Distribution is the local, lower-voltage network of poles, wires, underground cables and pole transformers that carries power along streets into buildings, and the crews and systems that find faults and fix them.

7

Milestones achieved, from 1881 to 2019.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1881

    A town supply that failed

    On 26 September 1881 Godalming, in Surrey, England, began lighting its streets with power from a Siemens generator driven by water wheels at a tannery. By 1883 about a dozen private customers had 160 lamps, while Siemens said it needed 400 to 500 private lights to pay its way; the gas company undercut the price, and gas lamps returned on 1 May 1884. The town's plaque calls it the world's first public electricity supply; the Godalming Museum's narrower claim is that it was the first to light both houses and streets.

    Lessona network has to win enough customers to cover its fixed costs, or it closes.

    godalmingmuseum.co.uk

    Credit

    Godalming Borough Council; Calder and Barrett; Siemens

  2. 1882

    Edison's underground district

    Pearl Street Station supplied 110-volt direct current to about a quarter square mile of lower Manhattan through about 80,000 feet of underground conductors laid in conduit. IEEE counts about 85 customers with 400 lamps on the first day, 4 September 1882, and 513 customers with about 10,000 lamps within a year.

    ethw.org

    Credit

    Thomas Edison

  3. 1886

    Transformers make AC practical

    On 20 March 1886 William Stanley lit stores and offices on Main Street in Great Barrington, Massachusetts, stepping a 500-volt generator up to 3,000 volts for the wires and down to 100 volts for customers. IEEE calls it the first installation with the basic features of modern power systems: voltage raised for transmission and lowered for distribution.

    ethw.org

    Credit

    William Stanley

  4. 1935

    Wires reach the farms

    The US Rural Electrification Administration, created on 11 May 1935, lent money, mostly to local cooperatives, to build rural lines. By the REA's own count only 10.9% of US farms had electricity before 1935, a share that passed 78% by June 1949.

    ageconsearch.umn.edu

    Credit

    US Rural Electrification Administration; rural electric cooperatives

  5. 2012

    Self-healing switches in Chattanooga

    EPB, the city utility, installed more than 1,200 automated switches and sensors on 171 circuits that find a fault, cut off the damaged section and reroute power on their own. A 2016 Oak Ridge National Laboratory case study measured a 43.5% drop in annual outage minutes since 2012, and found that in one severe storm 40,579 customers had power back within 1 to 2 seconds.

    osti.gov

    Credit

    EPB, with a 2009 US Department of Energy grant; study by Jim Glass, Alexander Melin, Michael Starke and Ben Ollis

  6. 2017

    Hurricane Maria's blackout

    Maria wrecked the grids of Puerto Rico and the US Virgin Islands. By April 2018 Rhodium Group counted 3.4 billion lost customer-hours (one customer without power for one hour is one customer-hour), three times the next-largest blackout in US history, and about 53,000 Puerto Rico customers still had no power more than six months after the storm.

    Lessona storm that destroys most of a network at once can leave people without power for months, not days.

    rhg.com

    Credit

    Trevor Houser and Peter Marsters, Rhodium Group (measurement)

  7. 2019

    Power cut to prevent fires

    From 9 to 12 October 2019 PG&E switched off power to 732,348 customers in 35 California counties ahead of high winds, so its lines could not start wildfires, then patrolled the lines before turning power back on. It was the largest such shutoff to that date.

    Lessoncutting power has become a fire-prevention tool, and it moves the harm onto the customers who lose power.

    cpuc.ca.gov

    Credit

    PG&E; analysis by Technosylva for the California Public Utilities Commission's safety division

Watch for

  1. Five-day storm damage forecasts

    Technosylva says its software forecasts storm damage to the grid and how long restoration will take, up to five days ahead, with 82% average accuracy across storm types and 99% for total outages in large windstorms. CenterPoint Energy has reportedly deployed it, but no results are published.

    Achieved whena utility or regulator publishes measured forecast accuracy from real storms.

    tdworld.com

    Claimed by

    Technosylva, June 2026

  2. Restoration estimates that learn

    Three authors describe a model that revises a utility's estimated restoration time each time an outage record is updated. On about 243,000 storm outages from six utilities, they report a median 36.9% cut in customer-weighted error against the estimates the utilities published; the data are not public.

    Achieved whena utility uses it in live storms and publishes measured accuracy, or another group reproduces the result.

    arxiv.org

    Claimed by

    Bogireddy Sai Prasanna Teja, Valliappan Muthukaruppan and Carls Benjamin, arXiv preprint revised September 2026

Open

  1. 01

    Score restoration estimates

    A public archive of the estimated restoration times that utilities show on their outage maps during storms, and a score of how close each estimate came to when power actually came back.

    The brief
    Credit · unclaimed
  2. 02

    Archive hosting capacity maps

    A monthly public archive of the hosting capacity maps US utilities publish (maps of how much solar, storage or new load each part of the local grid can take without upgrades), in one shared format, with a log of what changed between releases.

    The brief
    Credit · unclaimed

Open 01 · the brief

Score restoration estimates

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public archive of the estimated restoration times that utilities show on their outage maps during storms, and a score of how close each estimate came to when power actually came back.

Why it is still open

The federal outage record, EAGLE-I, is collected from utilities' public outage maps but keeps only the number of customers out per county every 15 minutes, not the restoration estimates. The largest study of estimate accuracy found in this research used six utilities' own records, which are not published.

osti.govarxiv.org

Built with what exists

Python scripts that save public outage-map data on a schedule, within each site's terms of use; EAGLE-I counts as a cross-check; National Weather Service storm dates.

  1. First step

    Pick five utilities with public outage maps, save their data for a month of calm weather, and check the archive is complete.

  2. Done looks like

    For at least five utilities through at least three storms, every published estimate saved at 15-minute intervals, with the median error in hours and the share of customers restored after their first estimate, published with the archive.

Open 02 · the brief

Archive hosting capacity maps

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A monthly public archive of the hosting capacity maps US utilities publish (maps of how much solar, storage or new load each part of the local grid can take without upgrades), in one shared format, with a log of what changed between releases.

Why it is still open

The Department of Energy lists maps from 58 utilities and state agencies in 26 states, Washington, D.C., and Puerto Rico, but says it does not maintain them, and the maps differ in what they cover and how they are accessed. When California's utilities first published results, 60% to 70% showed zero capacity for new load, which the Interstate Renewable Energy Council says checks by the utilities could have prevented; it reports similar doubts in Minnesota and New York.

energy.govirecusa.org

Built with what exists

The DOE list; the public map services behind each map; GeoPandas; an agent that reruns the downloads and reports when a map's format changes.

  1. First step

    Check which of the 58 maps can be downloaded without an account, and save five of them.

  2. Done looks like