Industries / Industrial equipment and services / Industrial services / Heat exchanger services
Gaskets and bolting
Closing an exchanger's bolted joints after work, with new gaskets and bolts tightened to a set load, so the joints stay tight through heating and cooling.
7
Milestones achieved, from 1912 to 2023.
2
To watch for: announced, not yet confirmed outside.
3
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1912
Metal and filler wound together
A spiral wound gasket is made of alternating plies of metal strip and soft filler wound in a spiral, which held higher pressures than earlier gaskets. Flexitallic says it invented the design in 1912 in Trenton, New Jersey, for marine steam engines. Engineers at Teadit, a rival maker, also date it to 1912, and say inner rings against buckling followed in the 1940s and PTFE and graphite fillers in the 1960s.
Credit
Flexitallic Gasket Company
2000
A guide to bolting up
The American Society of Mechanical Engineers (ASME) published PCC-1, guidelines for assembling bolted flange joints on pressure vessels and piping, in 2000. Leaks that a small change in assembly would have prevented, some of which injured people, led to a much expanded 2010 edition: it advised against reusing gaskets, set flatness limits for the faces a gasket seats on, and added a checklist and a sample report for investigating a leaking joint.
Credit
ASME Post Construction Committee
2002
A gasket seated badly
On 17 November 2002, at a refinery at Grandpuits in Seine-et-Marne, France, a reboiler, the exchanger that boils liquid at the foot of a column, leaked at its main joint while carrying gasoline, fuel gases and hydrogen at 440 °C and 25 bar. The leak lit itself and threw a flame about 10 m long. France's accident database records €4.3 million of damage and a first finding, pending a judicial inquiry, that the gasket housing had been poorly positioned at the last gasket change, leaving part of its circumference unsealed.
Lessonthe operator then checked every exchanger of the same type, since a fitting fault on one joint can repeat across a fleet.
Credit
ARIA database, French Ministry of Ecological Transition
2007
A register of opened joints
Guidelines published in 2007 by the UK's Energy Institute recommend a management system for bolted joints from construction through their working life, including a register of every joint disturbed during maintenance. A 2022 paper for IChemE counted 97 releases from flanges among the 773 hydrocarbon releases reported on UK offshore installations during reinstatement or start-up between 1992 and 2015.
Credit
Energy Institute
2013
Bolting technicians certified
The European standard EN 1591-4, published in August 2013, sets a modular training syllabus and an assessment for the technicians, supervisors and engineers who take apart, assemble and tighten bolted joints on critical pressure equipment, with higher levels open once the foundation level is passed. Certification attests general competence; the employer still decides who may do the work.
Credit
European Committee for Standardization (CEN)
2021
A rain shield left off
On 20 August 2021, at a Japanese refinery, gas containing hydrogen leaked from the main flange of a heat exchanger and caught fire on the hot metal. After a shutdown, the startup team had removed the flange's rain shield to retighten the bolts while hot, and did not refit it, because that step was not on the checklist. About two months of heavy rain cooled and reheated the bolts until they lost load.
Lessonweather covers on hot joints are safety equipment and belong on the startup checklist.
Credit
KHK's incident report, summarized in the EU's Hydrogen Incidents and Accidents Database (HIAD)
2023
Wrong bolt sizes, years later
On 21 January 2023, during startup, 30 lb (about 14 kg) of hydrogen leaked from the flange between the channel and the shell of a heat exchanger at CITGO's refinery in Sulphur, Louisiana, caught fire and caused more than $1.5 million in damage. The joint was assembled in 2013 and had gone through 43 heating and cooling cycles. Its bolts had been tightened too little, because the assembly instructions for it and a similar exchanger nearby listed the wrong bolt sizes.
Lessona wrong figure on an assembly sheet can sit unnoticed through a decade of startups.
Credit
CITGO's investigation, reported by the US Chemical Safety Board (CSB)
Watch for
Robots that bolt flanges
Nexterity, a US start-up, described a hands-free bolting robot guided by machine vision for piping joints, designed around safety, speed and quality after a survey of more than 75 industry leaders. Separately, Lorenzo Pagliara and colleagues reported a robot bolting system that handles faults and hands control between robot and operator, tested on a pipe flange in a laboratory.
Achieved whena robot assembles a heat exchanger channel or main flange in a working plant, and someone other than its maker measures every bolt load within the target band.
Claimed by
Nexterity, Inc., at ASME's 2025 Pressure Vessels and Piping Conference; Pagliara and colleagues, November 2025
Bolts that report their load
Muhammad Abdullah, Mohd Hafizi Zohari and Ihsan Naiman Ibrahim of Universiti Malaysia Pahang Al-Sultan Abdullah embedded optical strain sensors, fiber Bragg gratings, in four M18 bolts and found a near-linear link between tightening torque and sensor signal from 10 to 80 N·m at room temperature (R² from 0.94 to 0.97).
Achieved whensuch bolts keep their calibration through repeated heating and cooling on an exchanger flange, and another laboratory repeats the result.
