This is the choice and running of the machines inside a microgrid that make or store electricity: engines and turbines, fuel cells, solar panels, batteries and, increasingly, vehicles.
5
Milestones achieved, from 2010 to 2022.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2010
A campus that powers itself
UC San Diego's cogeneration plant, a gas-turbine plant whose waste heat is used to heat and cool buildings, ran at a net efficiency of 66% and over a year supplied 85% of the campus's electricity and 95% of its heating and cooling, POWER magazine reported in November 2010. Chilled water made overnight, when power demand is low, is kept in a 3.8 million gallon storage tower for daytime air conditioning. The campus said it paid about $8 million less to utilities than before the plant, and the plant was one of three 2010 Energy Star combined heat and power award winners.
Lessoncampus steam lines laid from the start made adding cogeneration much easier.
Credit
UC San Diego (John Dilliott, Byron Washom); Solar Turbines
2013
Fuel cells as main power
eBay's data centre in South Jordan, Utah, went live on 26 September 2013 with 30 Bloom Energy fuel cell units, running on natural gas, as the primary power for its entire computing load and the utility grid as backup, in place of diesel generators and battery backup units. Data centres that used Bloom units before, such as Apple's, had used them only as a supplement.
Credit
eBay (Dean Nelson); Bloom Energy
2015
Sun and batteries only
Green Mountain Power's Stafford Hill solar farm in Rutland, Vermont, built on a former landfill, pairs 2.5 MW of solar panels with 4 MW, 3.4 MWh of batteries (2 MW lithium-ion and 2 MW lead-acid). It can disconnect from the grid to power the emergency shelter at Rutland High School. The Department of Energy describes it, Clean Energy Group reports, as the first microgrid powered only by solar and batteries, with no other fuel. On 12 August 2016 the utility used it to cut its demand in New England's peak hour, which it says saved customers about $200,000 in that hour.
Credit
Green Mountain Power, groSolar, Dynapower; Sandia National Laboratories, DOE Office of Electricity, Vermont Department of Public Service, Clean Energy States Alliance
2020
CHP runs below its estimates
Combined heat and power (CHP) plants, engines or turbines whose waste heat is put to use, held the most operating capacity of any kind of generation in US microgrids in the Department of Energy's microgrid database in 2021. An evaluation for NYSERDA, New York's energy research agency, used hourly meter data from NYSERDA's public database to check 57 CHP systems it had helped pay for, completed from 2016 to 2018. For 52 of them the electricity actually made was 67% of what the projects had claimed, and for the other five 84%, because the machines ran at a lower capacity factor (output as a share of what they would make at full power all year) than expected; the heat put to use came out above the claims, which had been conservative.
Lessonthe hours a plan says an on-site plant will run are a forecast, and meters on the machine are what test it.
Credit
West Hill Energy & Computing, for NYSERDA
2022
A bus depot's own grid
Montgomery County, Maryland, opened the Brookville Smart Energy Depot on 31 October 2022: solar canopies, a battery, natural gas generators and 4.14 MW of chargers for up to 70 electric buses, able to keep charging buses through a long grid outage. AlphaStruxure, a venture of Schneider Electric and the Carlyle fund, built and owns it, and the county pays for power and resilience monthly over 25 years instead of paying up front. The Federal Highway Administration lists 2 MW of solar, a 4.3 MWh battery and 2 MW of gas generation. The buses' own batteries are not used as storage.
Credit
Montgomery County Department of General Services; AlphaStruxure; Arup (electrical design); SunPower, Dynapower, The Mobility House, Heliox
Watch for
Hydrogen backs up a town
PG&E and Energy Vault say the Calistoga Resiliency Center in California, a 293 MWh system in which hydrogen fuel cells, fed from a 130-foot liquid hydrogen tank, charge lithium-ion batteries, can carry the town for at least 48 hours in a public safety power shutoff, when the utility cuts power to lower wildfire risk. It replaces a diesel generator PG&E had brought in for 2019 and 2020. By October 2025 the town had not yet needed it, and PG&E said it did not expect to replace its other diesel generators with fuel cells.
