Industries / Energy, water and waste / Power generation / Hydroelectric
Turbines and generators
This is the work of designing, building and running the machines that turn falling water into electricity: the turbine, whose spinning part (the runner) is pushed by the water, and the generator on the same shaft.
6
Milestones achieved, from 1827 to 2022.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1827
Fourneyron's first turbine
In April 1827 Benoît Fourneyron installed his first water turbine at Pont-sur-l'Ognon in eastern France, rated at six horsepower under a 1.40 m drop, to drive a sawmill, a lathe and a grindstone, by the French heritage inventory's account. In his design the water was led through fixed guide blades and then outward through the vanes of an enclosing wheel, giving up nearly all its swirl to the wheel; a 1927 account in The Engineer, reprinted by Grace's Guide, says one of his turbines ran under a 354 ft (108 m) head at 2,300 revolutions per minute in 1837, and that the first two 5,000-horsepower turbines installed at Niagara in 1895 were of Fourneyron's type.
Credit
Benoît Fourneyron
1849
Water flows inward
James B. Francis, chief engineer of the canal company at Lowell, Massachusetts, used tests of his 1847 turbine to design a much improved model with curved guides and buckets for the Boott Mills in 1849. Water enters it around the outside and flows inward through the runner. Francis published his measurements as Lowell Hydraulic Experiments in 1855. ASME says the Francis type, developed from a wheel Samuel Howd patented in 1838, is the most widely used water turbine for medium heads and large flows, and that most turbines used to make hydroelectric power today are called Francis turbines.
Credit
James B. Francis, Proprietors of Locks and Canals, Lowell
1880
The split bucket
A Pelton wheel is turned by a jet of water striking buckets around its rim, and suits sites where water falls a long way. Lester A. Pelton built his first one at Camptonville, California, in 1878, developed from the "hurdy gurdy" wheels of the gold fields, and patented the splitter bucket, which divides the jet in two, on 26 October 1880 (US Patent 223,692). ASME says the splitter principle "appears original" to Pelton. From 1899 William A. Doble patented better bucket and nozzle shapes and became chief engineer of Pelton's company in 1912.
Credit
Lester A. Pelton; William A. Doble
1913
Blades that adjust
Viktor Kaplan filed patent applications in Europe in 1913 for a propeller-type turbine whose runner blades and inlet gates are adjusted together, which ASME's landmark brochure says he was the first to do. The First World War delayed its use until after 1920; by 1930 such turbines were installed almost wherever the head (the height the water falls) suited them, because they keep a high, nearly constant efficiency over a wide range of loads. One of the first three in the United States, built by the S. Morgan Smith Company, went into service at York Haven, Pennsylvania, on 5 April 1929 under a 23 ft head.
Credit
Viktor Kaplan; S. Morgan Smith Company
2009
Sayano-Shushenskaya unit 2 fails
At 8:13 a.m. on 17 August 2009, at the 6,400 MW Sayano-Shushenskaya plant in Russia, the 1,860-ton cover of Unit 2's turbine was blown off and water under a 212 m head threw the spinning rotor out of its pit; 75 workers died. Examination of the broken bolts that held the cover found fatigue damage across an average of 65% of each bolt's cross-section, and some nuts had never been fitted. The unit's bearing vibration had risen fourfold since April 2009 and was 840 µm against an allowed 160 µm, and on the night before it had passed several times through an operating range marked "not recommended". Afterwards the wicket gates, the adjustable vanes that let water into the turbine, were redesigned to close automatically if power is lost.
Lessona vibration limit protects a machine only if someone is required to shut it down when the limit is passed.
Credit
RusHydro (owner); findings as reported by POWER magazine
2022
Units of 1,000 MW
The last of the 16 generating units at Baihetan in China, each rated 1,000 MW, entered operation in December 2022, completing a 16 GW plant, by Water Power Magazine's report. China's government reported that the chairman of China Three Gorges Corporation, which built it, said each unit has the largest single-unit capacity in the world.
