BRENNEN

Industries / Energy, water and waste / Power generation / Wind turbines

Towers and land foundations

The tower holds the nacelle and rotor up in stronger, steadier wind, and the foundation keeps it from overturning; on land the foundation is usually a thick slab of reinforced concrete with a ring of anchor bolts, called a bolt cage, cast into it for the tower to stand on.

5

Milestones achieved, from 1993 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1993

    Towers get a building rule

    In Germany, an expert committee on wind turbines at the German Institute for Construction Technology (DIBt) wrote a guideline, dated June 1993, on the loads a wind turbine tower and its foundation must carry and how to prove they will stand. The states adopted it as a technical building rule because from 1 June 1993 local building authorities became the bodies that approved every wind turbine; Brandenburg adopted it on 14 October 1994 and withdrew it in 2018. A revised edition, dated March 2004, kept the same title and scope.

    bravors.brandenburg.deumwelt-online.de

    Credit

    DIBt's expert committee on wind turbines

  2. 2003

    Typhoons topple turbines

    In September 2003 Typhoon Maemi struck Japan with gusts of 74 m/s and damaged all the turbines at an onshore coastal wind farm, the earliest documented case of a tropical cyclone causing significant turbine damage, by the account of a 2026 review in Wind Energy Science. Three years later Super Typhoon Saomai struck Cangnan County, China, with 10-minute winds above 60 m/s and gusts above 80 m/s; 27 of 28 turbines failed and five towers collapsed.

    Lessonwind speeds that the existing design classes assumed could be exceeded where typhoons strike.

    wes.copernicus.org

    Credit

    damage analysis by Ishihara and colleagues (2005), summarized by Deskos and colleagues (2026)

  3. 2019

    A design class for typhoons

    The International Electrotechnical Commission (IEC) added a Tropical T-Class to its wind turbine design standards, IEC 61400-1 and IEC 61400-3-1 (2019), which sets the 10-minute average wind at hub height that a turbine must survive, once in 50 years, at 57 m/s. The 2026 review notes that the class does not address the fatigue built up by many smaller storms, and a 2023 simulation study by Gomez, Lundquist and colleagues found that winds near the eyewall of category 1 to 3 tropical cyclones can exceed the design criteria for both class I and class T turbines.

    wes.copernicus.orgdoi.org

    Credit

    IEC

  4. 2020

    One standard for towers

    The IEC published the first edition of IEC 61400-6 on 21 April 2020. It sets requirements for the structural integrity of onshore wind turbine towers and their foundations, including how to assess the soil, how to design the flanges and bolted joints that carry the nacelle, and risks that arise during assembly and maintenance. An amendment followed in 2025.

    webstore.iec.ch

    Credit

    IEC

  5. 2024

    A tower made of wood

    Modvion's first commercial wooden tower, 105 m tall, carries a Vestas V90-2.0 MW turbine near Skara, Sweden, for the power company Varberg Energi. It is built from curved panels of laminated veneer lumber (thin sheets of wood glued together) in 28 modules and seven sections, small enough to ship like flat-pack furniture. Modvion lists delivery in 2023; the European Commission's Horizon magazine says the tower entered operation in February 2024. Modvion's chief executive says the wood cuts the emissions of making the tower by 90% compared with steel, a figure from the company.

    projects.research-and-innovation.ec.europa.eumodvion.com

    Credit

    Modvion; Varberg Energi

Watch for

  1. A hub at 300 meters

    GICON says its pilot turbine at Schipkau, Germany, built for SPRIND, Germany's Federal Agency for Disruptive Innovation, reached its full height of 365 m, with the hub at 300 m. An inner tower was raised through an outer lattice tower by a hydraulic lift, so no crane had to reach the top. The turbine is rated at 3.8 MW. GICON says the height raises the energy yield by 40% in one report, and gives about twice the energy of a conventional turbine with the same rotor in another; commissioning was planned for November 2026.

