2003
Trees beat the fly-overs
Three of the high-voltage lines that failed first in the 14 August 2003 blackout, which hit an estimated 50 million people, did so because they touched overgrown trees. The utility flew over each line twice a year, and investigators concluded that fly-overs cannot judge the distance between a tree and the line above it and "need to be supplemented with ground patrols."
Lessonpatrols must measure clearance, not just look.
Credit
U.S.-Canada Power System Outage Task Force (findings)
2007
Tree checks become law
NERC's vegetation standard, FAC-003, received regulatory approval in 2007. Its current version requires owners to inspect all covered lines, mainly those at 200 kV and above, at least once every calendar year, with no more than 18 months between inspections.
Credit
NERC; FERC
2014
A robot on live lines
LineScout, built by IREQ, Hydro-Québec's research institute, rolls along energized high-voltage wires, climbs past hardware, inspects with cameras and an infrared tool, and makes small repairs. Hydro-Québec licensed it to National Grid for ten years of use in the UK in September 2014, and the New York Power Authority became the first US utility to use it in 2015, according to T&D World.
Credit
IREQ team led by Serge Montambault
2018
Drones fly out of sight
In April 2018 the FAA authorized Xcel Energy to fly inspection drones routinely beyond the operator's line of sight near Denver, which Utility Dive called "the first for a utility." Xcel estimated drone patrols at $200 to $300 per mile, against $1,200 to $1,600 per mile by helicopter.
Credit
Xcel Energy; FAA
2018
The Camp Fire's worn hook
In November 2018 a worn C-shaped hook broke on a tower of PG&E's Caribou-Palermo line in California, and the fire it started killed 85 people and destroyed 18,804 structures, by KTVU's figures. State regulator investigators found PG&E had not done a climbing inspection of that tower since 2001 and said one "could have identified the worn C-hook before it failed"; climbing inspections after the fire found 524 problems on the line.
Lessonpatrols that skip close-up checks of hardware can miss deadly wear.
Credit
California Public Utilities Commission's Safety and Enforcement Division (findings)
Watch for
One rule for long-range drones
The FAA has proposed a rule, Part 108, that would set standard conditions for routine low-altitude drone flights beyond the operator's sight, which today each need their own approval. The FAA reopened comments in January 2026, and no final rule had been found as of mid-November 2026.
Achieved whenthe final rule takes effect and utilities fly routine inspections under it.
Claimed by
FAA, August 2025
A utility's drone-in-a-box fleet
Dominion Energy reports 23 self-charging drone docks at substations and other sites, flown beyond sight from a remote operations center, and a larger drone with lidar (laser ranging) that checks wire-to-ground clearance on transmission lines. All claims come from Dominion staff, with no time or cost figures.
Achieved whenDominion or an outside party publishes results showing the docks doing routine line inspection.
Claimed by
Dominion Energy, June 2026
Open
01
Check tree maps against lidar
An open tool that flags trees tall enough and close enough to fall into a power line, using a free satellite-based tree-height map, and a test of its flags against tree heights measured by public airborne lidar.
The briefCredit · unclaimed02
Teach models to see wear
A public set of photographs of transmission hardware worn thin by years of movement, such as the hooks and plates that hold insulator strings, each with its wear measured by hand, and a model that estimates wear from a photo.
The briefCredit · unclaimed
Open 01 · the brief
Check tree maps against lidar
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open tool that flags trees tall enough and close enough to fall into a power line, using a free satellite-based tree-height map, and a test of its flags against tree heights measured by public airborne lidar.
Why it is still open
OpenTopography's public notebooks fetch government lidar along a transmission corridor but do not measure tree clearance, and Esri's clearance workflow runs in its commercial ArcGIS Pro software.
Built with what exists
Meta and World Resources Institute's canopy height maps, made with an AI model from satellite images and free under a CC BY 4.0 license; US 3DEP lidar through OpenTopography; power line routes from OpenStreetMap; Python.
First step
Pick a 10 km stretch of line in a county with lidar and compute tree heights both ways.
Done looks like
Along 100 km of line where lidar is available, the share of lidar-flagged trees that the satellite map also catches, and its false flags per kilometer, published with the code.
Open 02 · the brief
Teach models to see wear
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of photographs of transmission hardware worn thin by years of movement, such as the hooks and plates that hold insulator strings, each with its wear measured by hand, and a model that estimates wear from a photo.
Why it is still open
InsPLAD, which its authors call the first large real-world dataset of its kind for power line inspection, labels four kinds of corrosion, broken parts and bird nests, but not wear, and its authors say automated inspection is held back by "the lack of public real-world datasets." Investigators said a close inspection could have found the worn hook that started the Camp Fire.
Built with what exists
Hardware removed from service and photographed on a bench, with no work near live lines; calipers to measure lost metal; a camera rig that copies drone viewing angles; image segmentation models; InsPLAD's code as a baseline.
First step
Ask one utility or salvage yard for 50 retired hooks or plates, and photograph and measure each one.
Done looks like
At least 2,000 photos of at least five kinds of hardware, each with a caliper measurement, published under an open license, and a model whose wear estimates fall within 1 mm of the caliper reading on 90% of a held-out test set.