines changed farming, logging, construction and road building worldwide.

    inventionandtech.com

    Credit

    Benjamin Holt (1849–1920), Holt Manufacturing Company of Stockton

  2. 1931

    Diesel enters the crawler

    Caterpillar began building the Diesel Sixty, which the Antique Caterpillar Machinery Owners Club calls the very first Caterpillar diesel tractor. Its D9900 engine had been assembled by hand as a prototype on 28 June 1930 in San Leandro, California. Only 157 were built, in 1931 and 1932, but Caterpillar's heritage historian Lee Fosburgh writes that a diesel burned roughly half the fuel of a gasoline engine, and that by the mid-1930s Caterpillar was the world's largest maker of diesel engines.

    acmoc.orgww2.peoriamagazines.com

    Credit

    Caterpillar engineer C. G. A. Rosen, who led the engine work, and chairman C. L. Best, who kept funding it through the Depression

  3. 2004

    Engine and fuel together

    The US Environmental Protection Agency (EPA) set "Tier 4" exhaust limits for diesel engines in construction, farm and mining machines, phased in from the 2008 model year. It estimated that engines meeting them would emit 95% less particulate matter (soot) and 90% less nitrogen oxides. The limits assumed exhaust filters and catalysts, which sulfur damages, so the same rule cut sulfur in nonroad diesel fuel by more than 99%, starting in mid-2007.

    LessonLimits this tight were possible only because the fuel changed too; EPA described the program as regulating "nonroad diesel engines and diesel fuel as a system".

    govinfo.gov

    Credit

    US EPA, final rule published 29 June 2004

  4. 2016

    Europe counts exhaust particles

    Regulation (EU) 2016/1628, known as Stage V, set exhaust limits for engines in non-road mobile machinery sold in the EU. Most engines placed on the market from 1 January 2019 had to meet it, and engines of 56 to 130 kW from 1 January 2020. It added a limit on the number of exhaust particles, set, in the regulation's words, to reflect "the highest levels of performance currently achieved with particle filters".

    eur-lex.europa.eu

    Credit

    European Parliament and Council, 14 September 2016

  5. 2021

    Real work runs light

    The California Air Resources Board (CARB) logged 35 working construction machines with Tier 3 and Tier 4 engines, model years 2008 to 2018, once a second for at least four weeks each, and called it the largest such dataset for construction equipment. On average, 63% of engine activity was below 20% load. The average load was about 19%, against about 37% on the Nonroad Transient Cycle, the laboratory test that engines are certified on. In a related test of a John Deere 6.8-liter engine with filter and catalyst, nitrogen oxide emissions over a low-load cycle "could be several times higher than the standard".

    LessonCARB found that the certification test "does not sufficiently represent the low load conditions" of real work, and began assessing an added low-load test.

    ww2.arb.ca.gov

    Credit

    CARB staff, presentation of 3 November 2021

  6. 2025

    China's loaders go electric

    Electric wheel loaders rose from 1.1% of loader sales in China in the first quarter of 2023 to 12.4% in the second quarter of 2024 and 17.1% in the first quarter of 2025, while electric excavators were 0.08% of excavator sales in early 2025. By the end of 2024 nearly 200 zero-emission construction machine models were on offer in China, led by XCMG (33 models), SANY (21), LiuGong (18), Shantui (15) and SDLG (14); 65% ran on batteries and 20% drew power through a cable.

    LessonElectric drive spread in one machine type first, not across the range; the ICCT links fast uptake to machines with versatile uses, workable charging and a clear cost case.

    theicct.org

    Credit

    Chinese makers led by XCMG, SANY, LiuGong, Shantui and SDLG; figures from Jinjian Li, Hui He, Zhenying Shao and Yifei Ma of the International Council on Clean Transportation (ICCT), September 2025

Watch for

  1. JCB's hydrogen backhoe

    JCB built a 55 kW engine that burns hydrogen instead of diesel. In May 2025 it received EU type-approval, a certificate under Regulation (EU) 2016/1628 that lets the engine be sold for machines in all 27 EU states. On 12 May 2026 JCB launched its first production 3CX Hydrogen backhoe loader. JCB says it matches the diesel model's power and torque, carries enough hydrogen in three 350-bar roof tanks for all-day work, and that more than 150 hydrogen engines were built during testing. In October 2025 the contractor Skanska put one to survey work on the Lower Thames Crossing road project in England, which National Highways described as the first use of such a machine outside a test environment.

