BRENNEN

Industries / Industrial equipment and services / Industrial machinery / Generators

Fuel and emissions

This work covers what generators burn, such as diesel, natural gas, renewable diesel and hydrogen, how the fuel reaches the engine, and how makers and regulators limit what comes out of the exhaust.

6

Milestones achieved, from 2004 to 2026.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 2004

    Diesel limits force exhaust cleanup

    The US Environmental Protection Agency's Tier 4 rule for off-road diesel engines, published on 29 June 2004, set limits phased in from 2008 to 2015 and capped sulfur in off-road diesel at 500 parts per million from 2007 and 15 from 2010. DieselNet reports that most Tier 4 engines meet it with selective catalytic reduction (SCR, which sprays a urea solution into the exhaust to turn nitrogen oxides into nitrogen and water), some with a diesel particulate filter (DPF, a ceramic soot trap), and lists portable generators among the machines covered.

    LessonThe engine limits worked only because the fuel changed too, since sulfur damages the catalysts.

    govinfo.govdieselnet.com

    Credit

    US EPA

  2. 2006

    Standby engines get a carve-out

    EPA's standard for fixed diesel engines, 40 CFR 60 Subpart IIII, became final on 11 July 2006. Emergency engines of 37 kW and above need only meet the older Tier 2 or Tier 3 limits, not Tier 4, if the owner runs them no more than 100 hours a year for maintenance and testing, of which up to 50 may be other use; running in a real emergency is not limited.

    LessonIn the US most standby diesels have no SCR or filter, so their exhaust is far dirtier per hour than a Tier 4 engine's.

    epa.govlaw.cornell.edu

    Credit

    US EPA

  3. 2012

    Sandy floods the fuel pumps

    In Hurricane Sandy, Bellevue Hospital in New York had generators on the 13th floor but the pumps that fed them fuel in the basement, which flooded; for 13 hours staff carried fuel up in 5-gallon cans, FEMA reports. At NYU Langone water reached the fuel vault and sensors shut the generators down, CBS News reported, and about 300 patients were moved out.

    LessonA generator is only as reliable as its fuel supply, and pumps and tanks need the same flood protection as the engine.

    fema.govcbsnews.com

    Credit

    FEMA and CBS News reporting

  4. 2016

    Europe requires particle filters

    EU Regulation 2016/1628, Stage V for off-road engines, caps the number of particles at 1×10¹² per kWh for diesel engines of 19 to 560 kW, which DieselNet says requires a DPF on all of them, from 2019 or 2020 by size. Engines above 560 kW in generator sets form their own class with mass limits, such as 0.67 g/kWh of nitrogen oxides, but no particle-number limit.

    dieselnet.com

    Credit

    European Parliament and Council

  5. 2022

    Renewable diesel enters the tank

    In July 2021 Kao Data said it had moved the backup generators at its Harlow, UK, campus to HVO (hydrotreated vegetable oil, a renewable diesel made from waste fats). On 11 May 2022 Rolls-Royce Power Systems approved its mtu Series 1600 and 4000 generator sets for synthetic diesel to EN 15940, including HVO, with no engine changes, and reported up to 80% less particulate and on average 8% less nitrogen oxides than fossil diesel.

    intelligentcio.comrolls-royce.com

    Credit

    Kao Data and Crown Oil; Rolls-Royce Power Systems

  6. 2026

    Virginia requires cleanup on standby

    Under HB 507, Virginia's environment department may not issue an air permit for a data centre applied for on or after 1 July 2026 unless each generator meets limits at or below those of a Tier 4-equivalent unit: SCR or equivalent for nitrogen oxides, an oxidation catalyst for carbon monoxide and a DPF for soot. The implementing regulations took effect on 4 November 2026, law firm Williams Mullen reports.

    LessonOnce standby fleets grew to thousands of engines in one region, the federal low-hours carve-out stopped satisfying local regulators.

    williamsmullen.com

    Credit

    Virginia General Assembly and State Air Pollution Control Board

Watch for

  1. Hydrogen engine for data-centre backup

    INNIO and the Net Zero Innovation Hub for Data Centers, whose partners include Data4, Google, Microsoft, Schneider Electric and Vertiv, say a Jenbacher gas engine in a 3 MW-class backup system ran on 100% hydrogen at INNIO's research site through data-centre load profiles, including rapid, large load changes. They call it a first for the industry.

