An import terminal unloads LNG from ships, stores it, warms it back into gas, often with seawater, and sends the gas into pipelines.

6

Milestones achieved, from 1964 to 2022.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1964

    Canvey Island takes regular cargoes

    The Methane Pioneer's first cargo, in 1959, went to Canvey Island in England. On 12 October 1964 the Methane Princess delivered there the first commercial cargo from Algeria's new CAMEL liquefaction plant at Arzew, which ConocoPhillips says opened sustained LNG trade between Algeria and Britain.

    conocophillips.com

    Credit

    Conch International Methane, which commissioned the ships; the CAMEL plant at Arzew

  2. 1969

    Japan burns LNG for power

    In March 1967 Tokyo Electric Power (now JERA) and Tokyo Gas, with Mitsubishi as their buying agent, agreed to buy LNG from Phillips Petroleum and Marathon Oil in Alaska. The first cargo reached Japan in November 1969 aboard Polar Alaska, at the Negishi terminal in Yokohama, shared by Tokyo Gas and Tokyo Electric's Minami Yokohama power station. The Alaska plant at Kenai shipped about 1,300 cargoes to Japan between 1969 and 2011, the US Energy Information Administration says.

    jera.co.jpeia.gov

    Credit

    Tokyo Electric Power; Tokyo Gas; Mitsubishi

  3. 2005

    A ship becomes a terminal

    In April 2005 Excelerate Energy began commercial operations at Gulf Gateway, 116 miles (187 km) off Louisiana in 298 ft (91 m) of water, which the Oil & Gas Journal called the world's first offshore LNG receiving port. The ship Excelsior, an LNG carrier with its own regasification plant, hooked up to a buoy kept underwater, warmed its cargo on board and sent the gas ashore through a pipeline on the seabed, at up to 690 million cubic feet (about 19.5 million m³) a day. It was the first new regasification plant in North America in more than 20 years. In 2012 Excelerate lifted the buoy out; TradeWinds reported that the port had handled just a few cargoes and, like other US import terminals, had been overtaken by shale gas.

    Lessonan import terminal is a bet on a shortage, and US shale gas ended that shortage within a few years.

    ogj.comtradewindsnews.com

    Credit

    Excelerate Energy; Exmar (owner of Excelsior); Daewoo Shipbuilding & Marine Engineering (builder)

  4. 2006

    A veto over seawater heaters

    On 5 May 2006 Louisiana Governor Kathleen Blanco vetoed a proposed federal license for the Main Pass Energy Hub, an offshore LNG terminal sought by Freeport McMoRan Energy, over harm to Gulf of Mexico fisheries. The terminal would have used open rack vaporizers, which warm LNG with seawater; the projects then proposed would have used billions of gallons of Gulf water a year. She wrote that until studies showed the vaporizers' effect on the ecosystem was acceptable, she would support only terminals with a closed-loop system, a more expensive design that uses far less seawater, and that industry assurances were not backed by "persuasive scientific studies or data."

    Lessona terminal that takes in seawater needs data on what that does to marine life, not assurances.

    marinelink.com

    Credit

    Kathleen Blanco, Governor of Louisiana; Freeport McMoRan Energy (applicant)

  5. 2016

    An import terminal exports

    Cheniere Energy's Sabine Pass terminal in Louisiana began operating as an import terminal in 2008. Rising shale gas output then cut US demand for imports, and operators converted some import terminals to export, the US Energy Information Administration says. On 24 February 2016 the first export cargo of the shale era left Sabine Pass aboard Asia Vision for Brazil, carrying 3.3 billion cubic feet of gas as LNG. Sabine Pass had shipped more than 3,300 cargoes by November 2025, and the United States became the world's largest LNG exporter, at 15.0 billion cubic feet a day in 2025.

    Lessonthe tanks, jetties and pipelines of an import terminal can be turned around by adding liquefaction when the gas market reverses.

    eia.gov

    Credit

    Cheniere Energy

  6. 2022

    Built in under eight months

    Pile driving for a new jetty at Wilhelmshaven, Germany, began on 5 May 2022. The floating storage and regasification unit (FSRU) Höegh Esperanza, a 170,000 m³ ship that stores LNG and turns it back into gas on board, chartered by the German government, arrived on 15 December; the terminal opened two days later as Germany's first LNG import terminal and began sending gas into the grid a day earlier than planned. Niedersachsen Ports built the jetty, OGE the 26 km pipeline to the grid, and Uniper runs the terminal for the government. Uniper said the unit would deliver at least 5 billion m³ of gas a year, about 6% of Germany's demand. GIIGNL counted 54 FSRUs worldwide at the end of 2025.

    nports.delngprime.comgiignl-documents.s3.fr-par.scw.cloud

    Credit

    Uniper; Niedersachsen Ports; OGE; Höegh LNG; the German government

Watch for

  1. Cambodia's first import terminal

    Royal Group is building Cambodia's first LNG import terminal and power plant at Botum Sakor in Koh Kong province: a jetty, one storage tank, regasification equipment and two 450 MW combined-cycle power units. Construction began in mid-2025, with the first phase expected to start by the end of 2026; GIIGNL reports that the plant is expected to generate about a quarter of Cambodia's electricity.

