Cutting emissions
Cutting emissions means reducing the carbon dioxide released in making metals, mainly by changing how iron is made or by capturing the gas.
4
Milestones achieved, from 2012 to 2025.
1
To watch for: announced, not yet confirmed outside.
1
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2012
Capture plan withdrawn
ArcelorMittal's ULCOS project at Florange, France, planned to capture 0.7 to 1.2 million tonnes of carbon dioxide a year from steel production. Its bid for EU NER300 funding was withdrawn in late 2012 for technical reasons; it was the last project meeting the scheme's requirements. ArcelorMittal has kept the plant available for later capture tests.
Lessona first capture plant at a steelworks stalled even with public money on offer.
Credit
ArcelorMittal
2016
Capture at a steel plant
The Al Reyadah plant in Abu Dhabi began taking carbon dioxide from the Emirates Steel works in November 2016, compressing it and piping it to ADNOC oilfields, where it is used to recover more oil. It was expected to handle 800,000 tonnes of carbon dioxide a year. The Global CCS Institute called it the first iron and steel project of its kind.
Credit
Al Reyadah, ADNOC and Emirates Steel
2024
Last Port Talbot furnace closed
Blast furnace 4 at Tata Steel's Port Talbot works in Wales closed on 30 September 2024, ending iron and steel production from ore there. An electric arc furnace, the route worldsteel's averages put at under a third of the blast furnace route's carbon dioxide per tonne, is due to open by the end of 2027.
Lessonchanging route can leave a plant with no steelmaking for years, and the Senedd's researchers report thousands of job losses at Tata and its suppliers.
Credit
Tata Steel UK
2025
German hydrogen plans suspended
In June 2025 ArcelorMittal suspended its planned €1.3 billion direct reduction and electric furnace projects at Bremen and Eisenhüttenstadt in Germany. Its European chief executive said the business case was "not strong enough" even with state support, citing high German electricity prices, slow progress on hydrogen and weak demand.
Lessonsubsidies alone did not make hydrogen-based ironmaking pay where power was expensive.
Credit
ArcelorMittal
Watch for
Stegra plant start
Stegra is building a steel plant at Boden, Sweden, that will make iron with hydrogen from its own 740-megawatt electrolysis plant. It closed a €1.4 billion financing round in June 2026 to complete and commission the plant, and says the timeline is under review; production, first planned for 2025, was targeted for late 2026 as of April 2026.
Achieved whenthe plant makes steel from its own hydrogen-reduced iron and a customer or auditor confirms deliveries and emissions.
Claimed by
Stegra, June 2026
Open
01
Register of green steel claims
A public register of every steel product sold as low-emission. For each: maker, plant, production route, how the reduction is assigned to the product (physical product, mass balance, or certificates), certifier, and claimed carbon dioxide per tonne, each field linked to its source. Mass balance means a company assigns reductions made somewhere in its operations to chosen products, which need not contain the lower-emission material.
The briefCredit · unclaimed
Open 01 · the brief
Register of green steel claims
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public register of every steel product sold as low-emission. For each: maker, plant, production route, how the reduction is assigned to the product (physical product, mass balance, or certificates), certifier, and claimed carbon dioxide per tonne, each field linked to its source. Mass balance means a company assigns reductions made somewhere in its operations to chosen products, which need not contain the lower-emission material.
Why it is still open
SteelZero, a group of steel buyers, said in October 2025 that "inconsistent and opaque methods make it difficult for buyers to verify claims," and that it does not automatically recognise mass balance claims. A search found no product-level public register.
Built with what exists
Producers' product pages, environmental product declarations and certifier listings; a shared database; an AI model to draft entries from documents for a person to check (the Note "Seven more flagged" covers an AI reviewer of long documents).
First step
Define the fields and fill in the first 10 products sold in Europe and North America.
Done looks like
At least 50 products from at least 15 producers, each field sourced and checked by two people, updated monthly for six months, with producers invited to correct entries.