Industries / Energy, water and waste / Oil and gas extraction / Offshore drilling

Rigs and drillships

This is the design and running of the movable platforms and ships that carry a drilling rig out to sea, from barges that stand on the seabed to ships that float over wells in deep ocean water.

5

Milestones achieved, from 1954 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1954

    Legs that lift the hull

    A jack-up is a barge with legs that it lowers to the seabed and then climbs, lifting its hull clear of the waves so it can drill from a steady base. The American Oil & Gas Historical Society says Zapata signed the contract for the first jack-up oil rig in 1954, to R. G. LeTourneau's design, and that LeTourneau's first jack-up, Scorpion, was launched from a Vicksburg shipyard in 1955. A 1997 Offshore magazine history says The Offshore Company also contracted in 1954 for a DeLong barge fitted for drilling, rated for 40 ft of water, and that the three-legged LeTourneau design was later rated for 250 ft.

    aoghs.orgoffshore-mag.com

    Credit

    R. G. LeTourneau; Zapata; The Offshore Company

  2. 1962

    A rig that floats

    Shell naval architect Bruce Collipp led the conversion of Blue Water 1, a rig built to sit on the bottom, into one that floats partly submerged on columns, held in place by eight anchors. This type is called a semisubmersible. In January 1962 it spudded a record well in 297 ft (91 m) of water in the Gulf of Mexico, and it was designed to work in 600 ft without touching the bottom. Collipp and his Shell colleague Dee DeVries later received the American Society of Mechanical Engineers' Holley Medal, according to Offshore magazine.

    offshore-mag.com

    Credit

    Bruce Collipp (Shell); Blue Water Drilling

  3. 1968

    Drilling the deep ocean

    Glomar Challenger, christened by Global Marine and equipped by Scripps Institution of Oceanography, was ready to sail by mid-1968 for the US Deep Sea Drilling Project. On its first leg it drilled into the caprock of a salt dome under 3,572 m of water. On its third leg, across the South Atlantic, the ages of the bottom sediments matched those predicted from the magnetic record of the seafloor, which a National Academies history says moved seafloor spreading "from hypothesis to ruling theory."

    nationalacademies.org

    Credit

    Global Marine; Scripps Institution of Oceanography; US National Science Foundation

  4. 2020

    Young drillships scrapped

    In a long slump in demand for offshore rigs, owners sent drillships to the scrapyard at an average age of 9.2 years in 2020 (through October), against about 36 years for jack-ups and about 27 for semisubmersibles, by the count of Westwood Global Energy Group's RigLogix service. Four of the five drillships retired that year were 10 years old or younger. Three of them, Valaris DS-3, DS-5 and DS-6, had been built in 2010 to 2012 for $720 million to $745 million each.

    Lessona rig ordered at the top of a boom can be worth more as scrap than idle long before it wears out.

    jpt.spe.org

    Credit

    Westwood Global Energy Group (count); owners including Valaris and Noble

  5. 2024

    A 20,000 psi drillship

    Chevron's Anchor field in the US Gulf of Mexico has wells with maximum working pressures above 15,000 pounds per square inch (psi), so Transocean's drillship Deepwater Titan was built with a blowout preventer rated to 20,000 psi and a hookload (the weight its derrick can lift) of 3 million lb, against a standard 2.5 million lb. Chevron started production from the first Anchor well in August 2024. Oil & Gas Journal calls Anchor the first deepwater high-pressure, high-temperature development with equipment rated to 20,000 psi.

    ogj.com

    Credit

    Transocean; Chevron

Watch for

  1. Robot arms on drill floors

    NOV says its rig-floor robot package, built around its ATOM RTX arms and first designed to copy a land rig's pipe handling, is running or contracted for delivery on one jack-up and nine drillships. Offshore, the arms do not handle pipe; they apply thread grease ("dope") to pipe connections and contain spilled drilling mud, jobs for which people still step into the "red zone" around moving pipe. No rigs, operators or results are named.

