BRENNEN

Industries / Construction and property / Fire protection and life safety

Records and compliance

Records and compliance is the paperwork that proves a building's fire systems were inspected and repaired, and the laws and officials that decide who must keep it and who checks it.

6

Milestones achieved, from 1975 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1975

    A national fire incident record

    The US Fire Administration set up the National Fire Incident Reporting System (NFIRS) in 1975, and it became the main US system for collecting fire departments' reports of the fires they attend, moving over the years from paper forms to the web. NFPA derives its national estimates of how sprinklers perform in real fires from NFIRS, together with its own yearly survey of fire departments.

    usfa.fema.govplumis.co.uk

    Credit

    US Fire Administration

  2. 2006

    Certificates give way to assessments

    The Regulatory Reform (Fire Safety) Order 2005 took effect in England and Wales on 1 October 2006. It replaced fire certificates under the Fire Precautions Act 1971 with a duty on a "responsible person", the employer for a workplace and otherwise whoever controls or owns the premises, to make a fire risk assessment of non-domestic premises and keep it up to date. A written record of its significant findings was required only where five or more people were employed, a license was in force or an alterations notice demanded it.

    legislation.gov.uklegislation.gov.uklegislation.gov.uk

    Credit

    UK Parliament, on the Office of the Deputy Prime Minister's proposal

  3. 2017

    Records show why sprinklers fail

    NFPA's July 2017 report U.S. Experience with Sprinklers, by Marty Ahrens, estimated from US fire reports for 2010 to 2014 that sprinklers were present in 10% of reported fires, operated in 92% of fires large enough to set them off, and controlled the fire in 96% of those. In three-fifths of the fires in which sprinklers did not operate, the system had been shut off. A later edition, by Tucker McGree, published on 1 October 2026 with data for 2020 to 2024, found them operating in 90% of such fires and controlling 97% of those, and civilian deaths per fire 90% lower where sprinklers were present than where no automatic system was; a shut-off system was still the most common reason a sprinkler failed to operate.

    LessonMost failures in the records came from systems people had turned off, so a record of whether each system is switched on matters as much as its design.

    plumis.co.uknfpa.org

    Credit

    Marty Ahrens and Tucker McGree, NFPA

  4. 2020

    Reports filed online to inspectors

    Since 15 April 2020 the San Diego Fire-Rescue Department has required every company that inspects, tests or repairs fire protection systems in the city to file each report within 14 days through The Compliance Engine, a web service run by the company Brycer. Each deficiency must be entered in the service, a report that lists deficiencies counts as compliant only with a repair form showing them fixed, and impairments, faults that stop a system from working, must be reported at once. The contractor pays a filing fee for each inspection report. Brycer says more than 1,420 US jurisdictions use the service.

    sandiego.govmccmeetingspublic.blob.core.usgovcloudapi.net

    Credit

    San Diego Fire-Rescue Department; Brycer

  5. 2023

    England widens the record

    The Fire Safety (England) Regulations 2022, which carried out most of the Grenfell Tower Inquiry's first-phase recommendations that needed a change in law, came into force on 23 January 2023. The responsible person for a block of flats at least 18 m or seven storeys high must send the local fire and rescue service electronic floor plans and details of the outside walls, keep paper plans in a secure box firefighters can open, check firefighting lifts and key firefighting equipment at least monthly, and tell the fire service of any such fault lasting more than 24 hours. From 1 October 2023, section 156 of the Building Safety Act 2022 required every responsible person to record the whole fire risk assessment, not only its significant findings, along with the name of whoever carried it out and how fire safety is managed.

    gov.ukgov.uklegislation.gov.uk

    Credit

    UK Parliament; the Home Office

  6. 2024

    Regulator counts overdue fire actions

    From April 2024 England's Regulator of Social Housing began checking landlords against new consumer standards, under the Social Housing (Regulation) Act 2023. In July 2024 it found that Octavia Housing had 1,200 overdue medium- or high-risk fire safety actions, and in February 2026 that the City of London Corporation, which manages 1,900 homes, had more than 1,000. The trade magazine HQM read the 48 judgments the regulator issued from July 2024 to February 2026: overdue fire safety actions appeared in 19 of the 41 graded C3, and six of the seven graded C4 flagged fire safety shortfalls.

    LessonAn assessment on file does not make a building safer until its actions are done.

    hqm.hqnetwork.co.uk

    Credit

    Regulator of Social Housing; analysis by Keith Cooper for HQM

Watch for

  1. Wales widens building safety duties

    The Building Safety (Wales) Act 2026, given Royal Assent on 27 April 2026, applies to buildings with two or more homes, not only tall ones. It requires buildings the Act places in categories 1 and 2 to be registered, requires fire risk assessments to be made by a competent person, and requires a principal accountable person for each occupied category 1 building to prepare a safety case report, keep a system for recording safety occurrences and apply for a building certificate. It also obliges the responsible person under the Fire Safety Order to co-operate with those accountable people and to give them information on request. On 17 November 2026 most of its sections were not yet in force.

