Industries / Construction and property / Heavy civil / Dredging

Pumping and placement

This work moves dredged sand and mud from the dredge to where it ends up, by pump, pipeline or barge, and records how much went where.

5

Milestones achieved, from 1857 to 2023.

0

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1857

    A pump replaces the buckets

    Nathaniel Lebby of Charleston, South Carolina, had patented a steam-driven pump for flooding and draining rice fields, and saw that it passed mud and sand. He adapted it into a centrifugal pump that sucked material up a pipe from the harbor bed. Fitted to the dredge boat General Moultrie to cut a channel through the Charleston bar, it had removed some 145,000 cubic yards by June 1858, by the South Carolina Encyclopedia's account. Royal IHC gives the vessel a 47 cm suction pipe and a 118 m³ hopper, and says it went to work in 1857 and sank in 1858. Sources disagree on the first: the encyclopedia calls it the world's first hydraulic suction dredge, while Prelini's 1911 textbook says suction dredging was first proposed in France in 1867, by Henri-Émile Bazin.

    scencyclopedia.orgroyalihc.comarchive.org

    Credit

    Nathaniel H. Lebby

  2. 1998

    An island rebuilt from channels

    Poplar Island in Chesapeake Bay covered more than 1,000 acres in 1847 and less than 4 acres by 1996. From March 1998 its builders raised containment dikes, rings of rock and earth, and filled the cells inside with material dredged from the shipping channels to the Port of Baltimore, carried 25 miles. By 2005, 10.6 million cubic yards had been placed and 45 acres of tidal marsh made, by EPA's 2007 case study, and an expansion finished on 20 January 2021 added 575 acres and room for 28 million cubic yards more, enough for material until about 2032, by the Corps' account.

    Lessonputting dredged material to use costs more than dumping it; the Port Administration estimated about $10 a cubic yard for beneficial use against $2 to $2.50 for other disposal.

    19january2021snapshot.epa.govdvidshub.net

    Credit

    Maryland Port Administration; US Army Corps of Engineers, Baltimore District; US Fish and Wildlife Service

  3. 2001

    Pumping sand past a river

    Training walls built at the mouth of the Tweed River, on the border of New South Wales and Queensland in Australia, were extended in 1962 to 1965. They trapped the sand that waves carry north along the coast, so a shallow bar grew at the river mouth and the southern Gold Coast beaches eroded. Since May 2001 a fixed system has carried the sand past: ten submerged jet pumps under a 450 m jetty on the south side draw sand into a pit, and pumps push it through a 400 mm steel pipeline under the river to outlets on the north side, where waves spread it along the beaches.

    Lessonwalls that fix a river mouth in place can starve the beaches beyond it, and the sand then has to be moved past by machine.

    tweedsandbypass.nsw.gov.autweedsandbypass.nsw.gov.au

    Credit

    the New South Wales and Queensland governments, with the City of Gold Coast

  4. 2007

    Munitions in the beach fill

    For a beach rebuilding project at Surf City, New Jersey, the Corps pumped sand from an offshore borrow area, the patch of seabed that sand is taken from, about 2.5 miles out. The military had dumped munitions there decades earlier. World War I-era fuzes and boosters, parts of artillery shells, began turning up on the new beach in 2007; more than 1,100 were removed and the beach was closed for searches, by the Philadelphia Inquirer's count, and the last sifting ended in April 2009. The Corps' Paul Greene put the cost of removal at about $18 million, against about $6 million for the first phase of the beach project.

    Lessonscreens on the dredge intake (1.25 in) and on the discharge (0.75 in) keep munitions out of the fill; Greene reports that more than 75 later projects using screens and inspection placed none on beaches.

    inquirer.cominquirer.comclu-in.org

    Credit

    US Army Corps of Engineers, Philadelphia and Baltimore districts

  5. 2023

    River mud piped 13 miles

    For the Upper Barataria marsh creation project in Louisiana, the contractor Weeks Marine dredged about 8.4 million cubic yards of sediment from the Mississippi River and pumped it through pipelines more than 13 miles (about 21 km) to fill close to 1,200 acres of open water and broken marsh in the Barataria Basin, which has lost more than 276,000 acres of land since the 1930s. NOAA, which led the project for the Deepwater Horizon oil spill trustees, called it its largest habitat restoration effort to date. Louisiana's Coastal Protection and Restoration Authority (CPRA) reported it finished in 2023, a year in which the state's projects pumped more than 22 million cubic yards of sediment.

