Asphalt paving

Asphalt paving spreads hot mix from the delivery trucks into an even layer of set width, thickness and slope, ready for the rollers.

4

Milestones achieved, from 1931 to 2018.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1931

    A machine lays the mix

    Before pavers, crews spread hot mix by hand between side forms and smoothed it with a screed, a straight bar dragged across the surface. Harry H. Barber of the Barber-Greene Company in Aurora, Illinois, built a machine that mixed and placed asphalt in one pass, first shown at the 1931 Road Show in St. Louis; the company then split the work into separate mixing plants and pavers. Its floating screed, a heavy plate towed behind the paver that rides on the fresh mix and finds its own level, and a tamper bar that evens out density were the two features that made it work. A 2016 trade history gives 1933 for the floating screed in one passage and 1934 in another, and makers still build pavers around a floating screed.

    aem.orgforconstructionpros.com

    Credit

    Harry H. Barber, Barber-Greene Company

  2. 1989

    Remixing between truck and paver

    A material transfer vehicle (MTV) stands between the haul trucks and the paver. It takes each load, remixes it in a bin and feeds the paver, so trucks never bump the paver and the mix that went cold on top of the load is stirred back in. Astec Industries says it introduced the first, the Shuttle Buggy, in 1989. When the Washington State Department of Transportation (WSDOT) filmed new mats with an infrared camera in 1999, mats laid straight from end-dump trucks averaged a temperature differential, the gap between the coolest spot and the mat around it, of 56 °F (31 °C) on 7 projects; with a Shuttle Buggy the average was 10 °F (about 6 °C) on 5 projects.

    forconstructionpros.comwsdot.wa.gov

    Credit

    Astec Industries and its paving unit Roadtec

  3. 2001

    Cold spots, not separated stone

    Weak patches in new asphalt were often blamed on segregation, the coarse stone separating from the fine. WSDOT and University of Washington researchers sampled the cool patches that an infrared camera found behind the paver in 1998: they had more air voids than the mat around them, but no significant segregation of the stone. In 2000 they took 69 density profiles, rows of density readings along the mat, on 17 projects. Where the mat had a cool patch of 25 °F (14 °C) or more, 89% of the profiles failed their density criteria; where the differential was smaller, 80% passed.

    Lessonmuch of the low density that was put down to the mix came from heat lost before the rollers reached it.

    wsdot.wa.gov

    Credit

    Kim Willoughby, Joe Mahoney, Linda Pierce, Jeff Uhlmeyer, Keith Anderson, Steven Read, Stephen Muench, Travis Thompson and Robyn Moore (WSDOT, University of Washington and consultants)

  4. 2018

    Heat maps behind the paver

    A paver-mounted thermal profiler (PMTP) is a bar of infrared sensors on the back of the paver that records the surface temperature across the full width of fresh mat, tied to position, so the whole job becomes a temperature map. The AASHTO standard PP 80 sets how such maps are graded. The Minnesota Department of Transportation (MnDOT) has used profilers as routine practice on its asphalt projects since 2018. It now specifies one on contracts of 2 miles (3.2 km) or more, about 90 highway projects a year, with the data filed through Veta, free software from a pooled-fund study of several states. FHWA lists the profiler as current practice in 12 states and its own Eastern Federal Lands office, and puts the cost at about $35,000.

    fhwa.dot.govfhwa.dot.gov

    Credit

    MnDOT; AASHTO; FHWA's Mobile Asphalt Technology Center

Watch for

  1. Transfer vehicles raise output

    Vance Corporation, a paving contractor in Beaumont, California, says running a Shuttle Buggy raised its production by more than 20%, because the paver no longer waits on trucks. In the same article Astec gives a worked example for a 10-hour day of 2,400 tons, 20-ton trucks, a 10-mile haul and trucks at $60 an hour: 14 trucks without an MTV and 10 with one, cutting trucking cost from $3.30 to $2.40 a ton. These are the contractor's own figure and the maker's own arithmetic, in an article published under Astec's name.

