BRENNEN

Industries / Energy, water and waste / Power generation / Hydroelectric

Pumped storage

Pumped storage plants pump water up to a high reservoir when power is cheap or plentiful and let it run back down through turbines when power is needed, so they store electricity for hours at a time.

6

Milestones achieved, from 1907 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1907

    A Swiss pond stores power

    At Schaffhausen, Switzerland, a pumped storage plant was built in 1907 and 1908 with a pond on the hill, the Engeweiher, as its upper reservoir, 144 m above the Rhine. Water is pumped up when power is spare and runs back down through a Francis pump-turbine of 5 MW when it is needed. A 2017 report by the canton's government calls it Switzerland's first storage power plant when it was built in 1907 and gives its overall efficiency as 73%: of the power used to pump, 73% comes back. It was renewed in 1991 to 1993, overhauled in 2011, and still runs.

    sh.chsh.ch

    Credit

    the city of Schaffhausen's power works, today SH POWER

  2. 1984

    Full power in seconds

    Dinorwig Power Station was built inside Elidir mountain in north Wales, on the site of slate quarries that closed in the 1960s, and opened on 9 May 1984. Its six reversible pump-turbines, machines that pump water one way and generate as it flows back, can go from standby, spinning in air, to 1,320 MW in 12 seconds, by the operator's figures. That lets the station cover a sudden jump in demand or the loss of a large power plant.

    engie.co.uk

    Credit

    Dinorwig Power Station, run today by ENGIE's First Hydro Company

  3. 1985

    North America's largest station

    Bath County Pumped Storage Station in Virginia's Allegheny Mountains began commercial operation in December 1985. When demand is low it pumps water from a lower reservoir to an upper one; when demand is high the water runs back through tunnels at up to 13.5 million gallons a minute and turns six turbine-generators, now rated at 3,003 MW net. Dominion Energy, which owns 60%, calls it the largest pumped-hydro energy storage facility in North America.

    dominionenergy.com

    Credit

    Dominion Energy, with co-owners Bath County Energy and Alleghany Power System

  4. 1990

    Pumps that change speed

    An ordinary pump-turbine turns at one fixed speed, so while pumping it draws a fixed amount of power. In 1990 Tokyo Electric Power Company (TEPCO) commissioned an 85 MVA unit at its Yagisawa plant whose speed can be varied by feeding the generator's rotor from a power converter; TEPCO's engineers called it the world's first converter-fed variable speed pumped storage system. Toshiba, which lists Yagisawa among its installations, says a speed change of about 5% to 8% lets such a unit adjust its pumping power between about 60% and 100%, so it can help hold the grid's frequency steady at night in place of fossil plants. In December 1993 Kansai Electric Power and Hitachi commissioned a 400 MW unit of this kind at Ohkawachi.

    search.isc.acjase-w.eccj.or.jposti.gov

    Credit

    TEPCO and Toshiba (Yagisawa); Kansai Electric Power and Hitachi (Ohkawachi)

  5. 1999

    Seawater pumped uphill

    In 1999 Japan's Ministry of Economy, Trade and Industry built a test plant at Kunigami, in northern Okinawa, at a cost of ¥3.2 billion. At night it pumped seawater into a reservoir on a hill about 150 m above the sea, and by day let it run back through a turbine, using the ocean as the lower reservoir; Okinawa's local press called it the first of its kind in the world. J-POWER ran it as a test facility, but it was never put into commercial use, because Okinawa's demand for power did not grow as forecast and the plant could not pay its way, and J-POWER had dismantled it by July 2016.

    Lessona plant that works still needs a grid that needs it.

    okinawanderer.comjase-w.eccj.or.jp

    Credit

    Ministry of Economy, Trade and Industry; J-POWER (Electric Power Development Co.)

  6. 2024

    The largest station runs fully

    The Fengning pumped storage station in Chengde, Hebei province, China, went into full operation on 31 December 2024, when the last of its 12 units began running, for 3,600 MW in all. Xinhua and China Daily call it the largest of its kind in the world by installed capacity, and its operator gives its designed output as more than 6.6 billion kWh a year. An engineer at the station told China Daily its job is to steady the North China grid as more wind and solar power, which come and go with the weather, join it.

    chinadaily.com.cnthestar.com.my

    Credit

    State Grid Xinyuan Hebei Fengning Pumped Storage Co

Watch for

  1. Snowy 2.0 resets again

    Snowy 2.0, in Australia, is to give 2,200 MW of generating capacity and 350,000 MWh of storage from six pump-turbines, by Snowy Hydro's figures. After a 2023 reset it was to cost A$12 billion, with first power in the second half of 2027 and all units running by December 2028. In October 2026 Snowy Hydro gave a new target cost of A$22.2 billion, with an allowance for a A$25 billion case, and a target completion in late 2029, as reported by The Nightly; the project was announced in 2017 at A$2 billion.