    fisheries.noaa.govcoastal.la.gov

    Credit

    NOAA and the Louisiana Trustee Implementation Group; CPRA; Weeks Marine

Open

  1. 01

    Count the 70 percent

    A public tally of where the Corps' dredged material went in each of the last five fiscal years: for every dredging job, the volume and whether it was put to use (beaches, marsh, islands, fill) or disposed of (open water, confined sites, upland). Publish the national and district shares with the method and code.

    The brief
    Credit · unclaimed
  2. 02

    Test radiation-free density meters

    An independent, published comparison of the meters that measure how much sand is in a dredge pipe without a radioactive source: ultrasonic, electrical tomography and pressure-based meters, run side by side on sand and water mixtures in a test pipe loop, against a reference made by catching, timing and weighing samples.

    The brief
    Credit · unclaimed

Open 01 · the brief

Count the 70 percent

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public tally of where the Corps' dredged material went in each of the last five fiscal years: for every dredging job, the volume and whether it was put to use (beaches, marsh, islands, fill) or disposed of (open water, confined sites, upland). Publish the national and district shares with the method and code.

Why it is still open

Since January 2025 US law sets a national goal that at least 70% of suitable dredged material be used beneficially. The Corps gives only an estimate, "approximately 30-35%", with no published method, and its map viewer highlights beneficial use projects rather than giving shares. Deloitte wrote in October 2026 that matching dredged material to users is still "largely manual". No independent tally was found.

law.cornell.edubudm.el.erdc.dren.mildeloitte.com

Built with what exists

The Corps' public Dredging Information System, whose web app carries placement types and actual placement quantities for each job; contract solicitations on SAM.gov; a web agent to pull the placement terms from contract documents for a person to check (see the Note "Deleting 80% to start over"); Python and pandas. Web agents that read contract files make a job-by-job tally practical for one person.

ndc.ops.usace.army.mil

  1. First step

    Pull one district's fiscal 2025 jobs from the Dredging Information System and class each by placement type by hand, to fix the categories before automating.

  2. Done looks like

    A public table covering at least 90% of the reported dredged volume for five fiscal years, each job classed by placement; 50 jobs checked by hand against their contract documents, with the error rate; national and district shares with a stated range.

Open 02 · the brief

Test radiation-free density meters

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An independent, published comparison of the meters that measure how much sand is in a dredge pipe without a radioactive source: ultrasonic, electrical tomography and pressure-based meters, run side by side on sand and water mixtures in a test pipe loop, against a reference made by catching, timing and weighing samples.

Why it is still open

Dredges pay and get paid by the sand they move, measured mostly with nuclear density gauges that need licenses and security. A Corps-funded proof-of-concept at Pacific Northwest National Laboratory (report PNNL-17051) found the Corps wanted to replace its gauges for "cost, maintenance and security protocols, and paperwork", got inconclusive lab results and recommended tests on a dredge. Damen's 2019 field test of its CombiMeter (1 to 3% accuracy, by Damen's account) was the maker's own, and a 2026 conference paper that found an ultrasonic meter matched a nuclear reference was run on mineral thickener slurry, not dredge pipelines. No independent multi-meter dredging test was found.

digital.library.unt.edumaritime-executive.compapers.acg.uwa.edu.au

Built with what exists

A small recirculating loop of 50 to 100 mm pipe with a slurry pump, tank and graded sands; clamp-on ultrasonic transducers and a pressure-difference section; a scale and stopwatch for the reference samples; Python for the calibration and statistics.

  1. First step

    Build the tank, pump and sampling spout, and show that hand-caught samples repeat within 1% at a single density before adding any meter.

  2. Done looks like

    At least 300 timed reference samples across densities from 1,050 to 1,500 kg/m³ and two sand sizes, each paired with every meter's reading, published as open data with each meter's error by density band and flow speed.