    Achieved whencustomers who bought the machines, or an outside body, publish hours worked, hydrogen used per hour and running costs over a full year of routine work.

    jcb.comconstructionbriefing.compowerprogress.com

    Claimed by

    JCB, May 2026

Open

  1. 01

    Open duty cycles for batteries

    A public library of real working days for diesel and electric construction machines, logged once a second: engine or motor speed and load, fuel or battery use, and what the machine was doing. With it, a calculator that tells a maker or buyer what share of those days a battery of a given size (in kWh) would last.

    The brief
    Credit · unclaimed
  2. 02

    Charging plans checked against meters

    An open planner that takes a job's list of electric machines and its work schedule and predicts the site's daily energy use (kWh) and peak power draw from the grid (kW), using the makers' published battery and charger ratings. Then a published comparison of its predictions with meter readings from finished sites.

    The brief
    Credit · unclaimed

Open 01 · the brief

Open duty cycles for batteries

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public library of real working days for diesel and electric construction machines, logged once a second: engine or motor speed and load, fuel or battery use, and what the machine was doing. With it, a calculator that tells a maker or buyer what share of those days a battery of a given size (in kWh) would last.

Why it is still open

Battery size is the main design choice for an electric machine, and the public data for choosing it is thin. The EPA publishes one "nonregulatory" duty cycle per machine type, scaled to 0–100% of speed and torque, from field data whose draft dates to August 1999. CARB logged 35 machines once a second for at least four weeks each in 2021, but only a summary was found in public. The nearest open data is short or from other machines: Tampere University researchers published 440 seconds of one 6-tonne wheel loader loading gravel (Linjama and colleagues, Zenodo, 2024), and the Technical University of Munich published 354 hours of fieldwork logged on five Fendt farm tractors in 2024 (Götz and colleagues, Data in Brief, 2025). A 2025 paper that builds a load profile generator for such machines simulates the profiles instead, and checked them only for a material handler and a forest forwarder. Searches of GitHub, Crossref, Zenodo and the web in November 2026 found no open set of multi-week logs for excavators or loaders.

epa.govww2.arb.ca.govzenodo.orgpmc.ncbi.nlm.nih.govarxiv.org

Built with what exists

CSS Electronics' CANedge loggers, which record the J1939 data network that diesel machines use (by the maker's case study, JCB engineers use them on wheel loaders and excavators); the open-source asammdf and python-can libraries with a J1939 decoding file; Python and pandas for the calculator.

csselectronics.com

  1. First step

    Ask one rental company to fit loggers to two machines out on hire for a month, with the hirers' consent.

  2. Done looks like

    At least 2,000 machine-hours from at least 30 machines of five types (mini excavator, 20-tonne excavator, wheel loader, skid steer, backhoe loader), released under an open license. On at least one electric machine over 20 working days, the calculator's predicted end-of-day battery level is within 10 percentage points of the logged level.

Open 02 · the brief

Charging plans checked against meters

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open planner that takes a job's list of electric machines and its work schedule and predicts the site's daily energy use (kWh) and peak power draw from the grid (kW), using the makers' published battery and charger ratings. Then a published comparison of its predictions with meter readings from finished sites.

Why it is still open

The City of Oslo, which requires zero-emission municipal building sites, says grid capacity can decide whether such a site works. Its 2026 guidance gives only rough figures from past projects: about 100 kW for one or two machines, about 250 kW for a medium project and about 500 kW where several large machines fast-charge at once, and calls them "a preliminary indication only". Planners exist on paper: Frank Kuipers and Rick Wolbertus of the Amsterdam University of Applied Sciences estimated energy demand and simulated charging for a housing project in The Hague, and found that smart charging and site batteries could cut peak grid load by up to 46% (June 2025). That result is a simulation. Searches in November 2026 found guidance documents, simulations and vendor case studies, but no published test of a planner's predictions against metered site data.

klimaoslo.noresearch.hva.nl

Built with what exists

Makers' published battery capacities and charger ratings; the duty-cycle library above; Python and pandas; a simple simulation of machines queuing for chargers.

  1. First step

    Ask the City of Oslo's zero-emission construction program for the machine lists and meter data of two finished municipal sites.

  2. Done looks like

    Predictions for at least 10 finished electric sites, published beside their meter data, with peak power within 20% and daily energy within 15% of the metered values on at least 8 of them.