Achieved whenthe centre carries Calistoga through a real shutoff and PG&E or an outside party publishes the hours run and energy delivered.
Claimed by
PG&E (Jeremy Donnell) and Energy Vault, September 2025
Fuel cells as a bridge
Ohio's utility regulator approved AEP Ohio's plan to install Bloom Energy fuel cells on natural gas at data centres run by Amazon Web Services and Cologix, so they can expand before the grid catches up; AEP says transmission will take 7 to 10 years. The data centres pay under contracts of 6 years (AWS) and 15 years (Cologix). It is the first project under AEP's November 2024 agreement to buy up to 1 GW of Bloom fuel cells.
Achieved whenboth sites' fuel cells run at their stated capacity and a regulator filing or an outside party reports their output and availability for a year.
Claimed by
AEP Ohio and Bloom Energy, May and June 2025
Open
01
Planning defaults against meters
For the engine-driven CHP systems in NYSERDA's public performance database, a table of measured electric efficiency at each level of load, hours spent shut down, and the lowest load each unit actually ran at, set beside the defaults that NREL's REopt planning model assumes for the same kind and size of engine: full-load electric efficiency, minimum turndown (the lowest share of full power it may run at) and unavailable periods.
The briefCredit · unclaimed02
Parked buses as depot backup
An open model, run against a real bus timetable, of how many hours each night a depot's parked electric buses could carry the depot's essential load in an outage while leaving each bus enough charge for its morning run, and how much stationary battery that would replace.
The briefCredit · unclaimed
Open 01 · the brief
Planning defaults against meters
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
For the engine-driven CHP systems in NYSERDA's public performance database, a table of measured electric efficiency at each level of load, hours spent shut down, and the lowest load each unit actually ran at, set beside the defaults that NREL's REopt planning model assumes for the same kind and size of engine: full-load electric efficiency, minimum turndown (the lowest share of full power it may run at) and unavailable periods.
Why it is still open
NYSERDA's 2020 evaluation used the same meter data to test projects' own savings claims, not the defaults built into planning tools. The database publishes fuel used, capacity factor and electric efficiency project by project, downloadable as CSV, and REopt.jl's defaults file sets efficiency, turndown and downtime for each engine size class. No comparison of the two was found.
Built with what exists
CSV downloads from the NYSERDA DER Integrated Data System; REopt.jl's chp_defaults.json; Python with pandas. Data only; nobody visits or touches a plant.
First step
Download a year of data for 10 engine-driven CHP sites and check which ones log fuel and electricity at the same interval.
Done looks like
At least 30 engines with a year of data each; for each REopt size class, the measured median full-load electric efficiency beside the default and the share of running hours spent below the default minimum turndown, with code published and a second analyst rerunning it to the same numbers.
Open 02 · the brief
Parked buses as depot backup
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open model, run against a real bus timetable, of how many hours each night a depot's parked electric buses could carry the depot's essential load in an outage while leaving each bus enough charge for its morning run, and how much stationary battery that would replace.
Why it is still open
Brookville relies on a stationary battery and generators, not its buses. Bus-to-building work so far powers one public building, such as a library in the V2B Oakland project funded in 2022, and a California Energy Commission project page says most demonstrations power one building from one vehicle; its multi-vehicle platform was due to be installed in the first half of 2026. A 2024 depot design study by Verbrugge, Geury and Hegazy sized solar and stationary storage only, and a 2025 Pacific Northwest National Laboratory paper looked at school buses powering schools, not transit depots.
Built with what exists
A transit agency's public GTFS timetable feed; bus battery capacities from makers' spec sheets; REopt.jl or Python for the energy balance. No work on real buses or chargers.
First step
Download one agency's GTFS feed, find each bus's last arrival and first departure at the depot, and estimate the charge each bus would hold overnight.
Done looks like