Modernization replaces the worn or outdated parts of an existing elevator or escalator, such as the controller, drive, doors or machine, while keeping the shaft and often the rails.

5

Milestones achieved, from 1950 to 2021.

3

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1950

    Elevators without operators

    Otis installed its first Autotronic system, which ran a group of high-speed elevators with no attendant, in the 11-story Atlantic Refining Building in Dallas; Otis calls it the world's first building with its high-speed no-operator elevators. Two years earlier Otis had begun offering Elevoice, a recorded voice that told riders such things as "Please let the doors close," while attendants were still aboard, to help passengers adjust.

    LessonRiders needed time and help to trust a car with nobody at the controls.

    otis.com

    Credit

    Otis Elevator Company

  2. 1979

    Microprocessors run the cars

    Otis introduced Elevonic 101, an elevator control system run by microprocessors, developed with Hamilton Standard, an aerospace unit of the same parent company. Otis says it cut travel time by matching each car's speed, position and direction to the building's traffic. A new controller is now the core of a standard modernization package: the basic level of Otis's 2026 Gen3 modernization offer starts with a new controller and drive.

    otis.comnasdaq.com

    Credit

    Otis and Hamilton Standard

  3. 1990

    Riders choose floors first

    Destination dispatch asks riders to key in their floor in the lobby, then puts people going to the same or nearby floors into the same car, so cars make fewer stops. Joris Schroeder of Schindler wrote about destination dispatching in Elevator World in 1985, and with Paul Friedli was granted a patent for Schindler's Miconic 10 system in 1990; the UK lift consultancy Dunbar & Boardman says the first building to install it was the Hamburg Electric Company in Germany in 1990. Machine Design reported in 2007 that more than 3,700 Miconic 10 systems were installed and that Schroeder had first met skepticism.

    dunbarandboardman.blogspot.commachinedesign.com

    Credit

    Joris Schroeder and Paul Friedli, Schindler

  4. 2003

    France orders old lifts fixed

    France's Urbanisme et Habitat law of 2 July 2003 required owners of lifts installed before 24 August 2000 to carry out safety works within 15 years, in three stages ending in 2010, 2013 and 2018. The housing ministry said in 2014 that fatal lift accidents had fallen from 5 to 10 a year before the law to none since 2011, and that owners had spent about €6 billion. In 2013 the ministry pushed the second deadline back a year and dropped one required upgrade, better stopping accuracy at floors, for buildings not open to the public, after finding it cost about €19,000 per lift; a deputy's question in 2014 said 160,000 of France's 500,000 lifts were still not compliant.

    LessonA retrofit mandate can cut deaths, but each required upgrade has to be priced, or deadlines slip and measures are dropped.

    assemblee-nationale.fr

    Credit

    the French Parliament and the Ministry of Housing

  5. 2021

    A standard for robot riders

    Singapore published Technical Reference 93 in 2021, setting out how robots, lifts and automatic doors exchange data so that robots from any maker can call and ride lifts from any maker; KONE, which sat on the working group, noted that existing lifts need a controller upgrade with an API, a software interface, to take part. In 2025 it was replaced by a full national standard, SS 713:2025, which also covers what robots and lifts tell each other during fire evacuation and power cuts.

    singaporestandardseshop.sgarchify.coma-star.edu.sg

    Credit

    Singapore Standards Council working groups co-convened by CHART and HOPE Technik, with KONE and other firms

Watch for

  1. Modernized in one week

    KONE's US business says an eligible aging elevator can be modernized in as little as one week by replacing the components with the greatest effect on performance and reliability, against what it calls the misconception that modernization takes weeks or months.

    Achieved whenbuilding owners or an outside party publish out-of-service dates for a set of such jobs, with how many finished within a week and which parts each replaced.

    kone.us

    Claimed by

    KONE, November 2026

  2. Robots on older Otis lifts

    Otis says its cloud interface for robots, Otis Integrated Dispatch, works with most Otis equipment going back 30 years, and that it has worked with more than 60 robot companies.

    Achieved whena building owner, robot company or researcher outside Otis publishes ride logs from robots using the interface on older lifts, with the share of rides completed without a person stepping in.

    therobotreport.com

    Claimed by

    Otis, December 2025

  3. Robot-lift rules go global

    Singapore's National Robotics Programme says efforts are under way to raise SS 713 to an international standard at the International Organization for Standardization (ISO).

