Quay cranes
Quay cranes, also called ship-to-shore (STS) cranes, run on rails along the wharf and lift containers between the ship and the land.
5
Milestones achieved, from 1967 to 2024.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1967
Spreaders that change size
A spreader is the steel frame under a crane that locks onto the four top corners of a container. Bromma, a Swedish maker, says it produced "the first telescopic spreader in the world" in 1967, for Gothenburg, New York (Port Elizabeth), Glasgow and Zeebrugge. A telescopic spreader slides longer or shorter, so a crane can lift boxes of different lengths without changing its spreader. Kalmar, the group Bromma now belongs to, says "this design still rules the world of spreaders."
Credit
Bromma
1970
Two boxes in one lift
Bromma's timeline lists its "first twin-lift spreader" in 1970, which picks up two 20-foot boxes at once. It lists a separating twin-lift spreader for Felixstowe in 1998 and its first tandem spreader, two spreaders working together under one crane, in 2003. Each step raised the number of boxes a crane can move per cycle.
Credit
Bromma, by its own account
2003
A typhoon topples cranes
Typhoon Maemi struck Busan, South Korea, in September 2003. The Korea JoongAng Daily reported that eight cranes collapsed and three were damaged, including six of the seven cranes at Singamman quay. Their builder, Hanjin Heavy Industries, said they were designed for winds of up to 50 meters per second; Maemi's winds reached 60 meters per second. Liftech Consultants, a crane engineering firm in Oakland, California, wrote in 2009 that "a single tie-down failure resulted in the subsequent collapse of five adjacent cranes." A tie-down is the steel link that anchors a parked crane to the wharf. Liftech added that it had not heard of a storm collapse anywhere "in which the crane structure failed first."
LessonA parked crane is only as safe as its tie-downs, and one crane blown loose along the rails can knock down its neighbors.
Credit
Liftech Consultants (analysis)
2010
Cranes run from an office
In a remotely operated crane, the driver works from a control room in the terminal building instead of a cab hanging high above the ship. Maritime Executive, reporting an ABB announcement in 2012, says the first remotely controlled STS crane went into commercial operation in December 2010 at Manzanillo International Terminal in Panama, developed by ABB with the terminal. By November 2015 APM Terminals' Maasvlakte II terminal in Rotterdam was working ships with eight STS cranes that have no driver's cab, and gCaptain reported it handled just under 1,000 containers in the 15-hour call of the Madison Maersk.
Credit
ABB and Manzanillo International Terminal; APM Terminals
2024
Cranes become a security question
On 21 February 2024 the White House said the President would sign an executive order on port cybersecurity and that the Coast Guard would issue a directive on cyber risk for STS cranes made in China. It also said PACECO, a US subsidiary of Japan's Mitsui E&S, intended to make port cranes in the United States "for the first time in 30 years," pending a site and partners. On 12 September 2024 two House committees reported that the Chinese maker ZPMC "accounts for nearly 80 percent of the STS cranes in operation at U.S. ports." They found that ZPMC or a contractor had installed cellular modems on cranes in service at some US ports, outside existing contracts, and that the contracts they reviewed had no terms limiting unauthorized changes or access. In November 2024 the Coast Guard issued MARSEC Directive 105-5 with more requirements for these cranes; its text goes only to port operators and crane owners.
LessonCrane buyers had written nothing into their contracts about who may connect to or change a crane after delivery.
Credit
House Committee on Homeland Security and Select Committee on the CCP; US Coast Guard
Watch for
Remote cranes at NEOM
The Port of NEOM in Saudi Arabia says it received "the first fully automated, remote-controlled ship-to-shore (STS) and electric rubber-tyred gantry (eRTG) cranes in Saudi Arabia," ahead of "the 2026 opening of Terminal 1." Operators are to run them from offices rather than crane cabs.
Achieved whenTerminal 1 works ships with these cranes from a remote station, and someone outside NEOM, such as a shipping line or trade press with figures, reports it.
Claimed by
Port of NEOM, July 2025
US duties on Chinese cranes
In October 2025 the US Trade Representative (USTR) added duties on Chinese STS cranes and other cargo-handling equipment to a Section 301 action, a US trade law used against unfair foreign practices. The action was suspended for a year from 10 November 2025, and on 9 November 2026 the suspension was extended to January 2027.
Achieved whenthe suspension ends and the duties are paid on an imported crane.
Claimed by
USTR, October 2025; suspension extended November 2026
Open
01
A register of crane collapses
A free public table of every quay-crane collapse and serious crane damage that can be sourced: storms, ships striking cranes, earthquakes, fatigue cracks and operating accidents. Each row gives the date, port, crane maker and age where known, the cause (tie-down, stowage pin, ship strike, fatigue), deaths and injuries, and links to sources.
The briefCredit · unclaimed02
Contract terms for crane buyers
A public checklist of terms a port can put in a crane purchase or service contract, such as who may connect remotely, how software updates arrive, a ban on adding radios or modems without written approval, and logs the port itself controls. Then score published crane contracts against it.
The briefCredit · unclaimed
Open 01 · the brief
A register of crane collapses
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A free public table of every quay-crane collapse and serious crane damage that can be sourced: storms, ships striking cranes, earthquakes, fatigue cracks and operating accidents. Each row gives the date, port, crane maker and age where known, the cause (tie-down, stowage pin, ship strike, fatigue), deaths and injuries, and links to sources.
Why it is still open
No public, structured list of crane collapses was found in web searches on 18 November 2026; collapses are known one news report at a time. TT Club's article on crane collisions gives no counts and says its analysis "is less driven by statistical frequency." NovaTug's accident list covers ships that lose control and offers machine-readable data only on request. Liftech's 2008 talk on quay crane accidents sorts cases into five groups (operations, transport, wind, earthquakes and structural fatigue), but it is a slide deck, not a dataset.
Built with what exists
A web-browsing agent to gather news reports, accident investigations and court records (see the Note "Deleting 80% to start over"); a document-reading AI model to fill the fields; a public GitHub repository with a written schema; Liftech's five accident groups as the first cause codes.
First step
Enter Typhoon Maemi at Busan (2003) from the Korea JoongAng Daily report and Liftech's 2009 paper, and draft the field list from Liftech's five accident groups.
Done looks like
At least 60 events from at least 15 countries since 1990, each with at least one primary or contemporary source and a cause code, with 20 rows picked at random checked by a second person, published under an open license.
Open 02 · the brief
Contract terms for crane buyers
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public checklist of terms a port can put in a crane purchase or service contract, such as who may connect remotely, how software updates arrive, a ban on adding radios or modems without written approval, and logs the port itself controls. Then score published crane contracts against it.
Why it is still open
The House committees found no provisions in the ZPMC contracts they reviewed that limit unauthorized changes to the cranes or access to them. The Coast Guard's own rules for these cranes, MARSEC Directive 105-5, contain sensitive security information and go only to port operators and crane owners, so there is no public model text.
Built with what exists
Public-records requests and the board papers of public port authorities; a document-reading AI model to tag clauses (see the Note "Seven more flagged"); a spreadsheet; a procurement lawyer's review of the final checklist.
First step
Request the crane purchase contracts approved by three public US port authorities in the last five years, and score them against a first draft of the checklist.
Done looks like
A checklist of at least 10 terms, each tied to a published source, and a table scoring at least 15 crane contracts from public port authorities, with a second reviewer agreeing on at least 90% of the scores.