BRENNEN

Industries / Industrial equipment and services / Industrial services

CMMS and asset management software

CMMS and asset management software, meaning computerized maintenance management systems and the larger enterprise asset management (EAM) systems, keeps the record of every machine an organization maintains and of the work done on it: what each item is, which jobs are due and done, which spare parts it uses and how it has failed before.

1963

The US Navy began its Maintenance and Material Management (3-M) System. The Chief of Naval Operations set up a project group in January 1963, and the program was put in place "In March of 1963". It gave ships standard planned-maintenance schedules and a standard form for every maintenance action. From 1 August 1964 a Maintenance Support Office in Mechanicsburg, Pennsylvania, served as "the central data processing facility for the system", by Harvey Oelkers's 1968 master's thesis for George Washington University.

archive.org

34

Milestones achieved across 7 domains.

9

To watch for: announced, not yet confirmed outside.

14

Open deliverables. Nobody has shipped them.

In one minute

Where it started

Maintenance records began as paper cards and forms. In 1963 the US Navy's 3-M System gave each ship printed cards for every planned task, quarterly schedules and one form per job, and from 1964 the reports were processed centrally. Software for single companies followed: Maximo 2.0, released in 1985, handled work orders and inventory on one IBM PC AT, by IBM's account.

Where it stands

Most systems now run in a web browser and on phones. The weak point is the record itself. The NTSB found that the database of Pacific Gas and Electric listed the pipe that burst at San Bruno in 2010 as made without a welded seam when it had one, and GAO found F-35 squadrons tracking data by hand because the logistics system's parts records were wrong or missing. Since 2025, vendors have added AI that reads nameplates, drafts maintenance plans from manuals, suggests failure codes and answers questions about the data. None of these features had a published accuracy figure in the sources found for this file.

What is open

Most open jobs are outside tests and shared data. The AI features now shipping in these products, from nameplate reading to reporting chatbots, have no published outside measurement, since the public tests that exist score research systems, and the field lacks open sets of work orders, parts descriptions and plant sensor names because companies keep their records private. Other open jobs connect sources the software still cannot read: the machine maker's digital description of a machine, and the contractor's documents handed over with a new building.

Domains

AchievedWatch forOpen

Advances to build with

2 research notes

Open in cmms and asset management software

3 of 14 open deliverables

Open · Asset records

A public nameplate test

A public set of at least 1,000 photos of equipment nameplates (motors, pumps, compressors, boilers, air handlers, transformers), each labelled by two people with make, model, serial number, rating and date. Score each nameplate feature and general AI model on how often it reads each field correctly.

Built with what exists

phone cameras; Label Studio, an open-source labelling tool; the nameplate features of shipping CMMS products; general multimodal models such as Gemini and Claude, asked for each field; Gemini Decision 1, which gives probabilities for fixed-answer questions, to flag uncertain readings (see the Note "A thousand questions, one pass").

Credit · unclaimed

Open · Work orders

Score the failure codes

An open test of AI failure coding. Take at least 1,000 real work orders, have two reliability engineers each code them separately with ISO 14224 failure mode, mechanism and cause, then have several AI systems code them. Publish the AI's agreement with the engineers beside the engineers' agreement with each other.

Built with what exists

the MaintIE set of maintenance texts, released under the MIT license; the ISO 14224 code lists; Gemini Decision 1 for code probabilities (see the Note "A thousand questions, one pass"); a small model tuned on one graphics chip, such as Liquid LFM3 (see the Note "One GPU to fine-tune"); Cohen's kappa, the usual measure of agreement between two coders.

Credit · unclaimed

Open · Preventive maintenance

Test plans drafted from manuals

A public comparison over 30 manufacturers' manuals for common equipment. For each manual, two experienced planners write a preventive maintenance plan, each AI tool drafts one, and every task is scored: missed, wrong interval, or not in the manual at all.

Built with what exists

manuals that makers publish online; the plan builders in shipping CMMS products; Claude Fable 5.2 (see the Note "Three working devices") or Gemini, told to cite a page for every task; a shared scoring sheet.

Credit · unclaimed

Where it sits