Port and channel work builds harbors, quays and breakwaters, and digs channels deep enough for ships, often by dredging, which is digging under water.

7

Milestones achieved, from About 2600 BC to 2023.

2

To watch for: announced, not yet confirmed outside.

1

Open deliverables. Nobody has shipped them.

In depth

The same ground is charted in more depth, as industries of their own.

The road

AchievedWatch forOpen

Achieved

  1. About 2600 BC

    The oldest known harbor

    At Wadi al-Jarf on Egypt's Gulf of Suez, builders in the reign of the pharaoh Khufu laid a stone jetty about 150 m long into the sea to shelter boats. Archaeologist Pierre Tallet says the harbor "predates by more than 1,000 years any other port structure known in the world."

    theworld.orgen.wikipedia.org

    Credit

    Old Kingdom Egyptian builders; excavated since 2011 by a French and Egyptian team led by Pierre Tallet and Gregory Marouard

  2. 1869

    Dredgers finish the Suez Canal

    Digging of the canal between the Mediterranean and the Red Sea began on April 25, 1859, largely by forced, unpaid labor. After forced labor ended in 1864, the contractors Paul Borel and Alexandre Lavalley finished the excavation with dredging machines of their own design. The canal opened on November 17, 1869.

    Lessonthe cost in lives is still disputed; Wikipedia reports estimates from under 1,000 to Egyptian president Gamal Abdel Nasser's 1956 claim of 120,000.

    suezcanal.gov.egen.wikipedia.org

    Credit

    Ferdinand de Lesseps and the Suez Canal Company; Borel and Lavalley; tens of thousands of Egyptian laborers

  3. 1914

    Panama after a French failure

    A French company led by Ferdinand de Lesseps began a sea-level canal across Panama in 1881. Disease, landslides into the cuts and money trouble wore it down, and by May 15, 1889, all work had stopped. The United States took over in 1904, used steam shovels, and fought yellow fever and malaria by controlling mosquitoes. The canal opened to commercial traffic on August 15, 1914.

    Lessonthe French did not yet know that mosquitoes carry yellow fever and malaria, and de Lesseps held to a sea-level plan until 1887.

    pancanal.comen.wikipedia.org

    Credit

    US government; chief engineer John F. Stevens; William C. Gorgas (disease control)

  4. 1959

    A crane built for containers

    Matson Navigation put a dockside crane designed only for lifting shipping containers into service on January 7, 1959, at Alameda, California. Before it, one dock gang moved about 9 tons of cargo an hour; the new crane moved about 400 tons an hour. The American Society of Mechanical Engineers made it a landmark and calls it "the world's first high-speed dockside container handling crane."

    asme.org

    Credit

    PACECO (designer and builder); Matson's engineers under Les Harlander

  5. 1993

    Rotterdam automates a terminal

    Europe Container Terminals opened the Delta/Sea-Land terminal in Rotterdam on June 25, 1993. Driverless automated guided vehicles carried containers between ship cranes and the yard, and automated stacking cranes moved them in and out of the stacks. The operator calls it the world's very first automated terminal, and Wikipedia says this use of driverless vehicles "was pioneered in 1993 at the Port of Rotterdam."

    Lessonthe operator tested one vehicle and one stacking crane separately, then together, then step by step at larger scale.

    ect.nlen.wikipedia.org

    Credit

    Europe Container Terminals, Port of Rotterdam

  6. 2015

    A million cubic meters daily

    For the New Suez Canal project, six dredging companies dug a parallel channel and deepened the existing one in about nine months. Maritime Executive reports that "over one million cubic meters of material was dredged daily." Sources give different lengths for the new work.

    maritime-executive.com

    Credit

    Suez Canal Authority (client); National Marine Dredging Company (UAE), Boskalis and Van Oord (Netherlands), Jan De Nul and DEME (Belgium), Great Lakes Dredge and Dock (US)

  7. 2023

    Outsiders measure dredging worldwide

    UNEP's Marine Sand Watch reads AIS signals, the position reports that ships broadcast, and uses AI to spot dredging. It estimates that about 6 billion metric tons of sand and sediment are taken from the seas each year, but says only about half of dredging vessels are monitored. Separately, Dhritiraj Sengupta and colleagues mapped Landsat satellite images from 2000 to 2020 and found reclaimed land in 106 of 135 coastal cities with over a million people, about 253,000 hectares in all, most often for port expansion.

    phys.orgapi.semanticscholar.org

    Credit

    UNEP and GRID-Geneva; Sengupta and co-authors, Earth's Future

Watch for

  1. An automated harbor dredger

    A hopper dredger sucks silt from a harbor bottom into its hold and carries it away. The German Aerospace Center (DLR), with the port company Niedersachsen Ports and MAREVAL AG, is designing one for the port of Emden at three levels: help for the crew on board, remote control with crew on board, and remote control with no crew. After sea trials in Emden from 2023 to 2025, DLR concluded that an automated dredger "can mostly be realized" with current technology.

    Achieved whena hopper dredger does routine maintenance dredging under remote control, and the port operator or a ship classification society publishes its working record.

    elib.dlr.de

    Claimed by

    DLR, October 2025

  2. Tuas port on reclaimed land

    Singapore is building Tuas Port in four phases on land reclaimed from the sea, edged by caissons, giant concrete boxes set in a line to form a seawall. Phase 2 used 227 caissons, each ten stories tall, for 9.1 km of seawall. The port operator PSA calls Tuas "the world's largest fully automated container terminal" and said in August 2026 that it had 14 working berths and was on track for 18 by 2027.

    Achieved whenPhase 2 is finished and in routine use, and an outside party confirms the "largest fully automated" claim by comparing terminals.

    globalpsa.commpa.gov.sg

    Claimed by

    PSA Singapore, August 2026; Maritime and Port Authority of Singapore

Open

  1. 01

    Monthly port reclamation tracker

    For 10 port reclamation projects under way in 2024 to 2026, including Tuas Phase 2, measure the new land area every month from free Sentinel-2 satellite images. Publish the series with error bars, beside every official progress statement found for the same months.

    The brief
    Credit · unclaimed

Open 01 · the brief

Monthly port reclamation tracker

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

For 10 port reclamation projects under way in 2024 to 2026, including Tuas Phase 2, measure the new land area every month from free Sentinel-2 satellite images. Publish the series with error bars, beside every official progress statement found for the same months.

Why it is still open

The largest independent study, by Sengupta and colleagues, stops in 2020. Official updates on active projects are often in words, not numbers: Singapore's acting transport minister said on March 4, 2026, only that "Phase 2 reclamation works are progressing well." Published Sentinel-2 studies of ports are one-off case studies, and no maintained public tracker was found.

mot.gov.sgapi.semanticscholar.org

Built with what exists

Copernicus Sentinel-2 imagery (free); Google Earth Engine or the Copernicus Data Space Ecosystem to fetch it; a water index such as NDWI to separate water from land; QGIS for hand-drawn check outlines; an AI coding agent to write and rerun the pipeline; a web agent to collect official progress statements for a person to check (see the Note "Deleting 80% to start over"). Frequent free imagery and coding agents make a one-person monthly tracker practical.

  1. First step

    Pull two cloud-free Sentinel-2 scenes over Tuas, one from early 2024 and one from late 2026, measure the land gained inside the Phase 2 seawall, and compare it with any figure the port authority has published.

  2. Done looks like

    A public CSV and notebook with monthly land area for 10 projects over at least 24 months; measured error against 20 hand-drawn outlines; a table of every official area or percent-complete figure beside the satellite figure for that month.