    Achieved whena highway agency or an independent study measures tons per hour, trucks used and cost per ton on matched jobs paved with and without an MTV.

    forconstructionpros.com

    Claimed by

    Vance Corporation and Astec Industries, October 2026

Open

  1. 01

    Transfer vehicles, retested at scale

    A comparison, across at least 100 recent paving projects that have thermal profiler records, of how much of each mat was cold when the mix came from a material transfer vehicle, from a windrow elevator (a machine that picks up mix dumped in a row on the road) or straight from trucks.

    The brief
    Credit · unclaimed
  2. 02

    Revisit Washington's cold-spot roads

    A follow-up of the 17 highway projects that WSDOT measured in 2000 and the four it measured in 1998, finding when each was next resurfaced and testing whether the projects with larger temperature differentials and density ranges wore out sooner.

    The brief
    Credit · unclaimed

Open 01 · the brief

Transfer vehicles, retested at scale

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A comparison, across at least 100 recent paving projects that have thermal profiler records, of how much of each mat was cold when the mix came from a material transfer vehicle, from a windrow elevator (a machine that picks up mix dumped in a row on the road) or straight from trucks.

Why it is still open

The measured comparisons found are small and use spot thermal images, not full-mat maps. WSDOT's of 1999 rested on 5 Shuttle Buggy, 7 end-dump and 13 windrow elevator projects in one state. Colorado's of 2005, by Kim Gilbert, found end-dump paving without a transfer device prone to cold spots and windrow elevators about as good as transfer devices. Louisiana's, on seven projects from 2014 to 2017, found that an MTV made mat temperatures more even. Profilers now map whole mats on about 90 MnDOT projects a year, yet MnDOT still lists building "an archive of thermal information" as a goal rather than something done.

wsdot.wa.govrosap.ntl.bts.govrosap.ntl.bts.govfhwa.dot.gov

Built with what exists

Profiler data exported from Veta or the vendors' software; the AASHTO PP 80 severity categories; project diaries or equipment lists obtained through public records requests; Python with pandas; a small extraction model such as Muse Ember (see the Note "The jobs agents repeat") to pull equipment lists from scanned diaries, checked by hand on a sample of 50.

  1. First step

    Ask MnDOT for the Veta files and daily paving diaries of ten 2025 projects and tag each one by delivery method.

  2. Done looks like

    100 projects from at least two states, each tagged by how mix reached the paver, with the share of mat in each PP 80 severity category by delivery method and by haul time, and the data and code published.

Open 02 · the brief

Revisit Washington's cold-spot roads

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A follow-up of the 17 highway projects that WSDOT measured in 2000 and the four it measured in 1998, finding when each was next resurfaced and testing whether the projects with larger temperature differentials and density ranges wore out sooner.

Why it is still open

The 2001 report said that "it is early in the life of these pavements and the full extent of the potential distress (or performance) is uncertain", and that results of a March 2001 visual survey would follow. Searches of the Crossref index of journal papers and of the US transportation research repository found no later follow-up of these projects; a 2026 study of six FHWA demonstration projects compared profiler maps with density, not with later wear.

wsdot.wa.govdoi.org

Built with what exists

The report's Appendix C, which lists each 2000 contract by state route, begin and end milepost and paving date; WSDOT's public pavement map service, whose Preservation Units layer gives an average last-resurfacing date by route and milepost; Python with GeoPandas; a public records request for the pavement management history where a road has been resurfaced more than once since 2000.

  1. First step

    Look up contract 5906, Interstate 90 from milepost 55.52 to 67.31, paved on September 20, 2000, in WSDOT's Preservation Units layer and record its last resurfacing date.

    data.wsdot.wa.gov

  2. Done looks like

    For at least 15 of the 17 contracts from 2000, a published table of paving date, next resurfacing date, average temperature differential and density range, with a rank correlation between pavement life and temperature differential, and every lookup reproducible from public data or released records.