BRENNEN

Industries / Construction and property / Commercial and residential construction / Plumbing

Water supply pipes

Supply piping carries clean water under pressure, hot and cold, from where the service line enters a building to every tap, shower and appliance, and keeps dirty water from flowing back into it.

7

Milestones achieved, from 1st century BCE to 2018.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1st century BCE

    Lead pipes and a warning

    Roman builders made water pipes from rolled lead sheet. The Roman architect Vitruvius, in a book on architecture written between 33 and 14 BCE by the account of the Institution of Engineering and Technology's archives, named the sizes by the width of the sheet in digits (a finger's breadth), from 10 to 100 digits, with a 10-foot length of the largest weighing 1,200 Roman pounds. He also wrote that water in earthen pipes "is more wholesome than that through lead", because lead workers turn pale and the white lead made from it is harmful. In 2014 a study of lead isotopes in the sediments of Rome's harbor found that the city's lead pipes raised the lead in its drinking water up to about 100 times above the natural level.

    LessonA pipe material can harm health for centuries before anyone measures the harm.

    penelope.uchicago.edutheiet.orgpmc.ncbi.nlm.nih.gov

    Credit

    Vitruvius, De architectura, Book VIII; isotope study by Delile, Blichert-Toft, Goiran, Keay and Albarède (PNAS, 2014)

  2. 1933

    Hotel pipes spread dysentery

    In 1933 amoebic dysentery, a gut infection caused by a parasite, broke out from two hotels in Chicago. A 1940 US Public Health Service bulletin counts 1,409 cases and 98 deaths and says the outbreak was blamed on "old and faulty piping" and "a poorly designed plumbing system". The same bulletin says it was this outbreak that made health officials, water works and the plumbing trade see the danger of badly designed plumbing. Research on back-siphonage followed: back-siphonage is dirty water being sucked back into the supply when its pressure drops. It produced formulas for the air gap, the open space between a tap's spout and the rim of the basin it fills, and tests of vacuum breakers, valves that let air in so water cannot be pulled back.

    LessonThe pipes inside one building can poison the clean water a city delivers, so every connection to a fixture must stop dirty water flowing back.

    collections.nlm.nih.gov

    Credit

    Chicago Board of Health; US Public Health Service (bulletin by Arthur B. Cronkright and Arthur P. Miller)

  3. 1940

    Sizing pipes by probability

    Roy B. Hunter of the US National Bureau of Standards published "Methods of Estimating Loads in Plumbing Systems" on 16 December 1940. It gave each kind of fixture a weight in "fixture units" and, from the probability that fixtures run at the same moment, a curve of the flow a building's pipes must carry. A 2023 report for the National Institute of Standards and Technology (NIST) explains that the curve is set so the real peak exceeds it only 1% of the time, and says it became the basis of plumbing codes in the US and other countries.

    nvlpubs.nist.govnvlpubs.nist.gov

    Credit

    Roy B. Hunter

  4. 1972

    Cross-linked plastic tubing

    PEX is polyethylene plastic whose long molecules are bonded to each other, which lets it carry hot water under pressure. The German inventor Thomas Engel patented a way to make it with a small amount of peroxide, and licensed it; Wirsbo in Sweden and REHAU in Germany both began making PEX tubing commercially in 1972, at first for heating floors. It reached North America in 1982, and by 1997 its standards were in several US plumbing codes. A builder survey by Home Innovation Research Labs found PEX in more than 60% of US residential construction in 2020, as reported by the Plastics Pipe Institute, the industry's trade body.

    phcppros.com

    Credit

    Thomas Engel; Wirsbo (later Uponor); REHAU

  5. 1995

    A plastic pipe fails

    Polybutylene plastic water pipe went into about 1 million houses and as many as 6 million mobile homes and apartments in the US in the 1970s and 1980s. Owners said it leaked when exposed to chlorine and other chemicals in tap water; Shell Oil and Hoechst Celanese, which made materials used in it, denied the pipe was faulty and blamed installation. In November 1995 Judge Mike Maloan of a state court in Union City, Tennessee, approved a settlement fund of $950 million for homes plumbed from 1 January 1978 to 1 August 1995, by the Spokesman-Review's report.

    LessonA new pipe material can go into millions of homes before its long-term behavior in real tap water is known.

    spokesman.com

    Credit

    the homeowners' lawyers, including Trial Lawyers for Public Justice; Shell Oil and Hoechst Celanese as settling parties

  6. 1999

    Five grades of backflow risk

    The Water Supply (Water Fittings) Regulations 1999, in force in England and Wales from 1 July 1999, replaced the separate byelaws of each water company with one national rule book. They sort every fluid that could flow back into the supply into five categories, from wholesome drinking water (category 1) to fluid that is a serious health hazard, such as water containing human waste (category 5). Every water system must have a device to prevent backflow, chosen to suit the highest category downstream of it. The same rules ban embedding water fittings in walls or solid floors and putting joints where they are concealed, such as in a duct or under the ground.

    legislation.gov.uklegislation.gov.uk

    Credit

    the UK Secretary of State for the Environment, Transport and the Regions and the Secretary of State for Wales

  7. 2018

    Pipe sizing for efficient fixtures

    Engineers had long found that Hunter's curve, based on fixtures of the 1930s, oversizes pipes for today's water-saving fixtures. From 2011 a task group of the International Association of Plumbing and Mechanical Officials (IAPMO), the American Society of Plumbing Engineers and the University of Cincinnati used water-use readings from nearly 1,100 homes in 62 US cities to recalibrate the method; for tank toilets, the chance of use in the peak hour fell from 20% to 1%. The result, a free spreadsheet called the Water Demand Calculator, went into Appendix M of the Uniform Plumbing Code in its 2018 and 2021 editions. It covers homes and apartment buildings only.

