6

Milestones achieved, from 1974 to 2020.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1974

    Councils can set noise rules

    Britain's Control of Pollution Act 1974 lets a local authority serve a notice on demolition and construction works that sets the plant and machinery that may be used, the working hours and the noise level allowed (section 60). A contractor can instead apply in advance for consent to an agreed method and noise controls (section 61). In England the approved code of practice is BS 5228, Part 1 for noise and Part 2 for vibration, approved in its 2014-amended form by an order of 2015.

    legislation.gov.uklegislation.gov.uklegislation.gov.uk

    Credit

    UK Parliament; British Standards Institution

  2. 1980

    Safe shaking for houses

    The US Bureau of Mines measured how 76 homes responded to 219 production blasts at surface mines and combined the results with nine other blasting studies. Its 1980 report, RI 8507, found that low-frequency vibration, below 40 Hz, is the more damaging, and proposed limits on peak particle velocity (PPV, the fastest speed at which the ground moves as the wave passes) of 0.75 inch per second (about 19 mm/s) for modern drywall houses and 0.50 in/s (about 13 mm/s) for older plaster-on-lath houses at low frequencies, and 2.0 in/s (about 51 mm/s) above 40 Hz. California's transport department still sets out these limits in its 2020 vibration manual, which names demolition among the sources of the highest construction vibration.

    onemine.orgdot.ca.gov

    Credit

    D. E. Siskind, M. S. Stagg, J. W. Kopp and C. H. Dowding, US Bureau of Mines

  3. 2003

    Lead falls from demolitions

    Mark Farfel and colleagues measured dust settling within 10 meters of three demolitions of blocks of old lead-painted row houses in Baltimore, Maryland. The rate at which lead fell in dust rose more than 40-fold during demolition, to a geometric mean of 410 micrograms per square meter per hour, and more than 6-fold during debris removal. Daily lead dust fall during demolition was on average 6 times the US Environmental Protection Agency's dust-lead standard for home floors.

    Lessonknocking down lead-painted housing spreads lead onto the streets around it unless the dust is held down.

    pmc.ncbi.nlm.nih.gov

    Credit

    Mark R. Farfel, O. A. Orlova, P. S. J. Lees, C. Rohde, P. J. Ashley, J. J. Chisolm

  4. 2017

    A dusty demolition fined

    Under Hong Kong's Air Pollution Control (Construction Dust) Regulation, demolishing a building is notifiable work: the contractor must tell the Environmental Protection Department (EPD) before starting, cover the building with impervious dust screens, spray water on the site and cover dusty material. On 30 October 2017 a contractor was fined HK$28,500 after EPD staff found a village house in Shek O being demolished without screens, without water spraying and without notice.

    epd.gov.hkinfo.gov.hk

    Credit

    Hong Kong Environmental Protection Department

  5. 2018

    A dust alarm reset

    London's guidance told construction and demolition sites to act when PM10 (airborne particles under 10 micrometers across) at the site boundary passed 250 micrograms per cubic meter over 15 minutes, a level based on one construction site studied in 1999. In 2016 Anna Font and Gary Fuller of King's College London, paid by HS2 Ltd, tested it against 1.8 million measurements from nine sites, demolition among them, and recommended 190 micrograms per cubic meter as an hourly mean, which lowered the rate of false alarms. The Institute of Air Quality Management (IAQM) put the new level in its monitoring guidance of October 2018.

    Lessonan alarm level set from a single site sounded for dust that construction did not cause.

    learninglegacy.hs2.org.ukassets.publishing.service.gov.uk

    Credit

    Anna Font and Gary Fuller, King's College London; HS2 Ltd; IAQM

  6. 2020

    Demolitions and children's lead

    Bezold and colleagues compared Detroit children under 6 whose blood lead first reached 5 micrograms per deciliter with children whose did not, from 2014 to 2018. Two or more demolitions within 400 feet (about 120 m) of home in the 45 days before the test raised the odds of elevated lead 1.75 times in 2014, 2.36 times in 2016 and 2.16 times in 2017, but not in 2018 (0.94). By then the city had paused demolitions from May to September 2018 in the five ZIP codes with the highest share of children with elevated lead, banned demolitions on windy days and put inspectors on more than 90% of sites; the authors say the tighter controls may explain the 2018 result.

    Lessondust controls at house demolitions appear to matter for children's lead, so they need keeping up and checking.

    ncbi.nlm.nih.gov

    Credit

    C. Bezold, S. J. Bauer, J. P. Buckley, S. Batterman, H. Haroon, L. Fink

Watch for

  1. Cheap sensors miss dust peaks

    The IAQM says work by its members shows that some low-cost PM10 sensor systems now common at construction site boundaries under-report, especially near or above its action level of 190 micrograms per cubic meter, so dust events may go undetected. It says there is limited published evidence on such sensors at these levels, and notes that the UK's MCERTS certification bulletin PC4 of 1 July 2025 gives a typical range for indicative sensors of up to 150 micrograms per cubic meter.

