BRENNEN

Industries / Energy, water and waste / Water and wastewater

Sewers

Collecting used water from toilets, sinks and factories, and in many older cities rainwater too, and carrying it through underground pipes and tunnels to a treatment plant.

7

Milestones achieved, from c. 3000 BCE to 2025.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. c. 3000 BCE

    A city plans its drains

    Mohenjo-daro, in the Indus Valley in today's Pakistan, laid its streets out at right angles and built an elaborate drainage system, with wells and soak pits for getting rid of sewage. UNESCO calls it the best-preserved city in South Asia from the start of the 3rd millennium BCE.

    whc.unesco.org

    Credit

    builders of the Indus civilization

  2. 1858

    The Great Stink

    In the hot summer of 1858, waste in the Thames filled London with a stench, and Joseph Bazalgette then built intercepting sewers that catch the flow from street sewers before it reaches the river, with pumping stations at Deptford, Crossness and Abbey Mills. The network opened officially in 1865 and was finished in 1875, joining 1,100 miles (about 1,770 km) of street drains to 82 miles (about 132 km) of new brick sewers.

    LessonRain and sewage shared the same pipes, so heavy rain still pushed waste into the Thames, the problem London's next big tunnel was built to fix.

    londonmuseum.org.uk

    Credit

    Joseph Bazalgette

  3. 1970

    Lining pipes without digging

    Eric Wood patented a way to repair a buried pipe from inside: a felt tube soaked in resin is put into the old pipe and inflated against its wall, and the resin hardens into a new, rigid pipe. His UK priority filing is dated 22 September 1970, and the method, first sold by Insituform, is now called cured-in-place pipe.

    patents.google.com

    Credit

    Eric Wood; Insituform Pipes and Structures Ltd

  4. 1994

    Rules for storm overflows

    On 19 April 1994 EPA published its Combined Sewer Overflow Control Policy, for cities whose single pipes carry both sewage and rainwater and spill into rivers in storms; EPA counts about 860 such communities, home to about 40 million people.

    LessonChicago judged that rebuilding with separate pipes would cost too much and cause too much upheaval, and instead dug 110 miles (177 km) of deep storage tunnels from 1975; its water district says overflow days fell from about 100 a year to about 50.

    epa.govmwrd.org

    Credit

    US EPA

  5. 2020

    Sewage as early warning

    Researchers at KWR Water Research Institute in the Netherlands found genetic material from the COVID-19 virus in sewage in early March 2020; in Amersfoort it showed up six days before the first reported cases. In September 2020 the US CDC launched its National Wastewater Surveillance System, which now shares sewage data for COVID-19, influenza A, RSV, measles, H5 bird flu and mpox.

    ebi.ac.ukcdc.govcdc.gov

    Credit

    Gertjan Medema and colleagues (KWR); US CDC

  6. 2023

    Software logs sewer defects

    A sewer survey means driving a camera robot through a pipe while a crew watches and logs cracks and roots by hand. From April 2023 Wessex Water in England used Molfar's AI tool to write the defect log from the video, by early 2024 for most of its planned surveys, over 100 km, and says each crew's daily length more than doubled; in Toronto, engineers tested three AI vendors against the 85% accuracy that NASSCO, the North American sewer-inspection association, requires of a human operator, and one passed and joined the workflow after a three-month side-by-side trial.

    cms.marketplace.wessexwater.co.ukunitracc.com

    Credit

    Molfar; Wessex Water; City of Toronto

  7. 2025

    Counting and catching overflows

    Every storm overflow in England now has an event duration monitor, a sensor that logs when an overflow spills and for how long, and the Environment Act 2021 requires the data to be published; the 2025 data, released in March 2026, showed 291,492 spills, 35% fewer than in 2024, which the Environment Agency says mostly reflects a dry 2025 after a wet 2024. In London, the 25 km Thames Tideway Tunnel, 7.2 m wide and able to hold 1.6 million cubic meters of overflow, was fully connected and in operation by February 2025.

    gov.uktideway.london

    Credit

    Environment Agency and English water companies; Tideway

Watch for

  1. Robot inspects the super sewer

    Tideway and the consultancy Amentum trialed a remotely driven wheeled robot with cameras and laser scanners (LiDAR) in the Thames Tideway Tunnel; AI found cracks and distance markers and sped up review of thousands of images, and the radio link held across 7 km of tunnel. The trials ran before the tunnel was in service, blockage detection used simple rules because no training data existed, and Tideway shelved a first attempt in 2017–18 because it cost two to three times a manual survey.

    Achieved whenthe robot completes a full inspection of the working tunnel, and an outside party finds that its results match a conventional survey.

    raeng.org.uk

    Claimed by

    Tideway and Amentum, reported by the Royal Academy of Engineering, February 2026

  2. Electric probe finds leaky sewers

    Porto's municipal utility, Águas e Energia do Porto, piloted a probe that sends a low-voltage current through a water-filled sewer; the current escapes only where the pipe wall is broken, and AI turns the readings into an estimate of how much water leaks in. Over about 3 km of sewer it reported more than 1,000 defects letting in about 80 liters per second of groundwater and stormwater.

    Achieved whenflow measurements after repairs, or an independent survey, confirm the inflow the probe predicted.

    kurrant.com

    Claimed by

    Águas e Energia do Porto, March 2026

Open

  1. 01

    An exam for sewer AI

    An open test for software that codes sewer inspection video: clips coded independently by several certified human inspectors, a scoring script, and a public table of each tool's score.

    The brief
    Credit · unclaimed
  2. 02

    Pictures of blocked tunnels

    A labeled image set of large sewers and tunnels with blockages such as sediment, debris and rag mats, part real and part rendered, and a detector trained and tested on it.

    The brief
    Credit · unclaimed

Open 01 · the brief

An exam for sewer AI

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open test for software that codes sewer inspection video: clips coded independently by several certified human inspectors, a scoring script, and a public table of each tool's score.

Why it is still open

Sewer-ML (Joakim Bruslund Haurum and Thomas Moeslund, 2021) offers about 1.3 million still images labeled by inspectors from three utilities, but not video scored the way North American operators are tested. Toronto built its own test from five videos to check vendors against NASSCO's 85% bar, and a Quebec review by CERIU (December 2024) notes the lack of standard certification programs for these tools.

arxiv.orgunitracc.comceriu.qc.ca

Built with what exists

Inspection videos that cities publish or release on request; NASSCO's defect codes and certified coders; Sewer-ML for pre-training; a video model fine-tuned on one graphics chip as a baseline (see the Note "One GPU to fine-tune").

  1. First step

    Ask five cities for 20 inspection videos each, with their coded reports.

  2. Done looks like

    100 clips from at least five cities, each coded by three certified inspectors, with the inspectors' agreement with each other published alongside every tool's score.

Open 02 · the brief

Pictures of blocked tunnels

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A labeled image set of large sewers and tunnels with blockages such as sediment, debris and rag mats, part real and part rendered, and a detector trained and tested on it.

Why it is still open

Tideway and Amentum's inspection robot (see Watch for) had to spot blockages with simple rules because no training data existed.

raeng.org.uk

Built with what exists

Blender or NVIDIA Isaac Sim to render tunnel scenes with blockages placed at known spots; public inspection footage; an open object-detection model such as YOLO; one graphics chip.

  1. First step

    Render 500 images of a 7.2 m tunnel, Tideway's width, with three kinds of blockage, and label them.

  2. Done looks like

    5,000 labeled images released under an open license, and a detector whose precision and recall on 200 real frames, labeled by an inspector, are published.