Credit
China Three Gorges Corporation
Watch for
A 500 MW Pelton unit
Dongfang Electric is supplying one of two 500 MW impulse units with Pelton turbines for the Datang Zhala hydropower station in Xizang (Tibet), which People's Daily calls the world's first 500 MW impulse hydropower units. The inlet valve of Unit 1 passed its pressure test in July 2026, and the rotor was lifted into place in August 2026, which Global Times describes as the last stage before commercial launch.
Achieved whenUnit 1 delivers power at or near 500 MW and someone other than the builders and owner reports it running.
Claimed by
Dongfang Electric and Chinese state media, July and August 2026
Vibration warnings a month early
Dewesoft, a measurement company, and the Croatian utility HEP report a machine-learning model of shaft vibration on a hydro generating unit in Croatia. Replayed on 2020–2021 data from before a fault that led to the generator's complete shutdown, it showed deviations up to 47 days before conventional alarms would have sounded; the model was not running at the time, and the authors report no live catch since it went into production in July 2024.
Achieved whenrunning live, it flags a developing fault on an operating unit before standard alarms, with its false alarms counted, as reported by the plant owner or an outside reviewer.
Claimed by
Dewesoft with HEP, May 2026
Open
01
Open recordings from working units
A free, labeled collection of vibration and sound recordings from operating hydro units, logged with each unit's output in megawatts, covering normal running, rough part-load running and faults later confirmed by maintenance records, with a baseline detector that others can try to beat.
The briefCredit · unclaimed02
Counting starts across Europe
A public table of how often each large conventional hydro unit in Europe starts, stops and runs below half its rated output, year by year since 2015, built from the output that EU rules require grid operators to publish for every generating unit of 100 MW or more.
The briefCredit · unclaimed
Open 01 · the brief
Open recordings from working units
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A free, labeled collection of vibration and sound recordings from operating hydro units, logged with each unit's output in megawatts, covering normal running, rough part-load running and faults later confirmed by maintenance records, with a baseline detector that others can try to beat.
Why it is still open
Oak Ridge National Laboratory (ORNL) writes that the unit-level data the Hydropower Research Institute pools from US owners, 160 units at 34 sites in 2021, are "proprietary and non-public". A 2025 open-source project for detecting faults in hydro generators by sound says its raw data "cannot be publicly released". The EU Di-Hydro project's dataset of vibration, flow and acoustic data from hydro plants is restricted and "not intended for public dissemination".
Built with what exists
Contact microphones and USB accelerometers fixed by plant staff, or a university turbine test rig; the plant's own output log; Microsoft's BEATs audio model (in its unilm repository); the MIT-licensed code from the project above; the Anomalib anomaly-detection library; Zenodo to publish with a citable DOI.
First step
Ask two owners of small hydro plants and one university turbine laboratory whether their staff would record one unit across its full load range this month.
Done looks like
Recordings from at least 12 units at four or more plants and at least two turbine types, at least three fault events labeled from maintenance records, released under an open license, with a baseline whose detection rate and false alarms per month of normal running are published.
Open 02 · the brief
Counting starts across Europe
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of how often each large conventional hydro unit in Europe starts, stops and runs below half its rated output, year by year since 2015, built from the output that EU rules require grid operators to publish for every generating unit of 100 MW or more.
Why it is still open
Each start and each hour at part load wears turbines and generators. SINTEF researchers Arnt Ove Eggen and Michael Belsnes model the cost of one start for single units, noting that more frequent starts follow from swings in market prices. Norway's HydroCen research center, which studied stator wear at a few Norwegian plants, says "more data is needed from several power plants". The EU rule requires actual output per market time unit for every unit of 100 MW or more. Searches of papers, Zenodo and GitHub found no count of starts or part-load hours across the fleet.
Built with what exists
The ENTSO-E Transparency Platform's API (free registration); entsoe-py, an MIT-licensed Python client; pandas; a coding agent such as GitHub Copilot to write the pipeline (see the Note "Effort, not model").
First step
Register for an API key and count starts per unit for one Alpine and one Nordic country in 2015 and 2025.
Done looks like
Every conventional hydro unit the platform lists, with starts per year and hours below half load for 2015–2025, published with code; a second person checks 30 random unit-years against the raw series; the trend reported whether it rises or not, with a note that starts shorter than one market time unit are missed. Pumped storage units are left to a separate study.