Industries / Energy, water and waste / Oil and gas extraction / Offshore drilling
Rigs and drillships
This is the design and running of the movable platforms and ships that carry a drilling rig out to sea, from barges that stand on the seabed to ships that float over wells in deep ocean water.
5
Milestones achieved, from 1954 to 2024.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1954
Legs that lift the hull
A jack-up is a barge with legs that it lowers to the seabed and then climbs, lifting its hull clear of the waves so it can drill from a steady base. The American Oil & Gas Historical Society says Zapata signed the contract for the first jack-up oil rig in 1954, to R. G. LeTourneau's design, and that LeTourneau's first jack-up, Scorpion, was launched from a Vicksburg shipyard in 1955. A 1997 Offshore magazine history says The Offshore Company also contracted in 1954 for a DeLong barge fitted for drilling, rated for 40 ft of water, and that the three-legged LeTourneau design was later rated for 250 ft.
Credit
R. G. LeTourneau; Zapata; The Offshore Company
1962
A rig that floats
Shell naval architect Bruce Collipp led the conversion of Blue Water 1, a rig built to sit on the bottom, into one that floats partly submerged on columns, held in place by eight anchors. This type is called a semisubmersible. In January 1962 it spudded a record well in 297 ft (91 m) of water in the Gulf of Mexico, and it was designed to work in 600 ft without touching the bottom. Collipp and his Shell colleague Dee DeVries later received the American Society of Mechanical Engineers' Holley Medal, according to Offshore magazine.
Credit
Bruce Collipp (Shell); Blue Water Drilling
1968
Drilling the deep ocean
Glomar Challenger, christened by Global Marine and equipped by Scripps Institution of Oceanography, was ready to sail by mid-1968 for the US Deep Sea Drilling Project. On its first leg it drilled into the caprock of a salt dome under 3,572 m of water. On its third leg, across the South Atlantic, the ages of the bottom sediments matched those predicted from the magnetic record of the seafloor, which a National Academies history says moved seafloor spreading "from hypothesis to ruling theory."
Credit
Global Marine; Scripps Institution of Oceanography; US National Science Foundation
2020
Young drillships scrapped
In a long slump in demand for offshore rigs, owners sent drillships to the scrapyard at an average age of 9.2 years in 2020 (through October), against about 36 years for jack-ups and about 27 for semisubmersibles, by the count of Westwood Global Energy Group's RigLogix service. Four of the five drillships retired that year were 10 years old or younger. Three of them, Valaris DS-3, DS-5 and DS-6, had been built in 2010 to 2012 for $720 million to $745 million each.
Lessona rig ordered at the top of a boom can be worth more as scrap than idle long before it wears out.
Credit
Westwood Global Energy Group (count); owners including Valaris and Noble
2024
A 20,000 psi drillship
Chevron's Anchor field in the US Gulf of Mexico has wells with maximum working pressures above 15,000 pounds per square inch (psi), so Transocean's drillship Deepwater Titan was built with a blowout preventer rated to 20,000 psi and a hookload (the weight its derrick can lift) of 3 million lb, against a standard 2.5 million lb. Chevron started production from the first Anchor well in August 2024. Oil & Gas Journal calls Anchor the first deepwater high-pressure, high-temperature development with equipment rated to 20,000 psi.
Credit
Transocean; Chevron
Watch for
Robot arms on drill floors
NOV says its rig-floor robot package, built around its ATOM RTX arms and first designed to copy a land rig's pipe handling, is running or contracted for delivery on one jack-up and nine drillships. Offshore, the arms do not handle pipe; they apply thread grease ("dope") to pipe connections and contain spilled drilling mud, jobs for which people still step into the "red zone" around moving pipe. No rigs, operators or results are named.
Achieved whena drilling contractor or operator publishes how many tasks the robots did offshore and how much red-zone time they removed, or a regulator reports it.