    Achieved whenall six units are in commercial operation and the market operator's data show them pumping and generating.

    thenightly.com.ausnowyhydro.com.au

    Claimed by

    Snowy Hydro, October 2026

  2. Pumped hydro at a mine

    Genex Power, since taken private by J-POWER, is turning the retired Kidston gold mine in north Queensland, Australia, into a 250 MW pumped storage plant that can store 2 GWh. In May 2025 Genex said it would be the first new pumped hydro plant completed in Australia in 40 years and expected it to be commissioning by the end of 2025. On 18 November 2025 the first of its two 125 MW units was registered with the market operator, and Genex's chief executive, Craig Francis, said commissioning would begin in the middle of 2026. In August 2026 the market operator's planning data, as read by the analysis site WattClarity, still showed its generating units unavailable until 22 July 2027.

    Achieved whenthe units pump and generate in Australia's National Electricity Market and the market operator's data show it.

    pv-magazine-australia.comreneweconomy.com.auwattclarity.com.au

    Claimed by

    Genex Power, May and November 2025

Open

  1. 01

    Measured efficiency, plant by plant

    A public table, updated each year, of how each US pumped storage plant actually performs: electricity used for pumping, electricity generated, the share returned (the round-trip efficiency) and how much of the year it ran, for every year the federal data cover, with each plant set beside the fleet average and beside its design figures where those are published. Add European units where grid operators publish both pumping and generation for the same unit.

    The brief
    Credit · unclaimed
  2. 02

    Back-test the cost model

    A test of how well the open cost model used to rank pumped hydro sites predicts what plants really cost. For every pumped storage plant finished or well into construction since 2000 that has a public final or latest cost, record the cost, its date and its source; run the model on the same site, or on the same head, size and tunnel length; and publish the ratio of modeled to real cost.

    The brief
    Credit · unclaimed

Open 01 · the brief

Measured efficiency, plant by plant

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table, updated each year, of how each US pumped storage plant actually performs: electricity used for pumping, electricity generated, the share returned (the round-trip efficiency) and how much of the year it ran, for every year the federal data cover, with each plant set beside the fleet average and beside its design figures where those are published. Add European units where grid operators publish both pumping and generation for the same unit.

Why it is still open

The US Energy Information Administration (EIA) collects monthly pumping consumption and gross generation for each storage plant in its Power Plant Operations Report, but it has published only a fleet figure: pumped storage plants averaged a monthly round-trip efficiency of 79% in 2019. Searches of GitHub and Crossref found simulators and dispatch optimizers for pumped storage, such as Sandia's Simulink models, but no plant-by-plant table of measured efficiency.

eia.gov

Built with what exists

EIA-923 plant files and the EIA open data API; the ENTSO-E Transparency Platform and its Python client, entsoe-py, for European units; Python with pandas; a coding agent to write the download and cleaning scripts, such as GitHub Copilot (see the Note "Effort, not model").

  1. First step

    Download the 2019 EIA-923 file, compute each pumped storage plant's monthly efficiency, and check that the average comes out near EIA's 79%.

  2. Done looks like

    Every pumped storage plant in the EIA-923 files, for each year available, with yearly efficiency and hours of use, and any value above 100% or with missing months flagged; code and CSV published; a second person recomputes 10 plant-years from the raw files and matches within 0.5 percentage points.

Open 02 · the brief

Back-test the cost model

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A test of how well the open cost model used to rank pumped hydro sites predicts what plants really cost. For every pumped storage plant finished or well into construction since 2000 that has a public final or latest cost, record the cost, its date and its source; run the model on the same site, or on the same head, size and tunnel length; and publish the ratio of modeled to real cost.

Why it is still open

The Australian National University's (ANU) atlas lists more than 800,000 possible pumped hydro sites worldwide, ranked by modeled cost, and warns that many or most may prove unsuitable. Its 2018 check compared the model with costs that developers had announced, not final costs: most Australian schemes came within about 25%, but the model gave 57% of Snowy 2.0's then A$4 billion. Snowy 2.0's target cost is now A$22.2 billion. A search found no back-test against final costs.

re100.eng.anu.edu.auapvi.org.au

Built with what exists

ANU's open site-search code, PHES_Searching (GPL-3.0), whose settings carry its dam, tunnel and lining cost terms and its cost-class cutoffs; global elevation data (SRTM); company annual reports, regulator filings and audit reports; a model that reads long documents in Chinese and English, such as Meta's Muse Ember (see the Note "The jobs agents repeat"); Python.

github.com

  1. First step

    Run the open code for Kidston and Snowy 2.0, two of the schemes in ANU's 2018 table, and set the results beside their latest public costs.

  2. Done looks like

    At least 25 plants in at least five countries, each cost converted to one currency and year with its source linked, the model's estimate for each, and the median and spread of the ratios published whether the model does well or badly; a second person reruns five sites and gets the same model costs.