BRENNEN

Industries / Industrial equipment and services / Industrial services / CMMS and asset management software

Preventive maintenance

Preventive maintenance is work done on a schedule, by calendar or by hours of use, before equipment fails; the software holds each task, its interval and its due date.

4

Milestones achieved, from 1963 to 2023.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1963

    A card for each task

    The Navy's Planned Maintenance System, one half of the 3-M System, gave each work center maintenance index pages that point to maintenance requirement cards. The cards "provide detailed procedures for performing specific maintenance actions", and quarterly schedules showed what was due over each three months, by the Intrepid Museum's description of the records of USS Intrepid.

    intrepidmuseum.libraryhost.comarchive.org

    Credit

    US Navy

  2. 2000

    An interval stretched too far

    On 31 January 2000 Alaska Airlines flight 261 crashed into the Pacific off California, and all 88 people on board were killed. The threads of a nut that moves the tail's horizontal stabilizer had worn away for lack of grease. The NTSB found that Alaska had stretched the lubrication interval from 500 flight hours in 1987 to 8 months, about 2,550 flight hours, by 1996, "more than 400 percent greater", with approval from the Federal Aviation Administration (FAA). The manufacturer's longer interval, offered as justification, had come from a review that changed a whole package of tasks without "a task-by-task analysis".

    LessonEach interval change needs its own evidence; a series of changes justified by intervals set elsewhere can add up to a failure.

    ntsb.gov

    Credit

    NTSB, report adopted 30 December 2002

  3. 2013

    Hospitals may set intervals

    On 2 December 2011 the US Centers for Medicare & Medicaid Services (CMS), in memo S&C 12-07, let hospitals service only non-critical equipment less often than its maker recommends. Equipment "critical to patient health and safety" and new equipment kept the maker's schedule, and all equipment had to be serviced with the maker's "recommended techniques". Binseng Wang of ARAMARK Healthcare Technologies wrote that complying would cost "between $1 billion and $5 billion for the entire nation". On 20 December 2013 CMS replaced it with S&C 14-07. A hospital may now change both the frequency and the activities of maintenance "based on a risk-based assessment by qualified personnel". The exceptions are medical lasers, new equipment without enough history, and equipment that other rules tie to the maker's schedule, such as all imaging equipment. Hospitals that do this must keep "documentation supporting their Alternate Equipment Management (AEM) program".

    LessonThe regulator accepted a hospital's own maintenance history as evidence, which made the CMMS record part of compliance.

    cms.govcms.gov24x7mag.com

    Credit

    CMS

  4. 2023

    Electrical maintenance becomes required

    NFPA 70B, first printed in 1973 as a recommended practice, became the Standard for Electrical Equipment Maintenance in its 2023 edition, in effect from 16 January 2023 when the American National Standards Institute approved it, and its "should" became "shall". It requires a documented electrical maintenance program with a records-retention policy and sets intervals from an assessment of each item's condition, by EC&M's account. It binds only where a jurisdiction, insurer or contract adopts it; federal OSHA has not made it an enforceable standard, by ReliaMag's account.

    ecmweb.comreliamag.com

    Credit

    National Fire Protection Association (NFPA)

Watch for

  1. Plans drafted from manuals

    Limble says its AI-Powered PM Builder "uses data from your asset manuals to generate preventive maintenance tasks". Its help page says "It's important to manually verify the AI's accuracy" and that the builder does not generate parts or tools. NEXGEN says its NAMI PM Builder "reads your OEM manuals" and does in minutes what took a day, with no measured figures.

    Achieved whenan outside test compares the drafted plans with plans written by experienced planners from the same manuals and publishes the missed and wrong tasks.

    help.limblecmms.comnexgenam.com

    Claimed by

    Limble, April 2026; NEXGEN, May 2026

Open

  1. 01

    Test plans drafted from manuals

    A public comparison over 30 manufacturers' manuals for common equipment. For each manual, two experienced planners write a preventive maintenance plan, each AI tool drafts one, and every task is scored: missed, wrong interval, or not in the manual at all.

    The brief
    Credit · unclaimed
  2. 02

    An open task library

    An openly licensed library of preventive maintenance task lists for the 50 most common kinds of building and plant equipment. Each task carries its interval, the skill it needs and the maker's manual or code clause it comes from, in a format open-source CMMS products can import.

    The brief
    Credit · unclaimed

Open 01 · the brief

Test plans drafted from manuals

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public comparison over 30 manufacturers' manuals for common equipment. For each manual, two experienced planners write a preventive maintenance plan, each AI tool drafts one, and every task is scored: missed, wrong interval, or not in the manual at all.

Why it is still open

The tools above ship without accuracy figures. A 2025 workshop paper on turning technical documents into failure-mode tables says its method outperforms manual work but gives no numbers in its abstract.

help.limblecmms.comarxiv.org

Built with what exists

manuals that makers publish online; the plan builders in shipping CMMS products; Claude Fable 5.2 (see the Note "Three working devices") or Gemini, told to cite a page for every task; a shared scoring sheet.

  1. First step

    Pick five manuals for pumps and air compressors and have one planner write the answer-key plans.

  2. Done looks like

    30 manuals and at least 1,000 expert tasks, with a published table for each tool of the share of tasks found, the share with the manual's interval, and the count of tasks with no basis in the manual.

Open 02 · the brief

An open task library

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An openly licensed library of preventive maintenance task lists for the 50 most common kinds of building and plant equipment. Each task carries its interval, the skill it needs and the maker's manual or code clause it comes from, in a format open-source CMMS products can import.

Why it is still open

The UK's SFG20 library holds "1,500+ customisable schedules" across more than 110 asset classes, and SFG20 says "The only way to access the SFG20 standard is through Facilities-iQ", its software, whose price depends on the content chosen, the software features and the number of user licences. Thinkage, a CMMS maker, posts a free library of generic facilities tasks drawn partly from US General Services Administration descriptions, but marks it "All rights reserved" and says it "takes no responsibility for their accuracy, suitability, or completeness". Searches found no openly licensed equivalent.

sfg20.co.uksfg20.co.ukthinkage.ca

Built with what exists

makers' public manuals; Atlas CMMS (AGPLv3) and openMAINT (AGPL), both open-source CMMS products, as import targets; CSV and JSON files; a Creative Commons license; a language model to draft tasks with page citations for people to check.

  1. First step

    Write the task list for one common item, such as a rooftop packaged air conditioner, from three makers' manuals, and post it for comment.

  2. Done looks like

    50 equipment types, each list reviewed by two technicians from different employers, every task traced to a public source, and all lists imported without errors into Atlas CMMS and openMAINT.