Industries / Energy, water and waste / Power generation / Wind turbines
Transport and installation
Transport and installation moves blades, tower sections and nacelles (the housing at the top of the tower that holds the drivetrain) from factories to the site by road, rail, sea and air, and lifts them into place with cranes on land or from ships at sea.
5
Milestones achieved, from 2003 to 2026.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2003
A ship made for turbines
Mayflower Resolution, ordered by the British firm Mayflower Energy, designed by the Danish firm Knud E. Hansen and built by Shanhaiguan Shipyard in China, left the yard on 6 December 2003. It is a 130 m self-propelled jack-up: it lowers six legs to the seabed in water about 3 to 35 m deep and raises its hull above the waves, so its crane works from a steady base. Its designers said it would carry ten unassembled 2 MW turbines and install at least one a day in North Sea conditions, while the few earlier vessels for the job "are only able to operate in relatively shallow and protected waters." Its first job was to be the North Hoyle wind farm off North Wales.
Credit
Mayflower Energy; Knud E. Hansen; Shanhaiguan Shipyard
2011
Blades tilted over bends
As blades grew past 45 m, the trailers that carried them could no longer get round roundabouts, the haulier Ter Linden Transport told the trade magazine KHL in 2011. Trailer makers answered with trailers that stretch and steer, and with blade adapters that hold a blade by its root and raise it to swing over tight bends, which the maker TII says replaced slow maneuvering or unloading the blade by crane. Goldhofer's FTV 850 blade lifter of 2021 can raise a blade to 60° and turn it on its own axis. A 2025 route survey for Statkraft's Giant's Burn wind farm in Scotland plans for blade lifters where bends are tight, with a transfer yard to move blades onto them and overhead lines cleared along the way.
Credit
TII Group (Scheuerle), Nooteboom and Goldhofer; Ter Linden Transport
2011
Assembled in port, towed out
WindFloat 1, a 2 MW Vestas V80 turbine on a semi-submersible platform (a float that rides partly under water), was fully assembled and commissioned in port south of Lisbon in October 2011, then towed about 400 km by a tug to its site 5 km off Aguçadoura, Portugal, with no heavy-lift vessel needed at sea. Over a five-year test it delivered about 17 GWh and rode out waves over 17 m high. It was then towed back to the port of Sines, where an ordinary onshore crane removed the turbine, and the platform was later used again at Kincardine in Scotland until late 2020. Principle Power calls it the first floating turbine on a semi-submersible platform, and the trade site Offshore Wind, reporting the 2016 decommissioning, called the removal at Sines the first time an offshore turbine had been taken off a floating structure.
Lessona turbine that floats can be built and taken apart in port with ordinary cranes, which takes the heavy lifts off the sea.
Credit
Principle Power; Vestas (turbine)
2022
A nacelle drops in Houston
On 23 July 2022 a crane's hoisting wire on the cargo ship Thorco Basilisk parted while lifting a 69-tonne Nordex wind turbine nacelle out of its hold at a terminal on the Houston Ship Channel, Texas. The nacelle fell from 3 to 6 feet (1 to 2 m) onto the deck below, causing an estimated $3 million to $5 million of damage and no injuries. The US National Transportation Safety Board found the cause was undetected corrosion and wear in the wire's strands, which could not be seen until the grease was removed; the rope had served about 9 of the 10 years its maintenance plan allowed. The ship's operator then cut the replacement interval to 5 years.
Lessona crane wire exposed to salt air can wear out within its rated life, and a visual check through grease will not show it.
Credit
NTSB, report MIR-23-26
2026
A US-built installer at work
Charybdis, built for Dominion Energy by Seatrium's AmFELS yard in Brownsville, Texas, from December 2020, is what Maritime Executive calls the first wind turbine installation vessel built in the US. It is 144 m by 56 m, its crane lifts up to 2,200 tons, and because it is US-built and US-registered it complies with the Jones Act, the US law on shipping between US ports, which gives it more freedom than the foreign vessels used at earlier US wind farms, by Maritime Executive's account. When it reached Virginia in September 2025, an inspection by local regulators found about 200 items to fix, mainly in the condition of electrical parts and in papers showing its systems met US codes; Dominion's chief executive said "we failed to deliver regarding Charybdis" and put its cost at about $715 million. Coastal Virginia Offshore Wind delivered first power in March 2026, and by Dominion's count 44 of its 176 turbines were installed by the end of October 2026, with the last now expected by the end of 2027.