    Achieved whena first cargo is unloaded and its gas runs the power plant, as reported by an outside party such as GIIGNL or Cambodia's power regulator.

    giignl-documents.s3.fr-par.scw.cloud

    Claimed by

    Royal Group, mid-2025, as reported in GIIGNL's 2026 annual report

  2. Bio-LNG loaded at terminals

    In March 2025 Elengy began offering bio-LNG at its Fos-sur-Mer and Montoir-de-Bretagne terminals in France, loaded into trucks and small ships "through biomethane liquefaction by equivalence," a bookkeeping method that credits biomethane put into the gas grid elsewhere to LNG loaded at the terminal; the terminals were certified under the ISCC sustainability scheme in November 2024. KN Energies did the first such "virtual" operation at Klaipeda, Lithuania, in October 2025, which GIIGNL reports as the first in the Baltic region.

    Achieved whenthe certifier or a regulator publishes the volumes delivered this way and confirms that each was matched to biomethane that was produced and not counted twice.

    giignl-documents.s3.fr-par.scw.cloud

    Claimed by

    KN Energies, October 2025, after Elengy's start in March 2025

Open

  1. 01

    See cold plumes from space

    A method, tested on free satellite images, that finds and measures the patch of cold water a terminal releases when it warms LNG with seawater, and compares its size with how much gas the terminal sent out that day.

    The brief
    Credit · unclaimed
  2. 02

    Uptime of floating terminals

    A public table of every unplanned outage at EU import terminals, with dates, capacity lost and stated cause, and a comparison of uptime between terminals built around an FSRU and terminals built on land.

    The brief
    Credit · unclaimed

Open 01 · the brief

See cold plumes from space

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A method, tested on free satellite images, that finds and measures the patch of cold water a terminal releases when it warms LNG with seawater, and compares its size with how much gas the terminal sent out that day.

Why it is still open

In 2006 Louisiana's governor blocked an offshore terminal with seawater vaporizers because industry assurances about marine life were not backed by "persuasive scientific studies or data." Satellite studies of warm water from power plants are common, and a commercial thermal satellite was used in 2026 to show which equipment was running at an LNG export plant, but searches found no published satellite measurement of an import terminal's cold-water discharge.

marinelink.comsatellitevu.com

Built with what exists

Free thermal images from the Landsat 8 and 9 satellites (US Geological Survey); daily send-out for each European terminal from Gas Infrastructure Europe's ALSI data platform; terminal locations from Global Energy Monitor's gas infrastructure tracker; Python with the rasterio library.

  1. First step

    Pick one European terminal whose operator documents seawater vaporizers, and pull a year of its ALSI send-out data and the clear Landsat images over it.

  2. Done looks like

    For at least five coastal terminals that use seawater vaporizers, the area and temperature drop of the cold patch measured on at least 30 clear images each; the correlation between patch size and that day's send-out published with its confidence interval; code and measurements released so others can repeat them.

Open 02 · the brief

Uptime of floating terminals

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of every unplanned outage at EU import terminals, with dates, capacity lost and stated cause, and a comparison of uptime between terminals built around an FSRU and terminals built on land.

Why it is still open

Floating terminals keep being added: Germany opened a second one at Wilhelmshaven on 29 August 2025, and GIIGNL reports that a technical issue halted Greece's Alexandroupolis FSRU terminal in January 2025 and that full capacity returned only on 21 October. Gas Infrastructure Europe's ALSI platform publishes each terminal's unavailability and daily send-out, but searches found no published comparison of floating and onshore terminals' uptime.

giignl-documents.s3.fr-par.scw.cloudalsi.gie.eu

Built with what exists

ALSI data and its API; the outage notices that EU market rules require terminals to publish, collected on Gas Infrastructure Europe's inside-information platform; an AI model to sort free-text causes into codes (see the Note "The jobs agents repeat"); Python.

  1. First step

    Download ALSI's unavailability records for 2024 and mark which terminals use an FSRU.

  2. Done looks like

    Every unplanned unavailability event in ALSI from 2018 to 2025 in one table, each linked to its notice; two people agree on the cause code for at least 90% of a 100-event sample; uptime per terminal and per terminal type published with confidence intervals.