BRENNEN

Industries / Energy, water and waste / Power generation / Solar panels

Module assembly

Module assembly turns finished cells into a sealed panel: cells are joined into strings with thin copper wires, laid between sheets of glass and plastic film, bonded under heat and vacuum (lamination), then fitted with a frame and a junction box.

6

Milestones achieved, from 1980 to 2026.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1980

    A megawatt in a year

    In 1980 ARCO Solar became the first company to make more than 1 MW of solar modules in a single year, by the US Department of Energy's account. World production of solar modules had passed 500 kW only in 1977, and it passed 9.3 MW in 1982.

    www1.eere.energy.gov

    Credit

    ARCO Solar

  2. 1980s

    EVA replaces safety-glass film

    Module makers then commonly sealed cells with PVB, the plastic film made for car safety glass, which had to be kept cold before use and pressed in an autoclave (a pressure oven). Working for NASA's Jet Propulsion Laboratory (JPL), Springborn Laboratories compounded DuPont's Elvax 150, a grade of ethylene vinyl acetate (EVA), with a curing agent and ultraviolet stabilizers into a clear film that sets during vacuum lamination. Makers reported that it cost less, looked better, needed no cold storage and no autoclave, according to JPL's 1986 final report. The 2026 International Technology Roadmap for Photovoltaic (ITRPV), a yearly survey of makers by the German engineering association VDMA, says EVA still holds a considerable share because it is cheap, while polyolefin films (POE) are expected to take over because they are more reliable.

    ntrs.nasa.govqualenergia.it

    Credit

    JPL's Flat-Plate Solar Array Project; Springborn Laboratories; DuPont

  3. 2011

    A factory built on promises

    In September 2009 the US Department of Energy made the first award under its loan guarantee program, a $535 million guarantee, to Solyndra to build a module factory in Fremont, California. In September 2011 Solyndra laid off 1,100 employees, stopped making panels and filed for bankruptcy. The department's Inspector General found in 2015 that Solyndra's plan relied on selling panels above the market price, and that it had not told the department that all four of its contract customers had been offered price cuts before the loan closed.

    Lessona new panel design has to compete with the falling price of ordinary panels, and a lender has to check the sales contracts behind the forecast.

    energy.gov

    Credit

    Solyndra; US Department of Energy Office of Inspector General (investigation)

  4. 2025

    Many wires tolerate cracks

    Cells are now cut in half and joined by many thin copper wires instead of a few flat ribbons. The ITRPV says copper wires, introduced for half-cut cells, will remain the main way to connect cells, with about 94% of the market in ten years, and that cells with 13 to 18 busbars (the printed strips the wires attach to) held about 68% of the market in 2025. In its 2026 tests Kiwa PVEL, an independent test lab in California, found that because so many wires cover each cell, a crack rarely cuts off part of it: even modules with extreme numbers of cracked cells lost at most about 5% of their power.

    qualenergia.itscorecard.pvel.com

    Credit

    module makers; VDMA's ITRPV (figures); Kiwa PVEL (tests)

  5. 2025

    Factories outgrow demand

    The ITRPV puts world module-making capacity at about 1,460 GW a year at the end of 2025, against about 706 GW of modules shipped that year, close to the 2024 figure. It says prices fell sharply in 2024 because of overcapacity, market conditions and new technology, and rose about 9% in 2025 after China regulated its market. Since 1976, the average module price has fallen about 26% each time the total number of modules ever shipped has doubled.

    Lessonbuilding factories faster than demand grows pushes prices down for every maker, the efficient ones included.

    qualenergia.it

    Credit

    VDMA's ITRPV (survey of makers and suppliers)

  6. 2026

    Thin glass breaks in hail

    Most new modules now have glass on both faces, often 2.0 mm on each side, a build Kiwa PVEL calls standard. Only 7% of the module recipes sent to Kiwa PVEL for testing in its 2026 round had a plastic backsheet. In Kiwa PVEL's hail tests, which fire lab-made ice balls of 35 to 55 mm, 61% of modules with 2.0 mm glass on both faces broke from 45 mm hail, against 7% of designs with thicker glass. Glass near the edges and near the holes drilled for the junction box broke most often. The ITRPV expects glass thinner than 2 mm, about 5% of glass-glass modules in 2025, to reach about 10% by 2036.

    Lessonthinner glass cut weight and cost and gave up hail strength.

    scorecard.pvel.comscorecard.pvel.comqualenergia.it

    Credit

    module makers; Kiwa PVEL (tests); VDMA's ITRPV (figures)

Watch for

  1. Zero busbars, unproven at scale

    In a zero-busbar (0BB) module the copper wires bond straight to the cell's fine contact lines, with no printed busbars, which saves silver paste and two printing machines per line. Huasun says its version also improves reliability by reducing hot spots (cells that overheat). TaiyangNews reported in July 2026 that nearly every leading supplier showed a 0BB module in 2025.