    Achieved whena field comparison against a reference instrument at construction or demolition sites is published that measures the under-reading.

    iaqm.co.uk

    Claimed by

    Institute of Air Quality Management, September 2025

  2. Dust sensors fade with age

    Tristalee Mangin and colleagues at the University of Utah report that Alphasense OPC-N3 sensors, a model that India's Center for Study of Science, Technology and Policy (CSTEP) lists among those in construction-dust sensor nodes, drifted after about 10 to 12 months beside reference monitors in Salt Lake City, with correction slopes rising up to sevenfold. They traced the worst case to a corroded mirror inside the sensor.

    Achieved whenthe paper passes peer review or another group finds the same drift in sensors used at construction sites.

    egusphere.copernicus.orgcstep.in

    Claimed by

    Mangin et al., preprint, October 2026

Open

  1. 01

    Dust sensors at demolition levels

    A public field test of four or five low-cost PM10 sensor nodes set beside the reference-grade monitors that demolition contractors already run at their site boundaries, reporting how each reads in the hours when PM10 is near and above the 190 micrograms per cubic meter action level. The nodes go on the public side of the site fence, on a neighbor's property or council street furniture with permission, and nobody enters the work area.

    The brief
    Credit · unclaimed
  2. 02

    Vibration records for demolition machines

    An open table of measured ground vibration, as peak particle velocity (PPV) in millimeters per second, against distance from demolition machines: hydraulic breakers, concrete crushers, high-reach excavators and falling debris. Collect it from monitoring reports filed with planning authorities and from published studies, fit a falloff curve for each machine type, and compare it with the estimating formula engineers use now.

    The brief
    Credit · unclaimed

Open 01 · the brief

Dust sensors at demolition levels

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public field test of four or five low-cost PM10 sensor nodes set beside the reference-grade monitors that demolition contractors already run at their site boundaries, reporting how each reads in the hours when PM10 is near and above the 190 micrograms per cubic meter action level. The nodes go on the public side of the site fence, on a neighbor's property or council street furniture with permission, and nobody enters the work area.

Why it is still open

The IAQM said in September 2025 that there is "limited published evidence" on low-cost sensors at the high concentrations found around construction sites. The largest evaluation found, CSTEP's year-long test of six sensor models in 2024–25, was run at a reference facility in Bengaluru, not at construction sites, and CSTEP warns that sensors tested in clean conditions may do poorly where coarse dust dominates.

iaqm.co.ukcstep.in

Built with what exists

Sensor nodes built on Plantower PMS7003, Sensirion SPS30, Alphasense OPC-R2 and OPC-N3 sensors; the hourly data from the contractor's heated-inlet optical monitor, or a rented reference-equivalent instrument such as a Palas Fidas 200 set beside the nodes; a weather station for wind; Python.

  1. First step

    Ask a demolition contractor that already runs boundary monitoring under IAQM guidance to share its monitor's hourly data and position, and ask the neighbor or the council for a place outside the fence to mount three nodes beside it.

  2. Done looks like

    At least three demolition sites, four weeks each, with hourly readings paired with the reference, and for each sensor its bias, its slope and the share of hours above 190 micrograms per cubic meter that it missed, all data public.

Open 02 · the brief

Vibration records for demolition machines

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table of measured ground vibration, as peak particle velocity (PPV) in millimeters per second, against distance from demolition machines: hydraulic breakers, concrete crushers, high-reach excavators and falling debris. Collect it from monitoring reports filed with planning authorities and from published studies, fit a falloff curve for each machine type, and compare it with the estimating formula engineers use now.

Why it is still open

California's transport department wrote in April 2020 that there is "no information available about measured vibration amplitudes from hydraulic breakers used in pavement and concrete demolition projects." It estimates them instead by scaling a pile-driver formula from a reference breaker of 5,000 ft-lb (about 6.8 kJ) said to give 0.24 inch per second (about 6.1 mm/s) at 25 feet (7.6 m), and its table of source levels for other equipment lists only seven machine types. A search found studies of hydraulic hammers used to compact ground, not a shared set of demolition measurements.

dot.ca.gov

Built with what exists

Vibration monitoring reports attached to demolition and construction management plans on council planning portals; published papers; pdfplumber and an AI model such as Claude to pull measurements out of PDF tables, each one checked by a person; Python and SciPy to fit the curves.

  1. First step

    Search one London borough's planning portal for demolition applications that include vibration monitoring reports, and log the first 20 measurements in a spreadsheet.

  2. Done looks like

    At least 300 measurements from at least 30 sites, each tagged with machine type, rated energy or weight, distance and ground type, published as a CSV file with the code, together with the error of the Caltrans formula against them.