    Achieved whena hydrogen-fuelled engine generator serves as backup at an operating data centre and the operator or a third party reports its starts and load steps.

    mynewsdesk.com

    Claimed by

    INNIO and the Net Zero Innovation Hub, April 2026

  2. Renewable diesel spreads to Asia

    Bridge Data Centres and EcoCeres say a pilot of waste-based HVO in backup generators at Bridge's Asia Pacific campuses covered starting, load transfer and sustained running and met all performance and emissions targets. They gave no figures.

    Achieved whenan Asia Pacific operator runs a whole site's backup fleet on HVO and publishes measured emissions.

    decarbonfuse.com

    Claimed by

    Bridge Data Centres and EcoCeres, May 2026

Open

  1. 01

    Cheap grading of stored diesel

    A low-cost kit and model that grades diesel sitting in a standby tank as good, watch or replace, from cheap readings (a near-infrared spectrometer, water content, colour, particle count), trained against lab results from the standard tests ASTM D6468 (heat the fuel to 150 °C, then rate the residue on a filter) and ASTM D2276 (particulate contamination).

    The brief
    Credit · unclaimed
  2. 02

    Open register of standby generators

    A public, downloadable database of permitted standby generators drawn from air permits: site, owner, engine count, kW, fuel, emission tier, aftertreatment, permitted hours and, where obtainable, actual run hours from operating logs. Start with Virginia, then other states that post permits.

    The brief
    Credit · unclaimed

Open 01 · the brief

Cheap grading of stored diesel

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A low-cost kit and model that grades diesel sitting in a standby tank as good, watch or replace, from cheap readings (a near-infrared spectrometer, water content, colour, particle count), trained against lab results from the standard tests ASTM D6468 (heat the fuel to 150 °C, then rate the residue on a filter) and ASTM D2276 (particulate contamination).

Why it is still open

NFPA 110 requires stored fuel to be tested at least once a year to ASTM methods, which is still done by sending samples to a lab. A 2025 Université de Lille thesis found near-infrared spectra with a machine-learning model predicted the oxidation stability of jet fuel with "low accuracy", using a different test. Searches of papers and products found online particle counters and water sensors but no open data set linking cheap readings to D6468 or D2276 results for aged diesel.

pepite-depot.univ-lille.frssr-cfm-articles.blogspot.com

Built with what exists

A hobby-grade spectral sensor such as the AS7265x or a NeoSpectra module; a Raspberry Pi; Karl Fischer water results from a commercial fuel lab; Python with scikit-learn.

  1. First step

    Ask a generator service firm to let you take a sensor reading of each fuel sample before it ships to the lab, and to share the lab report afterwards.

  2. Done looks like

    An open data set of at least 100 tank samples with paired sensor and lab readings, and a model that matches the lab's pass or fail call on at least 90% of held-out samples.

Open 02 · the brief

Open register of standby generators

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public, downloadable database of permitted standby generators drawn from air permits: site, owner, engine count, kW, fuel, emission tier, aftertreatment, permitted hours and, where obtainable, actual run hours from operating logs. Start with Virginia, then other states that post permits.

Why it is still open

Virginia's environment department began posting data-centre air permits in November 2024 and says they are hard to pull out by industry. Technical.ly analysed 195 Virginia permit applications in September 2026 and counted more than 13,500 generators, but was quoted 2,239.48 US dollars for the operating records and does not say it got them. Web and GitHub searches in November 2026 found no open, machine-readable data set comparing permitted and actual run hours.

technical.lyvirginiamercury.com

Built with what exists

Python; pdfplumber, or OCR for scanned permits; an AI model to pull fields from long permit documents, checked by hand on a sample (the Note "Seven more flagged" covers an AI reviewer of long documents); CSV or GeoJSON on GitHub or Zenodo.

  1. First step

    Download the permit list, code 20 permits by hand to fix the record format, and file one public-records request for run-hour logs.

  2. Done looks like

    Every data-centre permit on the Virginia DEQ page parsed into a public file, with at least 95% field accuracy on a 50-permit hand-checked sample, and actual run hours for at least 20 sites.