    Achieved whenan independent lab publishes thermal-cycling, damp-heat and hot-spot results for 0BB modules from several makers that are no worse than those of modules with busbars.

    taiyangnews.infotaiyangnews.info

    Claimed by

    Huasun, July 2025

  2. Gapless cells add power

    JA Solar says that overlapping the cells so there is no gap between them, and hiding the ribbons that join the strings behind the cells ("full screen"), together add 7 to 8 W to a module. Overlapping raises stress at cell edges, so makers insert a film between the overlapping cells to reduce cracking.

    Achieved whenan independent lab measures modules built from the same cells with and without these layouts and finds the gain, and mechanical-load and thermal-cycling tests show no extra cracking.

    taiyangnews.info

    Claimed by

    JA Solar, reported by TaiyangNews in July 2026

Open

  1. 01

    Robot lays up custom modules

    A robot arm that does the hand steps of a line making building-integrated modules (panels made to fit a particular facade or roof, in many shapes and sizes, in batches as small as one): placing the pre-wired cell blocks on the glass to match a layout file, then joining their end connections. Tested on unlaminated layups made with scrap cells.

    The brief
    Credit · unclaimed
  2. 02

    What's inside each model

    A public table, filled in by an AI model reading makers' datasheets, that gives for each module model the thickness and type of the front and rear glass, the encapsulant (EVA, POE or a mix), the frame material, the junction box and its number of diodes, the cell format and how the cells are cut, with a link to the source file for each row.

    The brief
    Credit · unclaimed

Open 01 · the brief

Robot lays up custom modules

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A robot arm that does the hand steps of a line making building-integrated modules (panels made to fit a particular facade or roof, in many shapes and sizes, in batches as small as one): placing the pre-wired cell blocks on the glass to match a layout file, then joining their end connections. Tested on unlaminated layups made with scrap cells.

Why it is still open

Fraunhofer ISE's 2025 pilot line for such modules, which made 4,500 modules with the Swiss solar-roof maker Freesuns, uses an automated machine to build the cell blocks but "flexible manual workstations" for layup and end connections; the adhesive on the end connections was applied by hand-brushing, and Fraunhofer names an automated system that matches the brushing as the next step. The research institute ISFH runs a project, APPEAL, from January 2026 to June 2028 to automate small-batch production of such modules, with flexible grippers for parts of varying size; it has not yet reported results. Lay-up machines sold for volume lines, such as Mondragon Assembly's, place strings straight from the stringing machine onto the glass, up to 600 strings an hour.

ise.fraunhofer.deisfh.demondragon-assembly.com

Built with what exists

A collaborative robot arm with vacuum cups; an overhead camera; an open robot model trained from human demonstrations (see the Note "Five demonstrations per task" and the Note "Open robot model weights"); LeRobot tools for recording and training (see the Note "No download"); a low-voltage bench power supply and a camera that sees the faint glow of a powered cell (electroluminescence) to check cells for cracks before and after.

  1. First step

    Build a table jig with one sheet of glass and 30 scrap cells, and record 50 remote-controlled placements that follow one printed layout.

  2. Done looks like

    20 filmed layups across five different layouts, with each block's position measured from photos against the layout file (target within 0.5 mm), a count of cells cracked by the robot, and the minutes per layup against a person doing the same five layouts.

Open 02 · the brief

What's inside each model

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table, filled in by an AI model reading makers' datasheets, that gives for each module model the thickness and type of the front and rear glass, the encapsulant (EVA, POE or a mix), the frame material, the junction box and its number of diodes, the cell format and how the cells are cut, with a link to the source file for each row.

Why it is still open

Kiwa PVEL found that 61% of modules with 2.0 mm glass on both faces broke from 45 mm hail, against 7% of thicker-glass designs, but it names only top performers, and buyers have no public table of which models use which glass. ENF Solar's free online directory lists about 45,000 panels, but it can be filtered by frame type and junction box, not by glass thickness or encapsulant, and it offers no bulk download. A 2023 University of Freiburg master's thesis built a pipeline that extracts electrical and thermal figures from datasheet tables and tested it on 10 PDFs; it did not cover materials. Small open tools have appeared on GitHub since 2025, such as one that uses a language model to pull a datasheet's electrical, mechanical and certificate data into a fixed format; they share the tool, not a checked dataset. A search found no public dataset of module materials drawn from datasheets.

scorecard.pvel.comenfsolar.comad-publications.informatik.uni-freiburg.degithub.com

Built with what exists

A language model that reads long documents (see the Note "Seven more flagged"); Camelot or pdfplumber to pull tables from PDFs; Python; a fixed list of fields; a person to check a random sample by hand.

  1. First step

    Collect 100 datasheets for current glass-glass modules, fill in 20 by hand to settle the list of fields, and run a model on the other 80.

  2. Done looks like

    At least 2,000 datasheets from at least 30 makers in one public table; 200 rows picked at random and checked by hand against the PDFs, with the share of correct fields published (target 98%); and a count of glass thickness by maker and by year.