    Achieved whena drilling contractor or operator publishes how many tasks the robots did offshore and how much red-zone time they removed, or a regulator reports it.

    drillingcontractor.org

    Claimed by

    NOV, August 2025 (reported by Drilling Contractor)

  2. One system runs the rig

    Halliburton says it made the industry's first deployment of integrated closed-loop rig automation together with managed pressure drilling, on a deepwater exploration well for Eni off Indonesia. One software system coordinated drill-floor equipment, well steering, downhole hydraulics and pressure control, and the companies report drilling efficiency improved by more than 15%. The rig, the dates and the baseline are not given.

    Achieved whenEni or another party outside Halliburton publishes the measured gain, or the system is used as routine on later wells.

    worldoil.com

    Claimed by

    Halliburton, July 2026

Open

  1. 01

    Drilling days from ship tracks

    Open code that reads public ship-position records (AIS, the position reports ships broadcast by radio) and works out when each mobile rig arrived at a well and when it left. It is tested first where official records name the rig and its dates, so that it can then measure rig activity in waters where no well records are public.

    The brief
    Credit · unclaimed
  2. 02

    A drill floor in simulation

    An open, simulated drill floor holding the jobs robots now do offshore, such as greasing pipe threads and fitting a mud bucket around a connection, so robot software can be trained and scored without going near a rig.

    The brief
    Credit · unclaimed

Open 01 · the brief

Drilling days from ship tracks

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

Open code that reads public ship-position records (AIS, the position reports ships broadcast by radio) and works out when each mobile rig arrived at a well and when it left. It is tested first where official records name the rig and its dates, so that it can then measure rig activity in waters where no well records are public.

Why it is still open

The published AIS work on the US Gulf of Mexico counts service-vessel arrivals and departures, not rig time on wells. Global Fishing Watch's open map of offshore structures from radar satellite images keeps only objects that stay put through six-month composites, so it is built for fixed platforms, not for rigs that move between wells. The test data is public: Norway's FactPages give the rig name, start date, end date and drilling days for each exploration wellbore, 743 of them drilled from mobile rigs since 2010 by a count made for this file, and the Norwegian Coastal Administration says its historical AIS data, gathered by shore stations and its own satellites, is "searchable and universally accessible."

ideas.repec.orgnature.comfactpages.sodir.nokystverket.no

Built with what exists

Norway's historical AIS (kystdatahuset.no); the FactPages exploration wellbore table; for a second test in US waters, NOAA and BOEM's MarineCadastre AIS files and the US regulator BSEE's borehole table of spud and total-depth dates; Python with pandas and GeoPandas.

coast.noaa.govdata.bsee.gov

  1. First step

    Take five rigs named in the FactPages table, download one month of their Norwegian AIS tracks, and check whether the tracks stop at the listed wellbores on the listed dates.

  2. Done looks like

    For at least 300 Norwegian exploration wellbores drilled from mobile rigs since 2010, the method finds the rig named in FactPages at the wellbore, and its on-location window starts and ends within 3 days of the FactPages entry and completion dates in at least 90% of cases, with code, the matched table and every miss published.

Open 02 · the brief

A drill floor in simulation

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open, simulated drill floor holding the jobs robots now do offshore, such as greasing pipe threads and fitting a mud bucket around a connection, so robot software can be trained and scored without going near a rig.

Why it is still open

Robot arms are going offshore to grease threads and contain mud because people still enter the red zone for those jobs, Drilling Contractor reported in August 2025, but the report names no public test or results. In 2013 Robotic Drilling Systems of Stavanger said its prototype drill-floor robot could act as its own simulator for training crews and testing new jobs, but that simulator is part of the company's product, not a shared test. An arXiv search for "drill floor" in November 2026 returned no papers, and GitHub searches found no such simulation.

drillingcontractor.orgoffshore-mag.com

Built with what exists

MuJoCo or NVIDIA Isaac Sim; published drill pipe and tool-joint dimensions; open robot models that learn a task from a few demonstrations (see the Note "Five demonstrations per task"; see the Note "Open robot model weights").

  1. First step

    Model a drill pipe tool joint and a six-axis arm in MuJoCo and script one full doping pass over the threads.

  2. Done looks like

    Three tasks (dope a pin thread, place and latch a mud bucket, wipe a box thread clean), each run 500 times with random pipe positions and lighting, with a scripted baseline and one learned policy scored on success rate and seconds per task, and a second group reproducing the scores within 5 percentage points.