    Achieved whena year of measured output is published and checked by the grid operator or an independent assessor.

    electrek.cocleanenergywire.org

    Claimed by

    GICON, September and October 2026

  2. Series towers near 200 meters

    Max Bögl Wind says that with Vestas it has finished a V172-7.2 MW turbine on a 199 m steel and concrete hybrid tower at Winnberg near Sengenthal, Germany, which it calls the world's tallest series-built turbine, built from standard parts that fit other hub heights. It expects 17 to 18 million kWh a year after commissioning in autumn 2026.

    Achieved whenthe turbine's first year of output is published and the same tower design is built for other customers.

    mbrenewables.com

    Claimed by

    Max Bögl Wind, September 2026

Open

  1. 01

    A public ledger of foundations

    A public table of onshore wind turbine foundations read from planning applications and environmental statements: diameter, depth, concrete volume, reinforcing steel, foundation type, ground conditions, turbine model and hub height, each row linked to its document, so designers can see how foundations grow with turbine size and anyone can check a project's claimed concrete and carbon.

    The brief
    Credit · unclaimed
  2. 02

    Check typhoon-zone turbine classes

    A public table of the wind turbines that stand in the paths of tropical cyclones, giving each one's model and that model's IEC design class from its maker's data sheet or type certificate, to show how much capacity in storm tracks rests on machines rated below the Tropical T-Class.

    The brief
    Credit · unclaimed

Open 01 · the brief

A public ledger of foundations

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of onshore wind turbine foundations read from planning applications and environmental statements: diameter, depth, concrete volume, reinforcing steel, foundation type, ground conditions, turbine model and hub height, each row linked to its document, so designers can see how foundations grow with turbine size and anyone can check a project's claimed concrete and carbon.

Why it is still open

Engineers at the contractor NCC analyzed 17 foundation designs from 13 Swedish wind farms (1,094 turbines of 3.0 to 6.2 MW) and wrote that foundations have traditionally been designed case by case and that building on earlier projects' experience is key to using less material. Their data came from projects whose turbine and foundation data were available to them. A search in November 2026 found only typical figures in patents and claims by vendors, and no public table across countries. The documents exist: German permit notices often attach the foundation data sheet, such as Kreis Paderborn's for an Enercon E-175 on a 162 m Max Bögl hybrid tower, a slab 27.5 m across holding 963.1 m³ of concrete.

research.chalmers.sekreis-paderborn.de

Built with what exists

German district permit notices, planning portals such as Scotland's Energy Consents Unit and English and Welsh local authority portals, and US county permit records; a language-model agent that reads each document and cites the page each number came from (see the Note "Findings that cite notes"); two civil engineers who check a sample.

  1. First step

    Pull 20 onshore wind applications approved in Scotland since 2020 and record which foundation figures each one actually reports.

  2. Done looks like

    300 foundations from at least three countries, each linked to its source, with a 10% sample checked by two engineers and the error rate reported, published under an open license.

Open 02 · the brief

Check typhoon-zone turbine classes

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of the wind turbines that stand in the paths of tropical cyclones, giving each one's model and that model's IEC design class from its maker's data sheet or type certificate, to show how much capacity in storm tracks rests on machines rated below the Tropical T-Class.

Why it is still open

A 2026 review in Wind Energy Science mapped the world's installed turbines against historical cyclone tracks, but not by design class, and noted that most documented storm damage involved older 500 kW to 2 MW machines, which "do not allow us to make conclusions regarding the vulnerability of more recent T-Class designs." A Crossref search in November 2026 found simulation studies of storm winds but no fleet table by class.

wes.copernicus.org

Built with what exists

Global Energy Monitor's Global Wind Power Tracker (the data behind the review's map) for project locations; the US Wind Turbine Database and The Wind Power's paid database, which can link wind farms to turbine models; NOAA's IBTrACS storm tracks; makers' data sheets; a language-model agent that cites the page that gives each class (see the Note "Findings that cite notes"); QGIS.

  1. First step

    List the 30 most common turbine models in tracked projects in the Philippines, Taiwan, Japan and the US Gulf Coast and find each one's design class.

  2. Done looks like

    Every turbine model with at least 500 MW installed within 100 km of a category 3 or stronger track since 1980 assigned a design class with a cited source, and the share of exposed capacity in each class, published openly.