Installation
Installation is the work of fitting a new elevator or escalator into a building: anchoring rails and doors in the shaft, setting the machine, hanging the car and testing everything before handover.
6
Milestones achieved, from 1857 to c. 2021.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1857
Passengers ride in a store
Otis installed a steam-powered passenger elevator in E.V. Haughwout & Co., a five-story store on Broadway in New York, and thousands of people came to the store to ride it. Otis calls it the company's first passenger elevator, and the IEEE History Center calls it the first passenger elevator.
Credit
Elisha Graves Otis's company, for the store owner Eder V. Haughwout
1880
Siemens shows an electric lift
At the Pfalzgau exhibition in Mannheim, Germany, Werner von Siemens showed an elevator driven by an electric motor mounted under the car, which climbed a toothed rack fixed to the wall. Siemens's own history calls it the world's first passenger elevator in a building; the IEEE History Center calls it the first electric-powered elevator, says it was too crude to compete with steam and hydraulic elevators, and says Siemens did not pursue it.
LessonA working demonstration is not a product; electric elevators took about two more decades to take over.
Credit
Werner von Siemens and Siemens & Halske
1900
Moving stairs win in Paris
An Otis moving staircase won the Grand Prix at the 1900 Exposition Universelle in Paris. Its inventor, Charles Seeberger, worked with Otis and coined the word "escalator"; by Otis's account, a US federal court ruled the trademark generic about 50 years later. Otis says the first two escalators used by London Transport went in at Earl's Court station in 1911, and 22 more followed on the Underground by 1915.
Credit
Charles Seeberger and the Otis Elevator Company
1903
Gearless traction for skyscrapers
In a traction elevator, steel ropes run over a grooved wheel turned by a motor, with a counterweight on the other side; in the gearless type the motor turns the wheel directly, with no gearbox. Otis dates its improved gearless traction machine to 1903, while the IEEE History Center says Otis developed the gearless traction elevator in 1902 and installed the first in New York in 1904. The IEEE says it made the hydraulic elevator obsolete almost overnight, and Otis says the Singer Building, the Metropolitan Life Tower and the Woolworth Building, each the world's tallest when finished, all used it.
Credit
Otis Elevator Company
1996
No machine room needed
KONE's MonoSpace put a thin, disc-shaped hoisting machine, the EcoDisc, inside the shaft itself, so the building no longer needed a machine room above the shaft. KONE calls it the world's first machine-room-less elevator and says the design became the industry standard. In the early 2000s Otis launched Gen2, a machine-room-less design that hangs the car on flat steel-reinforced belts instead of round steel ropes, and Otis says it has sold more than 1 million Gen2 units.
Credit
KONE; Otis for the belted Gen2
c. 2021
A robot drills the shaft
Schindler's R.I.S.E (Robotic Installation System for Elevators) hangs in the shaft from its own winch, scans the concrete to avoid the steel reinforcement, drills holes and sets the anchor bolts that hold rail brackets, doors and divider beams, following a plan prepared from the building's design data while an operator watches through cameras. A KHL trade article dated March 2022 described its launch, while Schindler said in May 2026 that it had launched five years earlier. The B1M filmed one at work on a tower in Vienna in 2024 and reported about 30 projects; by Schindler's count in May 2026, seven robots had worked at 36 job sites and set about 50,000 anchor bolts.
Credit
Schindler
Watch for
Forty percent faster shafts
Schindler says its R.I.S.E robots deliver up to 40% time savings in preparing and installing elevator shafts, and it added two robots to its fleet for a total of seven.
Achieved whena contractor or researcher outside Schindler publishes measured shaft-preparation times for comparable shafts done with and without the robot.
Claimed by
Schindler, May 2026
Open
01
Fit guide rails by robot
A robot arm that bolts short sections of elevator guide rail (the steel T-shaped tracks the car runs on) to brackets on a test frame at floor level, joins two sections end to end, and adjusts them until they are plumb and the right distance apart, checking its own work with a laser. All work is on a bench rig outside any shaft.
The briefCredit · unclaimed02
Week per floor, checked
A public table of every new elevator installation filed in New York City since December 2017, with building height, device type, permit date and sign-off date, and an analysis of days from permit to sign-off per floor, compared with the "about a week per floor" that is often quoted as the industry average.
The briefCredit · unclaimed
Open 01 · the brief
Fit guide rails by robot
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A robot arm that bolts short sections of elevator guide rail (the steel T-shaped tracks the car runs on) to brackets on a test frame at floor level, joins two sections end to end, and adjusts them until they are plumb and the right distance apart, checking its own work with a laser. All work is on a bench rig outside any shaft.
Why it is still open
Schindler's robot drills holes and sets anchor bolts, and Schindler said in May 2026 that it leaves "precision alignment, guide rail installation and overall ride quality" to skilled technicians. A US patent with a 2018 priority date, from Shanghai Haishunxi Intelligent Technology and Yanshan University, describes a self-climbing rail-installing robot and says rails are "generally installed manually," with workers checking precision by repeated inspection; no test results for it were found. A 2025 paper from Korean researchers taught a camera to find the 0.2 mm piano wire that installers hang as a plumb reference, so that a robot could locate itself in the shaft, but it did not fit rails. GitHub searches for "guide rail" and "elevator installation" found no rail-fitting project.
Built with what exists
A collaborative robot arm with a large payload and force sensing, such as a Universal Robots UR20; short sections of standard T-profile guide rail with brackets and clips from a lift-parts supplier; a line laser and dial gauges for checking; Hugging Face's LeRobot software to record demonstrations and train (see the Note "No download"); open robot models that learn a task from a few demonstrations, such as NVIDIA's GR00T 2 (see the Note "Five demonstrations per task") or Runway's Praxis-1 (see the Note "Open robot model weights").
First step
Build a 2 m steel test frame with bracket positions marked from a published layout drawing and record twenty fitting demonstrations by remote control of the arm.
Done looks like
Twenty filmed attempts on the test frame, each measured for how far the rail face strays from plumb and how far the rail spacing strays from target, against a tolerance stated in advance and taken from a published installation manual, with the same job done by an experienced fitter for comparison and a published tally of passes, failures and causes.
Open 02 · the brief
Week per floor, checked
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of every new elevator installation filed in New York City since December 2017, with building height, device type, permit date and sign-off date, and an analysis of days from permit to sign-off per floor, compared with the "about a week per floor" that is often quoted as the industry average.
Why it is still open
The B1M wrote in 2024 that the industry average for fitting an elevator is about a week per floor, with no data behind the figure. New York's Department of Buildings publishes every elevator permit filing, with permit and sign-off dates, as open data, but a search found no study that uses it to measure installation time. A query of the dataset on 18 November 2026 returned 6,613 initial filings for new elevators, 5,900 of them with a sign-off date.
Built with what exists
The NYC Open Data API for the "DOB NOW: Build Elevator Permit Applications" and "Elevator Device Details" datasets; Python with pandas or DuckDB; an AI model that answers fixed-choice questions to sort the free-text scope of work into categories, checked by hand (see the Note "A thousand questions, one pass").
First step
Download the new-installation filings through the API, keep those with both a permit date and a sign-off date, and plot days per story against building height.
Done looks like
Published code and data giving the median and spread of days from permit to sign-off per building story for new elevators, split by building height and device type; 100 randomly drawn jobs checked by hand against the filings; and a plain statement that the measure includes waiting for inspections, so it is an upper limit on working time and uses building stories, not elevator stops.