Geotechnical engineering
Geotechnical engineering finds out what the ground under a site is made of and how it will behave, then designs the foundations, slopes, walls and ground treatments that let structures stand on it.
1922
On 31 May 1922 the Swedish State Railways' Geotechnical Commission, set up after a run of landslides along the main lines, delivered its final report; Rainer Massarsch and Bengt Fellenius call it "the first publication ever using the word 'geotechnical'", and the Swedish Geotechnical Society says the commission coined the term.
40
Milestones achieved across 7 domains.
9
To watch for: announced, not yet confirmed outside.
14
Open deliverables. Nobody has shipped them.
In one minute
Where it started
The field grew out of failures on soft clay: after repeated landslides on its main lines, the Swedish State Railways set up a Geotechnical Commission, whose 1922 report gave the field its name, and Swedish engineers of the time produced the slip circle for slope stability, the fall cone and vane for clay strength, and the piston sampler. Karl Terzaghi's 1925 book turned soil mechanics into a science, and the first international conference on it met at Harvard in 1936 with 206 delegates from 20 countries.
Where it stands
The International Society for Soil Mechanics and Geotechnical Engineering counted 93 member societies and 21,021 individual members in 2026, up from 32 societies and 2,500 members in 1957. Probes pushed or hammered into the ground, slope and pile programs that descend from methods of the 1950s and 1960s, and ground treatments such as vibro compaction, wick drains and deep mixing are routine worldwide, and free satellite radar now maps ground movement across all of Europe. Failures still teach the field: Singapore's Nicoll Highway collapse in 2004 turned on wrong instrument readings, and San Francisco's Millennium Tower needed new piles to bedrock after it settled and tilted.
What is open
Much of the work is still judged by eye or kept in private files: how far a test hammer really fell, what a soil sample should be called, when the groove in a liquid limit test has closed, what a pile's echo means, and which old foundations have been reused and how they performed. The open jobs here mostly measure those things with cameras and image models, pool scattered records into open sets with fixed scoring, and test AI agents on the free worked examples engineers learn from. Several are desk work: shared scoreboards for liquefaction models and for slope failure forecasts, and a reader that turns decades of earthquake reports into case histories.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Drilling and sampling
Drilling and sampling is the field work of boring into the ground, pushing probes through it and bringing up pieces of soil, so that engineers know what lies under a site and how strong it is.
5 · 2 · 2
Last achievedOne format for ground data1992
Watch forA probe that pushes sideways
2
openLab testing
Lab testing measures soil samples brought in from site, such as how wet they are, how coarse or fine their grains are, how they behave as they get wetter, and how strong and how compressible they are, by set procedures so that results from different laboratories can be compared.
5 · 1 · 2
Last achievedFifteen labs, one soil2021
Watch forRobots pour sand samples
2
openFoundations
Foundation work chooses and checks what carries a structure's weight into the ground, from a concrete raft spread under a building to piles driven or drilled down to firmer layers.
6 · 1 · 2
Last achievedA tower settles and leans2016
Watch forGrouted screw pile load record
2
openSlopes and retaining walls
This work keeps hillsides, cuttings and embankments from sliding, and designs the walls that hold soil back where the ground changes level.
6 · 1 · 2
Last achievedOso outruns its own history2014
Watch forDrones inspect barriers under trees
2
openGround improvement
Ground improvement makes weak ground stronger, denser or quicker to settle before anything is built on it, by draining, shaking, pounding, grouting or mixing it.
7 · 1 · 2
Last achievedChemical grout poisons water1974
Watch forGas and calcite under dikes
2
openMonitoring
Monitoring puts instruments in the ground and on the structures built in it, to measure movement, water pressure and load, so engineers can see whether the ground behaves as the design assumed.
5 · 1 · 2
Last achievedVillage emptied before the collapse2025
Watch forL-band radar saw Blatten coming
2
openEarthquakes and liquefaction
This work predicts how the ground will behave in an earthquake and designs against it, including liquefaction, in which shaking turns loose, waterlogged sand into something close to a liquid.
6 · 2 · 2
Last achievedLiquefaction data goes public2020
Watch forA design target for liquefaction
2
open
Advances to build with
2 research notes

Mistral Large 4
A trillion open parameters
Mistral published its Large 4 AI model, a trillion numbers by its count, free to download and sell, though firms that rent out models need a separate license.

Cursor Agent SDK
Findings that cite notes
Cursor released a kit for building AI agents, and its example, a code reviewer that cites the note behind each finding, is known only from Cursor's account.
Open in geotechnical engineering
3 of 14 open deliverables
Open · Drilling and sampling
Drop height from phone video
A phone app that films a standard penetration test and measures, from the video alone, the height of every hammer drop and the number of blows, then reports how far each test strayed from the standard 76 cm (30 in) drop.
Built with what exists
A phone filming at 240 frames per second; a printed scale target clamped beside the guide pipe; open-source tracking with OpenCV; a small image model to mark each blow.
Open · Lab testing
A camera judges the cup
A camera system that watches the Casagrande cup test and decides, from the video, the blow at which the groove has closed along 13 mm (0.5 in), the point a technician now judges by eye.
Built with what exists
A phone or USB camera fixed above a motorized cup; OpenCV to find the groove; a small image model trained on frames that people have labeled.
Open · Foundations
Pile echo tests, ground-truthed
A public set of low-strain pile integrity tests, in which a tester taps the top of a finished concrete pile with a hand-held hammer and an accelerometer records the echo, each labelled with what was later found in that pile by coring, excavation or cross-hole sonic logging. Add a baseline model that reads the echo traces and scores it on the set.
Built with what exists
Field records from testing firms or highway agencies; Python with scikit-learn or PyTorch; the 2026 study's recurrent neural network as a baseline.