Industries / Construction and property / Commercial and residential construction / Fencing
Posts and installation
Posts and installation is the work of getting buried lines marked, digging or driving the posts, and setting them straight and deep enough to hold the fence.
4
Milestones achieved, from 1877 to 2026.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1877
Hinged diggers already common
Thomas S. Disston of Philadelphia patented a post-hole digger on 29 May 1877, assigned to the saw makers Henry Disston & Sons, with three or more hinged blades opened and closed by one lever on a single stem. The patent calls the two-armed digger with two blades "the usual" kind, so the clamshell digger was already in common use.
Credit
Thomas S. Disston; Henry Disston & Sons
1964
One call before digging
Fence posts go into the same ground as gas, power, water and telephone lines. By the account of UDig NY, its successor organization, the utilities of Rochester, New York, formed a committee in 1964 so that anyone about to dig could have the lines marked with one phone call, to Rochester Gas and Electric, which passed it to the others. The Underground Facilities Protective Organization, built on the idea, opened its call center on 2 January 1970 and took 3,326 requests in its first year.
Credit
the Rochester utilities' Utility Coordinating Committee; the Underground Facilities Protective Organization
2025
Robots drive solar piles
Built Robotics converts hydraulic excavators to drive the steel piles that hold up solar panels without a driver, working from survey data and carrying close to 200 piles at a time. The company says a two-person crew can set about 300 piles a day, against about 100 for a conventional crew. In September 2025 Blattner, a large US solar builder owned by Quanta Services, said it would use the robots nationwide after earlier projects with them. A long farm or security fence line is the same task with lighter posts; no fence use was found.
Credit
Built Robotics; Blattner
2026
Fence holes hit buried lines
The Common Ground Alliance, a US and Canadian group working to prevent damage to buried lines, collects reports of lines hit while digging. In its summary of 2025 reports, published in 2026, fencing and landscaping work, counted together, caused 9% of reported damages. In damages where nobody had called 811, the one-call number, it was the largest type of work, at about a quarter by the alliance's chart. Damages done with hand tools were 2.7 times as likely as others to involve fencing and 1.6 times as likely to have had no locate request.
Lessonthe call is most often skipped on small hand-dug jobs such as post holes, so the habit has to reach homeowners and small crews, not only excavator operators.
Credit
Common Ground Alliance
Watch for
One operator, every pile
Xpanner says its X1 Piling R6 drives solar and battery-site piles by itself from an uploaded file of coordinates. It steers to each spot with satellite receivers corrected to within centimeters (RTK GNSS), holds each pile plumb, and logs the position, depth and lean of every pile, while one operator supervises by remote control. The company says it cycles 45% faster than its earlier machine, which it says has worked on more than 67 US sites, and that the mast also takes an auger or a ground-screw driver.
Achieved whena contractor or engineer outside the company publishes measured cycle times and position errors from a project, or the machine is used to set the posts of a fence line.
Claimed by
Xpanner, October 2026, with sales from 26 October 2026
Open
01
Post footings load-tested
A public set of side-pull tests on fence posts set five ways (in concrete, in tamped gravel, in two-part expanding foam, driven, and on a ground screw) in at least three soils. Each post is pulled sideways at fence height while force and lean are recorded, and the tests are repeated after a winter.
The briefCredit · unclaimed02
Built posts checked by video
Phone software that takes a walking video of a newly set fence line and reports each post's spacing, height and lean, so an owner or crew lead can check the work against the plan before panels go on.
The briefCredit · unclaimed
Open 01 · the brief
Post footings load-tested
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of side-pull tests on fence posts set five ways (in concrete, in tamped gravel, in two-part expanding foam, driven, and on a ground screw) in at least three soils. Each post is pulled sideways at fence height while force and lean are recorded, and the tests are repeated after a winter.
Why it is still open
Advice on setting posts rests on rules of thumb and makers' warnings. Bob Vila's guide says foam makers "warn against using expanded foam in load-bearing situations" and that concrete is still better for large gates, without giving test numbers. Full-scale backfill tests exist for utility poles, such as Heather Bilesky's 2016 University of Manitoba tests of wood poles in crushed limestone and sand, but a search found no comparable public test of fence posts, only consumer articles and a foam seller's claim.
Built with what exists
Treated 4 by 4 in wood posts and steel line posts; bagged concrete, gravel and a two-part post-setting foam from a hardware store; ground screws; a hand winch with a crane scale or load cell; a digital inclinometer or phone level app; a soil penetrometer to describe each soil.
First step
After an 811 call, set 10 posts by hand, two by each method, in one yard with the owner's permission, and pull them with a hand winch and a crane scale.
Done looks like
At least 60 posts (five methods, three soils, four of each), each with its force-and-lean curve published as data, the force needed to lean each post 2 degrees compared by method, and the same posts pulled again after one freeze-and-thaw season.
Open 02 · the brief
Built posts checked by video
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Phone software that takes a walking video of a newly set fence line and reports each post's spacing, height and lean, so an owner or crew lead can check the work against the plan before panels go on.
Why it is still open
Fence apps help lay posts out before digging and record them afterward by hand. Fence Genius lets a user "capture their as-installed positions step by step" with a tape, a ZipLevel or a level, and one review says elevations at each hole still have to be typed in. A search for an app that checks installed posts from photos or video found none.
Built with what exists
An iPhone Pro with lidar and Apple's ARKit; an open image-segmentation model such as Meta's SAM 2 to pick out posts; the Open3D library to fit a line to each post; a 4 ft level and a tape for the reference measurements.
First step
Film five finished fences with a lidar phone and measure every post by hand, to build the first test set.
Done looks like
On 200 posts in at least 10 fences, spacing within 2 cm and lean within 1 degree of the hand measurement for 95% of posts.