    LessonA sizing rule calibrated on old fixtures has to be measured again when the fixtures change.

    nvlpubs.nist.gov

    Credit

    Steven Buchberger and colleagues (University of Cincinnati); IAPMO; American Society of Plumbing Engineers; Water Quality Association

Watch for

  1. Nordic test for sleeved pipes

    In a pipe-in-tube system, the supply tubing runs inside a protective sleeve, so a leak drains to a cabinet where it can be seen instead of into the wall. Sweden's industry rules for plumbing, Säker Vatteninstallation 2026:1, require such systems and their cabinets to be approved under "Pipe in tube systems – Nordic Test method no. 1". Säker Vatten says the bodies that grant type approval are still rewriting their certification, so the requirement cannot be applied yet, and a transition rule keeps the 2021 rules for these systems until 1 January 2027.

    Achieved whenA certification body issues type approvals under the Nordic test method and Säker Vatten starts applying the requirement.

    sakervatten.se

    Claimed by

    Säker Vatten, October 2025

Open

  1. 01

    Peak water use in offices

    An open dataset of peak water flow in at least 10 non-residential buildings, such as schools, offices and dormitories, logged every second for at least three months, with each building's count of fixtures. Compare each building's measured peak with what Hunter's curve and the Water Demand Calculator would predict. Clamp-on ultrasonic flow meters fasten to the outside of the main supply pipe, so no pipe is cut and no plumbing work is done.

    The brief
    Credit · unclaimed
  2. 02

    Check press joints by photo

    An open set of labeled photos of press-fitted copper joints, pressed and unpressed, and a vision model that sorts them, so a photo taken before a wall is closed shows every joint was pressed. A press fitting is joined by squeezing it onto the pipe with a powered tool instead of soldering it. Make all joints on a dry bench and check each one by cutting it open.

    The brief
    Credit · unclaimed

Open 01 · the brief

Peak water use in offices

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open dataset of peak water flow in at least 10 non-residential buildings, such as schools, offices and dormitories, logged every second for at least three months, with each building's count of fixtures. Compare each building's measured peak with what Hunter's curve and the Water Demand Calculator would predict. Clamp-on ultrasonic flow meters fasten to the outside of the main supply pipe, so no pipe is cut and no plumbing work is done.

Why it is still open

The Water Demand Calculator covers only homes and apartments. IAPMO's Peak Water Demand Study, released in March 2025, calls for "a broad national field program to measure instantaneous peak indoor water demands" in commercial, institutional and other buildings to calibrate the method. A 2023 NIST report described a survey plan and a low-cost flow sensor, then being field-tested in one University of Cincinnati building. Fernandez, Jack and Dass (2025) fitted the method to measured flows in two non-residential buildings, and Mera-Parra and Benavides-Muñoz (2025) logged five university buildings in Loja, Ecuador, for 62 days at one-minute intervals and found that the Water Demand Calculator underestimated their peaks by up to 81.5%. This research found no open dataset that covers many such buildings.

iapmo.orgnvlpubs.nist.govdoi.orgdoi.org

Built with what exists

Clamp-on ultrasonic flow meters, or pulse readers on the building's existing water meters; a Raspberry Pi as a data logger; IAPMO's free Water Demand Calculator spreadsheet; Python for the comparison.

  1. First step

    Ask one school district's facilities office for permission to log the pulse output of the water meters at two schools, and record one week.

  2. Done looks like

    At least 10 buildings with three months each of one-second flow data released under an open license, and a table of each building's measured 99th-percentile peak against the two predictions.

Open 02 · the brief

Check press joints by photo

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open set of labeled photos of press-fitted copper joints, pressed and unpressed, and a vision model that sorts them, so a photo taken before a wall is closed shows every joint was pressed. A press fitting is joined by squeezing it onto the pipe with a powered tool instead of soldering it. Make all joints on a dry bench and check each one by cutting it open.

Why it is still open

Since 1 July 2012 Sweden's industry rules have required press fittings to be built so that an unpressed fitting leaks during a tightness test, held at 3 bar for at least 30 minutes while a person inspects every joint by eye. The check depends on a person looking at every joint at the right moment. Milwaukee's M18 Force Logic press tool logs and uploads data from every press it makes, but a log does not show which fitting in a wall was left unpressed. This research found no published image set or vision model for plumbing press joints; machine-vision work on "press-fit" parts covers electronic connector pins.

sakervatten.semilwaukeetool.com

Built with what exists

Copper tube offcuts and press fittings from two makers; a rented battery press tool; a phone camera; an open object detector such as YOLO, or a vision-language model; a hacksaw or band saw to section joints for the answer key.

  1. First step

    Make 30 pressed and 30 unpressed joints on a bench and photograph each from four sides before cutting it open.

  2. Done looks like

    At least 1,000 labeled photos released under an open license, and a test on 100 new joints, a third of them unpressed, with a published count of joints the model passed that sectioning showed were not pressed.