Demolition by machine
Demolition by machine is taking a structure apart with excavators, cranes and smaller machines that carry hammers, shears and crushers, working from the outside, from the top down or from inside.
4
Milestones achieved, from 1967 to 2012.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1967
Hammers go on excavators
A hydraulic breaker is a hammer driven by oil pressure that fits on an excavator arm in place of the bucket. Krupp Berco Bautechnik's HM 400, shown at the Hannover fair in 1967, sold more than 2,000 units, and the French firm Montabert also claims the first breaker; both built theirs from hydraulic rock drills. By 2008 the usual tools on a high-reach demolition machine were a breaker or crushers and shears for concrete, masonry and steel, International Construction reported.
Lessonearly breakers broke themselves when fired without the tool pressed against the work, because rock drills are always in contact with the rock.
Credit
Krupp Berco Bautechnik; Montabert
2005
Long booms replace the ball
Long-reach demolition excavators were developed in the 1980s and 1990s as a more accurate and safer alternative to a crawler crane swinging a wrecking ball into a building, International Construction reported in 2008. In 2005 Kobelco modified an SK3500D crawler crane chassis to reach 65 m, then the world record, at a list price of JPY 1 billion (US$8.7 million); telescopic booms later went higher. Kocurek of Ipswich, UK, was then the European market leader for booms over 40 m.
Credit
Kobelco; Kocurek
2008
A tower jacked down
In Kajima's Cut and Down method, jacks at every column of the lowest floor carry the whole building while crews take that floor apart. Then all the jacks lower the building by one story and the cycle repeats, so the work stays near the ground. A reinforced concrete core wall is added first to keep the building's resistance to earthquakes. Kajima first used it in 2008 on its own former head office in Tokyo, a steel building.
Credit
Kajima Corporation; described by Noboru Yuasa of Nihon University (2021)
2012
Hotel shrinks under a lid
Taisei's Tecorep system (spelled "Tecolep" in Yuasa's paper) keeps the top floor as a closed lid on temporary columns with built-in jacks, takes apart the floor beneath it, and lowers the lid a floor at a time. Parts are lowered inside the building, and the energy of the falling loads is used to generate electricity. Taisei first used it in 2011 at the Otemachi Financial Center in Tokyo and then in 2012 and 2013 on the Akasaka Prince Hotel's 39-story, 138.9 m new building. Takenaka's similar "hat" method took down an 88 m former hotel in Osaka in 2012.
Credit
Taisei Corporation; Takenaka Corporation; described by Noboru Yuasa of Nihon University
Watch for
Diagonal cuts speed tall towers
Kajima researchers report cutting floor slabs on a slant with a purpose-built concrete cutter so that sections lift out more easily, used in the demolition of a 40-story, 162 m office tower in Japan completed in 1970. They report an average cutting speed of 0.78 m per minute and a schedule about two months, or 20%, shorter than cutting blocks for tower cranes.
Achieved whena second project, or a party outside Kajima, publishes the time saved against block demolition.
Claimed by
Kajima Corporation (Takahiro Nakamura, Takeshi Ishida and Tomohiro Yoshida), at the Creative Construction Conference in Petrčane, near Zadar, Croatia, June 2025
Open
01
Flag a wall left standing
A program that watches video from a fixed site camera or an excavator's cab camera and warns when a wall more than one story high has been left standing with nothing bracing it, the condition US rule 29 CFR 1926.854(b) forbids. It is built and tested on public demolition videos and photos only.
The briefCredit · unclaimed02
Strip drywall whole by robot
A robot arm that finds the screws in a plasterboard (drywall) wall, backs them out and lifts each board off whole so it can be reused, trained and tested on a mock wall built from new board in a workshop. New board only, since the joint compound in old buildings can contain asbestos.
The briefCredit · unclaimed
Open 01 · the brief
Flag a wall left standing
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A program that watches video from a fixed site camera or an excavator's cab camera and warns when a wall more than one story high has been left standing with nothing bracing it, the condition US rule 29 CFR 1926.854(b) forbids. It is built and tested on public demolition videos and photos only.
Why it is still open
In the 2013 Philadelphia collapse the freestanding wall grew over two working days in photos, including one taken by a member of the public, before it fell. A search found no detector for freestanding walls during demolition. The nearest work, by J. Kallas and R. Napolitano of Penn State (2023), finds walls that have already collapsed in photos taken after disasters such as the 2020 Beirut explosion. A public set of 99 demolition-site images on Roboflow labels uncovered waste and missing safeguards, not walls.
Built with what exists
Public demolition videos and news photos; an open segmentation model such as Meta's SAM 2 to outline walls and floors; a monocular depth model such as Depth Anything V2 to estimate a wall's height in stories; Python and OpenCV.
First step
Collect 100 frames from public demolition videos, have two people label them separately, and measure how often they agree.
Done looks like
500 frames from at least 50 different public demolition videos, labeled by two people as "wall over one story standing alone" or not, with the detector's precision and recall on a held-out set published, and its false alarms counted over 10 hours of footage in which no wall stood alone.
Open 02 · the brief
Strip drywall whole by robot
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A robot arm that finds the screws in a plasterboard (drywall) wall, backs them out and lifts each board off whole so it can be reused, trained and tested on a mock wall built from new board in a workshop. New board only, since the joint compound in old buildings can contain asbestos.
Why it is still open
Demolition robots in use are remote-controlled, not autonomous, according to Christopher Rausch and colleagues at the University of Texas at Austin, who rated building parts for robotic removal in 2024 but did not build a robot. Meijo University and Shimizu Corporation built a robot in 2010 that took down ceiling boards by cutting them, working with people beside it, not one that removes boards whole. Autodesk Research's sensors found metal studs behind walls with 95% accuracy under controlled conditions, and it projected US$121 of reusable board against US$102 of disposal cost for one test section of a school being demolished, but the boards were not removed by robot.
Built with what exists
A collaborative arm such as a Universal Robots UR10e with a screwdriver end tool and a suction lifter; a wrist camera; a stud and screw detector; LeRobot to record teleoperated demonstrations and train a policy (see the Note "No download"); NVIDIA's open GR00T 2 robot model, reported to need few demonstrations per task (see the Note "Five demonstrations per task").
First step
Build one mock stud wall with new board and screws at standard spacing, and time a person removing it whole five times.
Done looks like
20 filmed attempts on a mock wall of four 1.2 by 2.4 m boards, with a published tally of boards removed unbroken, screws missed and minutes per board, next to a person doing the same with a cordless drill.