Industries / Mining and materials / Mining and quarrying
Loading and hauling
Loading and hauling digs up broken rock and moves it out of the mine by truck, train, conveyor or underground loader.
4
Milestones achieved, from 1835 to 2019.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1835
The steam shovel
William Otis built a steam-powered shovel that used the basic principles of the modern cable shovel, at a time when earth was moved by hand and by mules. The Association of Equipment Manufacturers says he invented it in 1835, at 22, and put it to work building the Boston and Providence railroad that year; he received a patent for a shovel design in 1839.
Credit
William Smith Otis
2008
Driverless haul trucks
Komatsu's FrontRunner autonomous haulage system had its first commercial deployment at Codelco's Gabriela Mistral copper mine in Chile in 2008, by Komatsu's account. In 2023 Codelco said the mine had hauled more than 1 billion tons with a fully autonomous fleet of 20 trucks, without a fatality or a serious accident.
Credit
Komatsu (system); Codelco (operator)
2018
Driverless heavy-haul trains
Australia's Office of the National Rail Safety Regulator accredited Rio Tinto to run its AutoHaul iron ore trains autonomously in the Pilbara. The network is 1,700 km long and links 16 mines to four port terminals. By early 2018, about 65% of train kilometres already ran in autonomous mode, by Rio Tinto's figure.
Credit
Rio Tinto
2019
Driverless trucks collide
At BHP's Jimblebar mine in Western Australia, an empty autonomous truck lost grip in a sudden storm and slid into the path of a loaded one, weeks after a slow-speed collision between autonomous trucks at a Fortescue mine in February 2019. No one was hurt. BHP had not applied speed limits to the autonomous fleet because the weather came on fast, and the state regulator issued an improvement notice. In 2025 the regulator reported two autonomous trucks that drove off as operators tried to board them after a wireless network failure.
LessonDriverless fleets need weather rules and recovery procedures as strict as those for staffed ones.
Credit
Reported by the Western Australian mines regulator
Watch for
Battery-electric haul trucks
BHP, Rio Tinto and Caterpillar say two Cat 793 XE battery-electric haul trucks have run more than 100 hours and over 200 test laps at BHP's Jimblebar iron ore mine, after safety checks at Caterpillar's proving ground in Tucson. Charging the trucks while they move is to be tested next.
Achieved whenbattery-electric trucks work in a production fleet, with energy use and availability reported by the mine or an independent party.
Claimed by
BHP, Rio Tinto and Caterpillar, June 2026
Open
01
Robot loading of broken rock
A loader that fills its bucket from a pile of broken rock without a driver, built on a scale model or a compact machine and tested in a yard, not in a mine.
The briefCredit · unclaimed02
Incident reports as tests
A public library that turns each published incident with driverless mine trucks into a repeatable simulation test, so control software can be checked against cases that have already happened.
The briefCredit · unclaimed
Open 01 · the brief
Robot loading of broken rock
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A loader that fills its bucket from a pile of broken rock without a driver, built on a scale model or a compact machine and tested in a yard, not in a mine.
Why it is still open
Loading broken rock "remains a challenge to automate", and a study by Algoryx, Epiroc and Umeå University showed a learned controller filling the bucket of an underground loader only in a simulator.
Built with what exists
A physics simulator such as AGX Dynamics or NVIDIA Isaac Sim; a depth camera and force sensors; ROS 2; a 1:14 scale hydraulic loader or a hired compact wheel loader; LeRobot for recording demonstrations and training (the note "No download" covers LeRobot v0.7.0).
First step
Build the pile and record 50 loading cycles by a human driver, with the weight of each bucket, as the baseline.
Done looks like
100 loading cycles in a row with no driver, from a pile of crushed rock, with average bucket fill, measured by weight, at least 80% of what a skilled driver achieves on the same pile, filmed and published.
Open 02 · the brief
Incident reports as tests
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public library that turns each published incident with driverless mine trucks into a repeatable simulation test, so control software can be checked against cases that have already happened.
Why it is still open
Regulators publish these incidents one report at a time. Western Australia's report 286 describes two driverless trucks that moved off as operators tried to board them after a network failure. For road cars, researchers have built test scenarios from crash reports (the 2024 SoVAR study), but a search for this brief found no such library for mine trucks.
Built with what exists
Regulators' incident reports; a large language model such as Claude to draft scenario files from report text; the OpenSCENARIO file format; an open simulator such as CARLA.
First step
Collect the Western Australian incident reports that involve autonomous equipment and list each one's trigger, vehicles and outcome in a table.
Done looks like
Every public incident report on driverless haulage from the Western Australian regulator turned into a test, each reviewed by a mining engineer, with the library and a pass-or-fail runner released under an open licence.