Claimed by
the authors, May 2026
Open
01
Check the bolting sheet
A checker that reads a bolted-joint assembly sheet for an exchanger joint (bolt size and count, gasket type, lubricant, torque or tensioner pressure, tightening passes) and compares it with the joint's drawing and a recalculated target bolt load, flagging mismatches such as a wrong bolt size, wrong units or a pressure setting for the wrong tool.
The briefCredit · unclaimed02
Exchanger joint leaks, counted
A public table of leaks from heat exchanger bolted joints, coded by joint (channel cover, channel to shell, floating head, nozzle), phase (startup, steam-out, normal running, shutdown), cause (bolt load too low, thermal cycling, gasket type or seating, weather) and consequence, drawn from the CSB's incident reports, HIAD, ARIA, KHK, Technical Safety BC and published case studies.
The briefCredit · unclaimed03
Photos of failed gaskets
An open set of photographs of gaskets taken out of heat exchanger joints at turnarounds (spiral wound, kammprofile and double-jacketed types), each labeled with the damage seen, such as crushed or buckled windings, radial cuts, erosion or uneven compression around the ring, and with the joint's history where known, plus a baseline model that names the damage from a photo.
The briefCredit · unclaimed
Open 01 · the brief
Check the bolting sheet
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A checker that reads a bolted-joint assembly sheet for an exchanger joint (bolt size and count, gasket type, lubricant, torque or tensioner pressure, tightening passes) and compares it with the joint's drawing and a recalculated target bolt load, flagging mismatches such as a wrong bolt size, wrong units or a pressure setting for the wrong tool.
Why it is still open
CITGO's 2023 hydrogen fire traced back to assembly instructions that listed the wrong bolt sizes. Software such as Hi-Force's Boltright Pro (2016) calculates torque or tension from joint data a user types in, and Petronas described an end-to-end digital program for flange integrity in 2022, but these produce new instructions. A September 2026 GitHub tool reads photos of handwritten field torque tags with Claude and checks them against a company's QC rules, which checks the record of the work, not the instructions against the drawing. No tool or public test was found that audits existing sheets against drawings and reports how many planted errors it catches.
Built with what exists
Python; the bolt-load selection method in ASME PCC-1 Appendix O (sold by ASME) or EN 1591-1; a model that reads scanned sheets, such as Claude Fable 5.2 (Notes: "Three working devices"); a spreadsheet of standard flange and bolt dimensions.
First step
Write 20 assembly sheets for common exchanger flange sizes, plant six errors of the CITGO kind, and test whether a simple rule-based script catches them.
Done looks like
On 100 assembly sheets for exchanger joints with 30 planted errors, the checker flags at least 27 errors with no more than 5 false alarms, and the result is compared with two bolting engineers reviewing the same sheets blind.
Open 02 · the brief
Exchanger joint leaks, counted
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of leaks from heat exchanger bolted joints, coded by joint (channel cover, channel to shell, floating head, nozzle), phase (startup, steam-out, normal running, shutdown), cause (bolt load too low, thermal cycling, gasket type or seating, weather) and consequence, drawn from the CSB's incident reports, HIAD, ARIA, KHK, Technical Safety BC and published case studies.
Why it is still open
The UK's offshore release data count flanges in general, 97 of 773 releases during reinstatement or start-up from 1992 to 2015, without separating exchanger joints. Exchanger cases sit in separate national databases with their own categories, and the published studies are single cases, such as a 2024 analysis of repeated channel-flange leaks on one kettle exchanger.
Built with what exists
Python and pandas; machine translation for KHK's Japanese and ARIA's French reports; a language model to propose codes, each checked by a person; a published codebook.
First step
Pull every heat exchanger case from the CSB's published incident report volumes and from HIAD, and code the first 20 by hand to settle the categories.
Done looks like
At least 150 exchanger joint leaks coded from at least five sources, two people coding 40 of them independently and agreeing on at least 90% of codes, and a published breakdown of leaks by phase and cause.
Open 03 · the brief
Photos of failed gaskets
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open set of photographs of gaskets taken out of heat exchanger joints at turnarounds (spiral wound, kammprofile and double-jacketed types), each labeled with the damage seen, such as crushed or buckled windings, radial cuts, erosion or uneven compression around the ring, and with the joint's history where known, plus a baseline model that names the damage from a photo.
Why it is still open
ASME's leak-troubleshooting guidance, added in 2010, relies on examining the gasket after the joint is opened, but the public gasket image sets found are for production-line checks, such as misfitted radiator gaskets in a 2025 Scientific Reports paper and small Roboflow projects; none of used industrial gaskets was found.
Built with what exists
A phone camera with a ring light and a scale bar; CVAT for labeling; an Ultralytics YOLO or other fine-tuned vision model; only gaskets the site has cleaned and released as scrap.
First step
Ask one gasket supplier or maintenance contractor for 50 scrapped exchanger gaskets, photograph them under one lighting setup, and draft the damage labels with a sealing engineer.
Done looks like
1,000 gaskets photographed from at least three sites, each labeled by two people with their agreement reported, and the model's accuracy on 200 held-out photos published for each damage type.