Detailed engineering
After the decision to build, engineers turn the front-end design into the full set of drawings, 3D models, specifications and lists from which equipment is bought and the plant is built.
5
Milestones achieved, from 1953 to 2016.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1953
Pipes laid out on models
Large plants were once designed around scale models, with a model maker working beside the lead pipe designer. W. A. Bussard wrote in Caltech's Engineering and Science in October 1953 that "normal procedure in model design of chemical process, oil, or power plants is to put 90 percent of the piping on the model before any final drawings are made". Pipe center lines were brass rod 1/16 inch thick, so clashes between pipes, conduit and steel showed at once. In one lump-sum bid, local contractors who studied a model bid about 15% lower on piping than rivals who used only the drawings.
Lessona plant laid out in three dimensions shows clashes that flat drawings hide, and bidders price what they can see.
Credit
W. A. Bussard
1976
Plants designed on screen
The Computer-Aided Design Centre (CADCentre) began in 1967 as a research project at the University of Cambridge, by its successor AVEVA's account. AVEVA says it produced "the world's first 3D plant design system (PDMS) in 1976": a computer model of the whole plant in which pipes, equipment and steel are placed and checked, taking over the work of the physical model. Novedge, a software reseller, describes PDMS and Intergraph's PDS (Plant Design System) as the landmark plant design systems of the large engineering contractors.
Credit
CADCentre, later AVEVA
1994
Norway writes shared standards
Oil companies each wrote their own engineering specifications for contractors to follow. Norway's petroleum industry introduced the NORSOK standards in 1994 to cut costs on the Norwegian shelf; the name stands for "the Norwegian shelf's competitive position". The standards are, as far as possible, "intended to replace oil company specifications", and Norway's regulations refer to them. Standards Norway now manages them for the Federation of Norwegian Industries, Offshore Norge and the Norwegian Shipowners' Association.
Credit
the Norwegian petroleum industry; Standards Norway
2006
One program draws most isometrics
A piping isometric is a drawing of one pipe line in a three-dimensional view, with every fitting, weld and length needed to make and install it; a large plant needs thousands. When Intergraph bought Alias Ltd, a firm near Manchester, England, in February 2006, it said "virtually all automated piping isometric drawings produced daily" came from Alias's ISOGEN, which was built into most 3D plant design and shipbuilding systems, including Intergraph's own PDS and SmartPlant 3D. The same release described I-Route, an Alias product that routed pipes in a 3D model automatically by cost.
Credit
Alias Ltd; Intergraph
2016
Building before design is done
Bechtel reviewed the V.C. Summer nuclear project in South Carolina, where two Westinghouse AP1000 reactors were being built, and reported in February 2016 that "the detailed engineering design is not yet completed, which will subsequently affect the performance of procurement and construction" and that "the issued design is often not constructible". It recommended a push to clear the designer's engineering backlog and release "the over 1000 drawing holds". Work stopped in July 2017, and the governor released the report that September.
Lessonwhen construction starts before detailed design is finished, the gap returns as changes, rework and delay.
Credit
Bechtel, as reviewer
Watch for
AI-drawn P&IDs
A P&ID (piping and instrumentation diagram) is the master drawing of every pipe, valve and instrument in a plant unit. Kent, an engineering contractor, says its AI agents, trained on its own past work, produce a P&ID in about five hours where one "traditionally takes upwards of 30/40 hours", with engineers checking the output.
Achieved whena client or outside party publishes hours and checking errors for AI-drafted and conventional P&IDs of the same scope.
Claimed by
Kent, May 2025
Generative pipe routing in FEED
AVEVA says a generative design assistant in its Unified Engineering software analyzes design constraints and generates layout options, "for example pipe routing for Pre-FEED/FEED stage", with "significant productivity increase and time savings". It gives no figures.
Achieved whena user publishes pipe lengths, clash counts and hours for AI and manual layouts of the same unit.
Claimed by
AVEVA, January 2026
Open
01
An open plant design set
A complete, openly licensed detailed-design package for one plant, for anyone to test tools on: P&IDs in DEXPI (an open file format for P&IDs), a line list giving each pipe's size, material class and design conditions, a 3D model of equipment, steel and main piping, and isometrics as PCF files (the plain-text piping component format that ISOGEN reads). Base it on NETL's natural gas combined-cycle case B31A, whose process data are public.
The briefCredit · unclaimed02
Time and check P&ID drafting
A timed, blind trial of P&ID drafting. Three experienced designers and two AI tools each draw the P&IDs for the same five plant systems from the same process flow diagram and design basis. A checker who does not know which sheet came from whom scores each against a fixed checklist (missing valves and instruments, wrong line classes, missing vents and drains, wrong tie-ins), and the hours to a checked sheet are logged for each.
The briefCredit · unclaimed
Open 01 · the brief
An open plant design set
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A complete, openly licensed detailed-design package for one plant, for anyone to test tools on: P&IDs in DEXPI (an open file format for P&IDs), a line list giving each pipe's size, material class and design conditions, a 3D model of equipment, steel and main piping, and isometrics as PCF files (the plain-text piping component format that ISOGEN reads). Base it on NETL's natural gas combined-cycle case B31A, whose process data are public.
Why it is still open
Open tools are mostly tested on made-up drawings: pyDEXPI, the open DEXPI library, ships one reference P&ID and a generator of synthetic P&IDs for research datasets. NETL's report gives block flow diagrams, stream tables and equipment lists but no P&IDs or layout. Open pipe-routing test cases, such as APRpy's, are boxes in a grid rather than a plant. Searches of GitHub and the web in November 2026 found no openly licensed P&ID set, line list and 3D model for the same plant.
Built with what exists
pyDEXPI and DEXPI Studio for the P&IDs; FreeCAD with IfcOpenShell for the 3D model; plain-text PCF files for isometrics; NETL's 2025 Volume 1 data for case B31A; GitHub or Zenodo for release under CC BY 4.0.
First step
Turn the case B31A equipment list into a tag register and draw the first P&ID, for the boiler feedwater system, in pyDEXPI.
Done looks like
Every item in NETL's major equipment list for case B31A appears, with a tag, on a P&ID and in the 3D model; every line of 2 inches and larger has a line-list entry and a PCF isometric; all files open in pyDEXPI and IfcOpenShell without errors; and a second engineer's review log, with every finding closed, is published with the set.
Open 02 · the brief
Time and check P&ID drafting
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A timed, blind trial of P&ID drafting. Three experienced designers and two AI tools each draw the P&IDs for the same five plant systems from the same process flow diagram and design basis. A checker who does not know which sheet came from whom scores each against a fixed checklist (missing valves and instruments, wrong line classes, missing vents and drains, wrong tie-ins), and the hours to a checked sheet are logged for each.
Why it is still open
Kent's figure of about five hours against 30–40 is its own, under Watch for. Research tools complete flowsheets (Vogel, Schulze Balhorn and Schweidtmann, 2023) or correct P&IDs by rule (Schulze Balhorn and co-authors, 2025), but none publishes time and error counts against human designers on the same sheets.
Built with what exists
pyDEXPI and DEXPI Studio to draw and compare sheets; the published rule-based checks of Schulze Balhorn and co-authors as a first-pass checker; a general AI model with drawing tools (see the Note "Three working devices"); commercial P&ID tools where their licenses allow publication; the open design set above as the source of the systems.
First step
Write the checklist and design basis for one system, such as a pump loop, and time one designer drawing it.
Done looks like
25 sheets (five systems, five drafters), published with hours and checklist errors per sheet, and a stated result on whether AI drafts plus human correction take fewer total hours at the same or a lower error count.