Industries / Food, farming and forestry / Agriculture and farming / Irrigation
Canals and pumps
Moving water from rivers and wells to fields: diversion works, canals and their gates, and the pumps that lift groundwater.
6
Milestones achieved, from c. 256 BCE to 2021.
1
To watch for: announced, not yet confirmed outside.
1
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
c. 256 BCE
River split without a dam
Dujiangyan, on the Minjiang River where the Sichuan basin meets the Tibetan plateau in China, divides the river with a bypass dike, a floodgate and a diversion passage instead of a dam, so that one set of works diverts water, sheds sediment and controls floods. UNESCO dates its start to about 256 BCE and says it now irrigates 668,700 ha of farmland on the Chengdu plain.
Credit
Li Bing, an official of the Qin state, as UNESCO's Dutch-language summary names him; enlarged under later dynasties
1905
Unguarded cut floods a valley
In the fall of 1904 the California Development Company cut a new intake into the bank of the Colorado River in Mexico, without control gates, to give its Imperial Valley canals a steeper route. Floods in the spring of 1905 widened the cut until the whole river ran into the Salton Sink, forming the Salton Sea. The Southern Pacific Company, which took over the company, closed the break on 4 November 1906, lost it a month later, and closed it for good in February 1907.
LessonPresident Theodore Roosevelt told Congress in January 1907 that making such a cut "without controlling devices was criminal negligence".
Credit
California Development Company (responsible); Southern Pacific Company (repair)
2003
Farm power on a timetable
In 1989 the Gujarat Electricity Board in India stopped metering farm pumps and charged them a flat rate instead; with no rationing of supply, groundwater withdrawals rose quickly and water levels fell. From 2003 to 2006 the state's Jyotigram scheme spent US$290 million to put farm pumps on power lines separate from villages: villages got power 24 hours a day, while tubewell owners got 8 hours a day at full voltage on a published schedule. Tushaar Shah and colleagues found that it halved the power subsidy to farming and reduced groundwater overdraft, but that water prices charged by tubewell owners rose by 30% to 50% and marginal farmers and the landless were harmed.
LessonRationing power cut pumping, but farmers who bought water from tubewell owners paid more and got less.
Credit
Government of Gujarat; assessed by Tushaar Shah (International Water Management Institute) and colleagues
2008
Rodents breach a canal
In January 2008 the earthen bank of the Truckee Canal, a century-old irrigation canal in Nevada, broke and flooded 590 properties in the city of Fernley. A team of experts reporting to the US Bureau of Reclamation concluded that muskrats, beavers, gophers and other rodents had dug holes as deep as 25 feet (about 7.6 m) into the bank over the years. Reclamation's work to cut the risk of another breach was completed in May 2024.
LessonAnimals can hollow out an earthen bank from inside for years before it fails.
Credit
US Bureau of Reclamation (owner); Truckee-Carson Irrigation District (operator under a 1996 contract)
2016
Solar pumps sell their surplus
In Dhundi village, Kheda district, Gujarat, farmers with solar-powered irrigation pumps formed a cooperative that sells the electricity they do not use to the local utility, Madhya Gujarat Vij Company (MGVCL), under a 25-year agreement at 4.63 rupees per kilowatt-hour; in August 2016 its members received their first payment, 36,005 rupees for 5,097 kWh. From June 2017 to May 2018, by the cooperative's own report, its nine members generated 103,161 kWh and used only 26% of it for pumping.
LessonPaying for unused power gives a pump owner a reason to pump less; Gujarat (SKY, 2018) and India (KUSUM, 2019) later launched schemes for farmers to sell solar power.
Credit
the Dhundi farmers' cooperative; International Water Management Institute (IWMI), which supported it; MGVCL
2021
Canal losses cut, then audited
Goulburn-Murray Water's Connections Project in northern Victoria, Australia, finished its works in October 2020 after $2 billion of federal and state spending. It decommissioned more than 1,700 km of channels, upgraded more than 300 km, built pipelines, installed new meters and automated the channel regulators (gates). Thirteen independent audits, the last by Cardno (now Stantec) for 2020–21, put its long-term average water recovery at 433,046 megalitres (about 433 million m³) a year, 4 GL above its target.
LessonThe project had to be reset in 2016 to get back on track.
Credit
Goulburn-Murray Water; the Victorian and Australian governments
Watch for
Solar panels over canals
Project Nexus put 1.6 MW of solar panels over Turlock Irrigation District canals in California, completed in September 2025 by the district, the California Department of Water Resources, Solar AquaGrid and the University of California, Merced. UC Merced reports early results of up to 70% less evaporation and 85% less weed growth under the panels; pv magazine reports 50% to 70% less evaporation over a full irrigation season.
Achieved whena full season of measured evaporation under and beside the panels is published with its data and checked by a party outside the project.
Claimed by
University of California, Merced, the project's research partner, April 2026
Open
01
Find burrows in canal banks
A survey method and a trained detector that find animal burrow entrances along earthen canal banks from drone or pole-camera images, with a public test against a survey made on foot.
The briefCredit · unclaimed
Open 01 · the brief
Find burrows in canal banks
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A survey method and a trained detector that find animal burrow entrances along earthen canal banks from drone or pole-camera images, with a public test against a survey made on foot.
Why it is still open
US Bureau of Reclamation research projects have asked whether airborne multispectral sensing, or geophysical instruments towed along the bank, can find seepage and animal burrows in canal embankments. In January 2024 the British Geological Survey was still trialling electrical resistivity on flood embankments and said that until then regulators and landowners had "no way to know where the badger burrows go underground". Deep learning has been used to count common vole burrows in farmland from drone images (Plaza and colleagues, Smart Agricultural Technology, 2025), and a 2025 master's thesis at the University of New Orleans trained a ResNet-34 image classifier on burrow photos that levee inspectors took by hand, but no drone survey of canal banks checked against a survey on foot was found.
Built with what exists
A small drone with visible and thermal cameras, such as DJI's Mavic 3 Thermal, flown by a licensed pilot, or a camera on a pole carried along the bank; an open object detector such as Ultralytics YOLO, run on a laptop (see the Note "A first stable number for local AI"); a phone that tags photos with their location for the survey on foot.
First step
With an irrigation district's permission, walk 1 km of canal bank with its maintenance crew, photograph every burrow, and image the same kilometre.
Done looks like
20 km of earthen canal bank imaged and walked in the same week; every burrow found either way logged with its position; the share of burrows found on foot that the detector also found, and its false alarms per kilometre, published with the labelled images.