Claimed by
NOV, August 2025 (reported by Drilling Contractor)
One system runs the rig
Halliburton says it made the industry's first deployment of integrated closed-loop rig automation together with managed pressure drilling, on a deepwater exploration well for Eni off Indonesia. One software system coordinated drill-floor equipment, well steering, downhole hydraulics and pressure control, and the companies report drilling efficiency improved by more than 15%. The rig, the dates and the baseline are not given.
Achieved whenEni or another party outside Halliburton publishes the measured gain, or the system is used as routine on later wells.
Claimed by
Halliburton, July 2026
Open
01
Drilling days from ship tracks
Open code that reads public ship-position records (AIS, the position reports ships broadcast by radio) and works out when each mobile rig arrived at a well and when it left. It is tested first where official records name the rig and its dates, so that it can then measure rig activity in waters where no well records are public.
The briefCredit · unclaimed02
A drill floor in simulation
An open, simulated drill floor holding the jobs robots now do offshore, such as greasing pipe threads and fitting a mud bucket around a connection, so robot software can be trained and scored without going near a rig.
The briefCredit · unclaimed
Open 01 · the brief
Drilling days from ship tracks
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Open code that reads public ship-position records (AIS, the position reports ships broadcast by radio) and works out when each mobile rig arrived at a well and when it left. It is tested first where official records name the rig and its dates, so that it can then measure rig activity in waters where no well records are public.
Why it is still open
The published AIS work on the US Gulf of Mexico counts service-vessel arrivals and departures, not rig time on wells. Global Fishing Watch's open map of offshore structures from radar satellite images keeps only objects that stay put through six-month composites, so it is built for fixed platforms, not for rigs that move between wells. The test data is public: Norway's FactPages give the rig name, start date, end date and drilling days for each exploration wellbore, 743 of them drilled from mobile rigs since 2010 by a count made for this file, and the Norwegian Coastal Administration says its historical AIS data, gathered by shore stations and its own satellites, is "searchable and universally accessible."
Built with what exists
Norway's historical AIS (kystdatahuset.no); the FactPages exploration wellbore table; for a second test in US waters, NOAA and BOEM's MarineCadastre AIS files and the US regulator BSEE's borehole table of spud and total-depth dates; Python with pandas and GeoPandas.
First step
Take five rigs named in the FactPages table, download one month of their Norwegian AIS tracks, and check whether the tracks stop at the listed wellbores on the listed dates.
Done looks like
For at least 300 Norwegian exploration wellbores drilled from mobile rigs since 2010, the method finds the rig named in FactPages at the wellbore, and its on-location window starts and ends within 3 days of the FactPages entry and completion dates in at least 90% of cases, with code, the matched table and every miss published.
Open 02 · the brief
A drill floor in simulation
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open, simulated drill floor holding the jobs robots now do offshore, such as greasing pipe threads and fitting a mud bucket around a connection, so robot software can be trained and scored without going near a rig.
Why it is still open
Robot arms are going offshore to grease threads and contain mud because people still enter the red zone for those jobs, Drilling Contractor reported in August 2025, but the report names no public test or results. In 2013 Robotic Drilling Systems of Stavanger said its prototype drill-floor robot could act as its own simulator for training crews and testing new jobs, but that simulator is part of the company's product, not a shared test. An arXiv search for "drill floor" in November 2026 returned no papers, and GitHub searches found no such simulation.
Built with what exists
MuJoCo or NVIDIA Isaac Sim; published drill pipe and tool-joint dimensions; open robot models that learn a task from a few demonstrations (see the Note "Five demonstrations per task"; see the Note "Open robot model weights").
First step
Model a drill pipe tool joint and a six-axis arm in MuJoCo and script one full doping pass over the threads.
Done looks like
Three tasks (dope a pin thread, place and latch a mud bucket, wipe a box thread clean), each run 500 times with random pipe positions and lighting, with a scripted baseline and one learned policy scored on success rate and seconds per task, and a second group reproducing the scores within 5 percentage points.