LessonDominion said it "didn't properly account in our timing estimate for the risk inherent in being the first".
Credit
Dominion Energy; Seatrium AmFELS
Watch for
A plane for blades
Radia says its WindRunner aircraft will carry wind turbine blades longer than 100 m, with more than 6,800 cubic meters of cargo space, and will land on unpaved runways as short as 1,800 m, so loads too long for roads could fly straight to a site. It is in detailed design and has not flown; Radia targets a first flight "by the end of the decade."
Achieved whena WindRunner is certified and has delivered a blade to a wind farm.
Claimed by
Radia, January 2026
Open
01
Screen blade routes from maps
A program that takes a port, a wind farm site, a blade length and a trailer type, follows the route on open map data, and lists every roundabout, bend, verge, lamp post, road sign or overhead line where the blade would sweep outside the road, as a first screen before engineers survey the route on the ground.
The briefCredit · unclaimed02
Camera-guided blade mating rig
A model at about 1:20 scale of the moment a single blade, hanging from a crane, is guided onto the hub so the bolts in its root enter the hub's holes, with a camera-guided controller that steers the blade through tugger lines (ropes from the crane that keep a load from swinging), compared with a human operator on the same rig.
The briefCredit · unclaimed
Open 01 · the brief
Screen blade routes from maps
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A program that takes a port, a wind farm site, a blade length and a trailer type, follows the route on open map data, and lists every roundabout, bend, verge, lamp post, road sign or overhead line where the blade would sweep outside the road, as a first screen before engineers survey the route on the ground.
Why it is still open
Each wind farm's route is surveyed by consultants on site and checked point by point with swept-path drawings (the outline a long load traces as it turns). Pell Frischmann's 2025 survey for Giant's Burn lists numbered "points of interest" from the docks to the site, such as roundabouts where lighting columns and road signs must come out. Consultancies run commercial swept-path software, such as Autodesk Vehicle Tracking with libraries of turbine delivery vehicles, on Ordnance Survey map data, and write up each pinch point in turn. Open swept-path tools exist, but they check one turn at a time, for buses in the QGIS map program or on CAD drawings, and none runs a whole route for a blade trailer. A search of journal records, GitHub and the web in November 2026 found no tool that does.
projects.statkraft.co.ukvattenfall.co.ukgreencatrenewables.co.ukgithub.comgithub.com
Built with what exists
OpenStreetMap road geometry through the OSMnx library; open aerial imagery; Shapely for the swept-path geometry; trailer dimensions from makers' data sheets, including blade lifters that tilt to 60°; a language model that turns the constraint tables of published route surveys into a test set and cites the page each came from (see the Note "Findings that cite notes").
First step
Turn the constraint tables of three published surveys, such as those for Giant's Burn and South Kyle II, into a spreadsheet of locations to test against.
Done looks like
On 20 route surveys published with Scottish wind farm applications, the program flags at least 80% of the points the surveyors listed, with its false alarms per 10 km of route reported.
Open 02 · the brief
Camera-guided blade mating rig
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A model at about 1:20 scale of the moment a single blade, hanging from a crane, is guided onto the hub so the bolts in its root enter the hub's holes, with a camera-guided controller that steers the blade through tugger lines (ropes from the crane that keep a load from swinging), compared with a human operator on the same rig.
Why it is still open
Offshore, blades are mated to the hub one by one from jack-up vessels, and a long guide pin in the blade root is there "to visually aid the offshore crew (present in the nacelle)." Verma and colleagues (2020) found by computer simulation that the root can be damaged by impacts at a "relatively low threshold velocity". Their study and the others they cite model mating by computer. GE patented, in 2020, a blade-lifting device with a distance sensor on the hub and cameras that check the blade in its cradles, for taking blades down, and a 2019 TU Delft master's thesis by Koen de Leeuw, written with Van Oord, calls the alignment of blade and hub "the limiting factor" in single-blade installation and studies it with a numerical model only. A search of journal records and the web in November 2026 found no open physical test that measures how often an automatic controller gets the bolts in.
Built with what exists
A small gantry or jib crane with tugger winches; a 3D-printed blade root with studs and a matching hub flange; a fan and a moving platform to make the swing that wind and waves cause; cameras with printed markers and OpenCV for tracking; a motion controller written in Python.
First step
Print the scale root and flange, hang the root from a small hoist, and log a human operator's success over 20 attempts.
Done looks like
50 filmed attempts at each of three swing levels, with the success rate and the measured impact speed at contact published for the controller and for a human operator.