    Achieved whencommencement orders bring Part 1 into force and the first buildings appear on the register.

    legislation.gov.uklegislation.gov.uklegislation.gov.uk

    Claimed by

    Senedd Cymru (the Welsh Parliament), April 2026

  2. A new US incident system

    The US Fire Administration is replacing NFIRS with the National Emergency Response Information System (NERIS), launched in November 2024. 2025 was a hybrid year; since 1 January 2026 fire departments may report incidents only in NERIS, and NFIRS became unavailable in February 2026.

    Achieved whenthe Fire Administration publishes national figures for 2026 from NERIS, and an outside analyst such as NFPA publishes estimates of sprinkler and alarm performance from them.

    usfa.fema.govusfa.fema.gov

    Claimed by

    US Fire Administration, April 2025

Open

  1. 01

    Test what report tracking changes

    An independent before-and-after study of report-tracking services for US fire departments. For cities that began requiring contractors to file inspection reports through The Compliance Engine or a similar service, compare the share of buildings with a current inspection report and the time taken to fix reported deficiencies, before and after adoption, using the cities' own records. Where no records exist from before, compare with neighboring cities that did not adopt a service.

    The brief
    Credit · unclaimed
  2. 02

    Follow actions across published assessments

    A public tracker built from the fire risk assessments that UK landlords publish for their tall blocks. For each block, list every action the assessor set, its priority and due date, and whether the next published assessment shows it done. Report, by landlord, the share of high-priority actions closed by the next assessment.

    The brief
    Credit · unclaimed

Open 01 · the brief

Test what report tracking changes

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An independent before-and-after study of report-tracking services for US fire departments. For cities that began requiring contractors to file inspection reports through The Compliance Engine or a similar service, compare the share of buildings with a current inspection report and the time taken to fix reported deficiencies, before and after adoption, using the cities' own records. Where no records exist from before, compare with neighboring cities that did not adopt a service.

Why it is still open

The outcome figures come from the vendor. A Brycer sales sheet in a Thornton, Illinois council packet claims an 85% cut in administrative time and a "63% increase in testing and repair activity in the first year", and says 40% of life safety systems go uninspected or unmaintained each year, without saying how any figure was measured. A search found no independent evaluation.

mccmeetingspublic.blob.core.usgovcloudapi.netsandiego.gov

Built with what exists

public records requests, for example through MuckRock; city council packets and open data portals; a low-cost AI model to pull counts and dates out of scanned reports (see the Note "The jobs agents repeat"); Python or R for an interrupted time series, a method that compares a trend before and after a change.

  1. First step

    Ask San Diego Fire-Rescue, which has required filing through The Compliance Engine since April 2020, for monthly counts of reports filed and deficiencies closed from 2018 to 2025.

  2. Done looks like

    Records from at least 10 jurisdictions covering at least two years before and two years after adoption, published with the method and code, and a statement of whether the vendor's 63% figure holds.

Open 02 · the brief

Follow actions across published assessments

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public tracker built from the fire risk assessments that UK landlords publish for their tall blocks. For each block, list every action the assessor set, its priority and due date, and whether the next published assessment shows it done. Report, by landlord, the share of high-priority actions closed by the next assessment.

Why it is still open

The housing regulator reports landlord totals, and HQM's count works from the regulator's judgments, not from the assessments themselves. In 2018 the magazine Inside Housing gathered assessments for 1,584 social housing tower blocks in England and counted what they found, such as 1,130 blocks with broken fire doors or doors that would not hold back fire for 30 minutes, but it did not follow whether the actions were later done. Camden publishes monthly progress reports on its outstanding actions under an undertaking to the regulator. Commercial tools such as Fixflo's Aidenn Compliance pull actions out of a landlord's own assessments for that landlord's use. Searches found no public record that follows actions block by block across landlords, though Camden publishes an assessment for each of its registered high-rise buildings and Hull publishes 20.

hqm.hqnetwork.co.ukinsidehousing.co.ukcamden.gov.ukhull.gov.ukfixflo.com

Built with what exists

published assessments from councils such as Camden and Hull; pdftotext and an optical character reader for scanned pages; a low-cost AI model to pull out each action, priority and date (see the Note "The jobs agents repeat"); SQLite or a spreadsheet; a second person to check a sample.

  1. First step

    Download Hull's 20 high-rise assessments and code the actions in five of them by hand, to set the categories before any automation.

  2. Done looks like

    200 published assessments from at least 10 landlords with every action coded, a 10% sample checked by a second person with at least 95% agreement, and the share of high-priority actions closed by the next assessment shown for each landlord.