    Achieved whenISO publishes a standard or technical specification based on SS 713.

    a-star.edu.sg

    Claimed by

    the National Robotics Programme with A*STAR and partners, October 2025

Open

  1. 01

    A shared dispatch scorecard

    An open test for elevator dispatching, the logic that decides which car answers which call. It would fix a set of building models and passenger traffic patterns (morning arrivals, evening departures, lunchtime, travel between floors), run several dispatching methods on all of them, from conventional up-down buttons to destination dispatch and learned controllers, and publish average and worst-case waiting and journey times with code anyone can rerun.

    The brief
    Credit · unclaimed
  2. 02

    A robot-lift test kit

    An open-source lift emulator, software that plays the lift's side of the conversation, plus a set of scripted test cases that score how a robot fleet responds: calling a car, holding the doors, a car going out of service, a fire recall that sends cars to the ground floor, and a power cut. Everything runs in simulation, with no real lift.

    The brief
    Credit · unclaimed

Open 01 · the brief

A shared dispatch scorecard

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open test for elevator dispatching, the logic that decides which car answers which call. It would fix a set of building models and passenger traffic patterns (morning arrivals, evening departures, lunchtime, travel between floors), run several dispatching methods on all of them, from conventional up-down buttons to destination dispatch and learned controllers, and publish average and worst-case waiting and journey times with code anyone can rerun.

Why it is still open

Open simulators exist, including the Rust library elevator-core, which ships destination and estimated-time-to-destination strategies, and rl-elevator, a reinforcement-learning environment with simple baselines. A June 2025 paper by Nathan Vaartjes and Vincent François-Lavet trained a learned controller on a model of a six-elevator, 15-floor building at Vrije Universiteit Amsterdam and reported that it beat a rule-based one, and Wan, Lee and Shin published code with their 2024 paper on a learned controller that adjusts to traffic patterns. In a 2018 paper, researchers at the Jožef Stefan Institute and TH Köln used S-Ring, a much simplified model of a lift group made for benchmarking control strategies without a full simulator. Each project uses its own building and traffic, so results cannot be compared, and searches found no shared benchmark or leaderboard.

arxiv.orgdocs.rsdoi.orgth-koeln.de

Built with what exists

elevator-core or rl-elevator as the simulator; Python; traffic patterns written down from published lift-planning guidance and stated in the repository; reinforcement-learning libraries such as Stable-Baselines3 for learned controllers.

  1. First step

    Run elevator-core's built-in strategies on one 15-floor, six-car building under a morning-arrival pattern and publish the numbers with the exact settings.

  2. Done looks like

    At least five dispatching methods run on at least three buildings and four traffic patterns, each over 30 or more random seeds, with average and 95th-percentile waiting time, journey time and stops per trip, reproduced from the repository by a second person who did not write it.

Open 02 · the brief

A robot-lift test kit

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open-source lift emulator, software that plays the lift's side of the conversation, plus a set of scripted test cases that score how a robot fleet responds: calling a car, holding the doors, a car going out of service, a fire recall that sends cars to the ground floor, and a power cut. Everything runs in simulation, with no real lift.

Why it is still open

Singapore's SS 713:2025 sets out the data robots and lifts must exchange, including in emergencies, and in October 2025 Singapore opened ELEVATE @ BCA Braddell Campus, a physical and virtual sandbox for checking how robots, lifts and building systems work together. But no public test suite or published results from it were found. In South Korea, the Korea Institute for Robot Industry Advancement (KIRIA) assesses robots riding real lifts under the national standard KS B 7317, and two VD Company robots passed in June 2025, but that test covers the robot's own safety, such as tipping and obstacle stops, not a fleet's response to lift faults or fire recall. Otis offers a sandbox only for its own interface, and the open-source Open-RMF project offers a lift adapter template, not tests.

a-star.edu.sggithub.comasiae.co.kr

Built with what exists

ROS 2, Open-RMF and its lift adapter template, and the Gazebo simulator; a purchased copy of SS 713:2025 from the Singapore Standards eShop; an AI coding agent to write the emulator, held to the test cases (see the Note "Code no person read").

  1. First step

    Write the first five test cases against Open-RMF's lift messages and run the lift adapter template against a simple emulator in Gazebo.

  2. Done looks like

    At least 20 test cases, five of them emergencies or faults, run against at least two open robot software stacks in simulation, with a published pass and fail table and one outside team rerunning the kit.