Controls and switching

This work covers the governor, voltage regulator, genset controller, paralleling gear and automatic transfer switch that start a generator, hold its speed and voltage, and connect it to the load when mains power fails.

5

Milestones achieved, from 1870 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1870

    A governor for water wheels

    Amos W. Woodward of Rockford, Illinois, received US Patent 103,813 for spinning weights that drop when a water wheel slows and, through gearing, open or close the water gate so the wheel holds its speed as demand changes. The company he founded, Woodward, still makes speed governors and controllers for engine-generators.

    patents.google.comencyclopedia.com

    Credit

    Amos W. Woodward

  2. 1925

    The automatic transfer switch

    An automatic transfer switch moves a building's load from mains power to a backup source with no one acting. ASCO, now part of Schneider Electric, lists 1925 as the year of the "Industry's first Automatic Transfer Switch" and 1940 as the year the first building, the Industrial Trust Building in Providence, Rhode Island, installed them. Both firsts are ASCO's own claims.

    se.com

    Credit

    Automatic Switch Company (ASCO)

  3. 1985

    A standard for emergency power

    The National Fire Protection Association set up a committee on emergency power in 1976, and its standard, NFPA 110, became the 1985 edition. Under the US National Electrical Code, Section 700.12, emergency power must be available within 10 seconds of a mains failure, which in practice means a generator that starts by itself and an automatic transfer switch.

    csemag.comecmweb.com

    Credit

    NFPA technical committee on emergency power

  4. 2021

    Frozen sensing lines stop generators

    In the February 2021 freeze in Texas and the south-central US, 1,045 generating units had outages, cuts in output or failures to start, and 210 people died. A sensing line is a small water-filled tube that carries pressure to an instrument the control system reads. The federal staff report found that, apart from iced wind-turbine blades, frozen transmitters and sensing lines caused most freeze-related outages; in one case a single frozen line cut a 932 MW coal unit to 360 MW.

    LessonThe same frozen parts had been named in reports after cold snaps in 2011 and 2018.

    nerc.com

    Credit

    FERC, NERC and Regional Entity joint staff, November 2021

  5. 2024

    Generator gateways get security advisories

    The Deep Sea Electronics DSE855 is a network add-on for watching a Deep Sea genset controller remotely. Researchers found that anyone on the local network could download its settings, including stored passwords, without logging in, and could reset or crash it; the US cyber agency CISA published advisory ICSA-24-298-03 in October 2024.

    LessonThe flaws were published before a fix because the vendor missed the researchers' 120-day window.

    cisa.govthezdi.com

    Credit

    Gjoko Krstic (Zero Science Lab) and Dmitry Janushkevich (Zero Day Initiative)

Watch for

  1. Grid calls on backup generators

    Ahead of Winter Storm Fern the US Department of Energy said "more than 35 GW of unused backup generation remains available nationwide" and issued emergency orders under Section 202(c) of the Federal Power Act. The order for PJM, the mid-Atlantic grid operator, let it direct backup generators at data centres and other large customers to run as a last resort.

    Achieved whena grid operator dispatches customer backup generators and an outside party reports how many megawatts came on and how fast.

    energy.govenergy.gov

    Claimed by

    US Department of Energy, January 2026

  2. One controller for data-centre fleets

    Rehlko, formerly Kohler Energy, announced the APM804, a single controller for its KD Series generator sets of 700 to 4,000 kW, from one set up to systems that run in parallel with the grid. The release gives no measured figures.

    Achieved whensites outside Rehlko report the controller in service with measured start and paralleling times.

    singaporetechnologyweek.com

    Claimed by

    Rehlko, May 2026

Open

  1. 01

    Open security bench for controllers

    A test bench anyone can rerun. One part is a software stand-in for a genset controller that answers on Modbus, a simple register protocol used by monitoring systems, and J1939, the CAN bus protocol engines use to report speed, oil pressure and faults. The other is a set of scripted checks, such as whether an unauthenticated client can write the remote-start register or download the settings file. The same checks run against one cheap real controller on a 12 V DC bench supply, with no engine or mains connected.

    The brief
    Credit · unclaimed
  2. 02

    Pooled generator start times

    A shared, anonymised table of real start and transfer events from home and small-business standby generators: outage or exercise start, engine start, ready, transfer and any alarms. The data comes from owners who already run genmon, open-source software that reads controller logs over Modbus from Generac, Kohler, Briggs & Stratton, ComAp, Deep Sea and SmartGen controllers. Contributors export logs they already have, and nobody opens an enclosure.

    The brief
    Credit · unclaimed

Open 01 · the brief

Open security bench for controllers

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A test bench anyone can rerun. One part is a software stand-in for a genset controller that answers on Modbus, a simple register protocol used by monitoring systems, and J1939, the CAN bus protocol engines use to report speed, oil pressure and faults. The other is a set of scripted checks, such as whether an unauthenticated client can write the remote-start register or download the settings file. The same checks run against one cheap real controller on a 12 V DC bench supply, with no engine or mains connected.

Why it is still open

The DSE855 flaws were found by hand by individual researchers. Conpot, an open decoy that imitates industrial equipment, speaks Modbus but has no genset template and no J1939. GitHub searches for genset simulators and generator controller Modbus tools in November 2026 found hobby simulators and single-brand readers, and no scripted security bench.

conpot.readthedocs.iothezdi.com

Built with what exists

Python with pymodbus and python-can; Linux virtual CAN and can-utils; Conpot as a base; a used entry-level controller such as a SmartGen HGM unit; a 12 V bench supply; a USB-CAN adapter.

  1. First step

    Write the emulator's register map from one controller's public Modbus manual, serve it with pymodbus and confirm a standard client can read engine speed.

  2. Done looks like

    A public repository with an emulator and at least 20 checks that run in one command, results for the emulator and for at least one real controller, and any flaws reported to the vendor first.

Open 02 · the brief

Pooled generator start times

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A shared, anonymised table of real start and transfer events from home and small-business standby generators: outage or exercise start, engine start, ready, transfer and any alarms. The data comes from owners who already run genmon, open-source software that reads controller logs over Modbus from Generac, Kohler, Briggs & Stratton, ComAp, Deep Sea and SmartGen controllers. Contributors export logs they already have, and nobody opens an enclosure.

Why it is still open

genmon keeps each owner's logs on their own device and nobody pools them. Zenodo searches in November 2026 for transfer switch timing and standby generator starts found design papers and no shared timing data.

github.com

Built with what exists

genmon (Python, GPL-2.0) and its log export; a short Python script to convert logs to one table and strip location; Zenodo for hosting with a DOI.

  1. First step

    Draft the schema and the anonymising script, and ask for volunteers in genmon's GitHub discussions.

  2. Done looks like

    At least 500 start events from at least 30 sites and 3 controller brands, with the spread of start-to-ready times and the share of failed starts by brand and season.